blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3336412

EP3336412 - MOON APPEARANCE GENERATING SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.02.2021
Database last updated on 28.09.2024
FormerThe patent has been granted
Status updated on  06.03.2020
FormerGrant of patent is intended
Status updated on  28.10.2019
FormerExamination is in progress
Status updated on  26.03.2019
FormerRequest for examination was made
Status updated on  21.12.2018
FormerThe application has been published
Status updated on  18.05.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
CoeLux S.r.l.
Via Cavour 2
Polo Tecnologico ComoNExT
22074 Lomazzo (CO) / IT
[2020/15]
Former [2018/25]For all designated states
CoeLux S.r.l.
Via Cavour 2
Polo Tecnologico ComoNExT
22074 Lomazzo (CO) / IT
Inventor(s)01 / Ragazzi, Paolo
Via Cassinari 28
20138 Milano / IT
 [2018/25]
Representative(s)Grättinger Möhring von Poschinger Patentanwälte Partnerschaft mbB
Wittelsbacherstrasse 2b
82319 Starnberg / DE
[2020/15]
Former [2018/25]Kramer Barske Schmidtchen Patentanwälte PartG mbB
European Patent Attorneys
Landsberger Strasse 300
80687 München / DE
Application number, filing date16203825.113.12.2016
[2018/25]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3336412
Date:20.06.2018
Language:EN
[2018/25]
Type: B1 Patent specification 
No.:EP3336412
Date:08.04.2020
Language:EN
[2020/15]
Search report(s)(Supplementary) European search report - dispatched on:EP02.05.2017
ClassificationIPC:F21S8/02, F21S10/00, F21V9/02, // F21V11/08, F21Y115/10
[2018/25]
CPC:
F21S8/026 (EP,US); F21V9/40 (US); F21S10/00 (EP);
F21V3/00 (US); F21V7/0008 (US); F21V9/02 (EP);
F21V9/08 (US); F21V11/08 (EP); F21W2121/008 (US);
F21Y2115/10 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/04]
Former [2018/25]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:MONDSIMULATIONSEINRICHTUNG[2018/25]
English:MOON APPEARANCE GENERATING SYSTEM[2018/25]
French:SYSTÈME DE SIMULATION DE L'APPARANCE DE LA LUNE[2018/25]
Examination procedure13.12.2018Amendment by applicant (claims and/or description)
14.12.2018Examination requested  [2019/04]
14.12.2018Date on which the examining division has become responsible
29.03.2019Despatch of a communication from the examining division (Time limit: M06)
19.09.2019Reply to a communication from the examining division
29.10.2019Communication of intention to grant the patent
20.02.2020Receipt of the translation of the claim(s)
26.02.2020Fee for grant paid
26.02.2020Fee for publishing/printing paid
Opposition(s)12.01.2021No opposition filed within time limit [2021/11]
Fees paidRenewal fee
21.12.2018Renewal fee patent year 03
20.12.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.12.2016
AL08.04.2020
AT08.04.2020
CY08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MK08.04.2020
MT08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
TR08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
IE13.12.2020
LU13.12.2020
BE31.12.2020
CH31.12.2020
LI31.12.2020
[2022/33]
Former [2022/32]HU13.12.2016
AL08.04.2020
AT08.04.2020
CY08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MK08.04.2020
MT08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
TR08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
IE13.12.2020
LU13.12.2020
CH31.12.2020
LI31.12.2020
Former [2022/27]HU13.12.2016
AL08.04.2020
AT08.04.2020
CY08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MT08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
TR08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
IE13.12.2020
LU13.12.2020
CH31.12.2020
LI31.12.2020
Former [2021/52]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
IE13.12.2020
LU13.12.2020
CH31.12.2020
LI31.12.2020
Former [2021/46]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
IE13.12.2020
LU13.12.2020
Former [2021/40]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/24]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/10]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/09]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/08]AL08.04.2020
DK08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/04]AL08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
RS08.04.2020
SE08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/01]FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
RS08.04.2020
SE08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/51]FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
RS08.04.2020
SE08.04.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/50]FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
SE08.04.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/48]FI08.04.2020
LT08.04.2020
NL08.04.2020
SE08.04.2020
NO08.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/47]LT08.04.2020
NO08.07.2020
IS08.08.2020
Former [2020/46]IS08.08.2020
Documents cited:Search[A]CN104565997  (NANJING BIRCHEN IND DESIGN CO LTD) [A] 1 * figures 1,2 *;
 [I]WO2015173770  (COELUX SRL [IT], et al) [I] 1-3,5-15 * page 6, column 4 - column 17 * * figure 1 *;
 [A]US2016227618  (MEERBEEK BERENT WILLEM [NL], et al) [A] 1 * paragraph [0024] ** figure 6 *;
 [I]WO2016134733  (COELUX SRL [IT], et al) [I] 1-15 * paragraphs [0018] , [0031] , [0034] , [0037] , [0038] , [0040] , [0045] , [0049] , [0051] , [0 57] , [0060] , [0061] , [0124] * * figures 1,10 *
by applicantWO2009156347
 WO2009156348
 WO2014076656
 WO2015172794
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.