blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2397620

EP2397620 - Laminated beam construction [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.05.2018
Database last updated on 28.09.2024
FormerThe patent has been granted
Status updated on  09.06.2017
FormerGrant of patent is intended
Status updated on  04.04.2017
Most recent event   Tooltip10.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 12.08.2020  [2020/33]
Applicant(s)For all designated states
Paroc Group Oy
Energiakuja 3
00180 Helsinki / FI
For all designated states
Woodpolis
Puusepänkatu 3
88900 Kuhmo / FI
For all designated states
Oy Timber Frame Ltd
Kutomokuja 2 A 4
30110 Forssa / FI
[2015/47]
Former [2011/51]For all designated states
Paroc Oy Ab
Läkkisepäntie 23
00621 Helsinki / FI
For all designated states
Woodpolis
Puusepänkatu 3
88900 Kuhmo / FI
For all designated states
Oy Timber Frame Ltd
Kutomokuja 2 A 4
30110 Forssa / FI
Inventor(s)01 / Heino, Kyösti
Laitakatu 5
87500 Kajaani / FI
02 / Sevon, Jukka
Brobackavägen 4 A 2
21600 Pargas / FI
03 / Steenroos, Matti
Soitinkorpi 1 B
13430 Hämeenlinna / FI
 [2011/51]
Representative(s)LEITZINGER OY
Tammasaarenkatu 1
00180 Helsinki / FI
[2017/28]
Former [2011/51]LEITZINGER OY
Tammasaarenkatu 1
00180 Helsinki / FI
Application number, filing date11168069.030.05.2011
[2011/51]
Priority number, dateFI2010000568815.06.2010         Original published format: FI 20105688
[2011/51]
Filing languageFI
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2397620
Date:21.12.2011
Language:EN
[2011/51]
Type: A3 Search report 
No.:EP2397620
Date:05.12.2012
Language:EN
[2012/49]
Type: B1 Patent specification 
No.:EP2397620
Date:12.07.2017
Language:EN
[2017/28]
Search report(s)(Supplementary) European search report - dispatched on:EP07.11.2012
ClassificationIPC:E04C3/14, E04C3/29, E04C1/40, E04C2/24, E04B2/70
[2011/51]
CPC:
E04C3/14 (EP,FI); E04C2/243 (EP,FI); E04B2/702 (EP,FI);
E04C1/40 (EP,FI); E04C3/122 (EP,FI); E04C3/29 (EP,FI);
E04B2002/0208 (EP); E04B2002/0228 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/28]
Former [2011/51]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Lamellierte Balkenkonstruktion[2011/51]
English:Laminated beam construction[2011/51]
French:Construction de poutre en lamellé-collé[2011/51]
Examination procedure21.01.2013Amendment by applicant (claims and/or description)
05.06.2013Examination requested  [2013/29]
05.04.2017Communication of intention to grant the patent
30.05.2017Fee for grant paid
30.05.2017Fee for publishing/printing paid
30.05.2017Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  05.04.2017
Opposition(s)13.04.2018No opposition filed within time limit [2018/25]
Fees paidRenewal fee
15.05.2013Renewal fee patent year 03
23.05.2014Renewal fee patent year 04
13.05.2015Renewal fee patent year 05
17.05.2016Renewal fee patent year 06
19.05.2017Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.05.2011
AL12.07.2017
AT12.07.2017
CY12.07.2017
CZ12.07.2017
DK12.07.2017
ES12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
MK12.07.2017
NL12.07.2017
PL12.07.2017
PT12.07.2017
RO12.07.2017
RS12.07.2017
SI12.07.2017
SK12.07.2017
SM12.07.2017
TR12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
[2020/33]
Former [2020/31]HU30.05.2011
AT12.07.2017
CY12.07.2017
CZ12.07.2017
DK12.07.2017
ES12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
MK12.07.2017
NL12.07.2017
PL12.07.2017
PT12.07.2017
RO12.07.2017
RS12.07.2017
SI12.07.2017
SK12.07.2017
SM12.07.2017
TR12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
Former [2020/27]HU30.05.2011
AT12.07.2017
CZ12.07.2017
DK12.07.2017
ES12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
NL12.07.2017
PL12.07.2017
PT12.07.2017
RO12.07.2017
RS12.07.2017
SI12.07.2017
SK12.07.2017
SM12.07.2017
TR12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
Former [2020/15]AT12.07.2017
CZ12.07.2017
DK12.07.2017
ES12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
NL12.07.2017
PL12.07.2017
RO12.07.2017
RS12.07.2017
SI12.07.2017
SK12.07.2017
SM12.07.2017
TR12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
Former [2019/06]AT12.07.2017
CZ12.07.2017
DK12.07.2017
ES12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
NL12.07.2017
PL12.07.2017
RO12.07.2017
RS12.07.2017
SI12.07.2017
SK12.07.2017
SM12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
Former [2018/39]AT12.07.2017
CZ12.07.2017
DK12.07.2017
ES12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
NL12.07.2017
PL12.07.2017
RO12.07.2017
RS12.07.2017
SI12.07.2017
SK12.07.2017
SM12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
Former [2018/24]AT12.07.2017
CZ12.07.2017
DK12.07.2017
ES12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
NL12.07.2017
PL12.07.2017
RO12.07.2017
RS12.07.2017
SK12.07.2017
SM12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
Former [2018/23]AT12.07.2017
CZ12.07.2017
DK12.07.2017
ES12.07.2017
HR12.07.2017
LT12.07.2017
LV12.07.2017
NL12.07.2017
PL12.07.2017
RO12.07.2017
RS12.07.2017
SK12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
Former [2018/21]AT12.07.2017
CZ12.07.2017
DK12.07.2017
ES12.07.2017
HR12.07.2017
LT12.07.2017
LV12.07.2017
NL12.07.2017
PL12.07.2017
RS12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
Former [2018/12]AT12.07.2017
ES12.07.2017
HR12.07.2017
LT12.07.2017
LV12.07.2017
NL12.07.2017
PL12.07.2017
RS12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
Former [2018/11]AT12.07.2017
ES12.07.2017
HR12.07.2017
LT12.07.2017
NL12.07.2017
PL12.07.2017
RS12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
Former [2018/10]AT12.07.2017
HR12.07.2017
LT12.07.2017
NL12.07.2017
RS12.07.2017
NO12.10.2017
Former [2018/08]LT12.07.2017
NL12.07.2017
NO12.10.2017
Former [2018/07]LT12.07.2017
NO12.10.2017
Documents cited:Search[Y]CH692993  (FRINORM AG [LI]) [Y] 1-6 * column 5, line 52 - column 6, line 9; figure 7 * * column 3, lines 24-37 *;
 [Y]GB1596780  (ROCKWOOL INT) [Y] 1-6 * page 2, lines 6-13; figures 1-2 *;
 [Y]EP2141303  (KNAUF INSULATION GMBH [AT]) [Y] 1-6 * paragraph [0008] *;
 [Y]GB2302346  (ROCKWOOL LTD [GB]) [Y] 1-6 * page 3, lines 20-23 * * page 5, lines 24-31 *;
 [Y]DE2309878  (BAU FRITZ INH JOHANN FRITZ FA [DE]) [Y] 2,3 * figures 1-8; claim 1 *;
 [Y]DE29923387U  (JASPERS HELMUT [DE]) [Y] 6 * abstract *;
 [A]DE2650915  (IHLEFELD KARL HELMUT) [A] 1-6 * page 6; figures 1-2 *;
 [A]WO03008724  (SAINT GOBAIN ISOVER AS [DK], et al) [A] 1-6 * page 6, lines 3-9; figure 1; claim 1 *
by applicantSE457456
 SE303580
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.