blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3547751

EP3547751 - TRANSMISSION BANDWIDTH CONFIGURATION METHOD AND TRANSMISSION NODE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  30.08.2024
Database last updated on 28.09.2024
FormerThe patent has been granted
Status updated on  22.09.2023
FormerGrant of patent is intended
Status updated on  22.08.2023
FormerExamination is in progress
Status updated on  02.07.2021
FormerRequest for examination was made
Status updated on  30.08.2019
FormerThe international publication has been made
Status updated on  11.05.2018
Most recent event   Tooltip30.08.2024No opposition filed within time limitpublished on 02.10.2024 [2024/40]
Applicant(s)For all designated states
ZTE Corporation
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan
Shenzhen, Guangdong 518057 / CN
[2019/40]
Inventor(s)01 / XIN, Yu
c/o ZTE Corporation
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park, Nanshan District
Shenzhen Guangdong 518057 / CN
02 / ZHOU, Wubin
c/o ZTE Corporation
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park, Nanshan District
Shenzhen Guangdong 518057 / CN
 [2019/40]
Representative(s)Vossius & Partner Patentanwälte Rechtsanwälte mbB
Siebertstrasse 3
81675 München / DE
[2019/40]
Application number, filing date17866655.819.10.2017
[2019/40]
WO2017CN106918
Priority number, dateCN20161096374004.11.2016         Original published format: CN201610963740
[2019/40]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018082450
Date:11.05.2018
Language:ZH
[2018/19]
Type: A1 Application with search report 
No.:EP3547751
Date:02.10.2019
Language:EN
[2019/40]
Type: B1 Patent specification 
No.:EP3547751
Date:25.10.2023
Language:EN
[2023/43]
Search report(s)International search report - published on:CN11.05.2018
(Supplementary) European search report - dispatched on:EP27.07.2020
ClassificationIPC:H04W28/20, H04W72/04, H04L5/00
[2020/35]
CPC:
H04L5/0007 (EP,CN); H04W72/0453 (CN,US); H04L27/2607 (CN,US);
H04L5/001 (EP,CN,US); H04L5/0044 (CN,US); H04W28/20 (EP,CN,US);
H04W28/26 (CN,US); H04W72/04 (EP,CN) (-)
Former IPC [2019/40]H04W28/20, H04W72/04
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/40]
TitleGerman:VERFAHREN ZUR KONFIGURATION DER ÜBERTRAGUNGSBANDBREITE UND ÜBERTRAGUNGSKNOTEN[2019/40]
English:TRANSMISSION BANDWIDTH CONFIGURATION METHOD AND TRANSMISSION NODE[2019/40]
French:PROCÉDÉ DE CONFIGURATION DE BANDES PASSANTES DE TRANSMISSION ET NOEUD DE TRANSMISSION[2019/40]
Entry into regional phase22.08.2019Translation filed 
03.06.2019National basic fee paid 
03.06.2019Search fee paid 
03.06.2019Designation fee(s) paid 
03.06.2019Examination fee paid 
Examination proceduredeletedDeletion: Application deemed to be withdrawn, date of legal effect  [2019/40]
03.06.2019Examination requested  [2019/40]
19.06.2019Despatch of communication that the application is deemed to be withdrawn, reason: filing fee / search fee not paid in time  [2019/40]
23.02.2021Amendment by applicant (claims and/or description)
05.07.2021Despatch of a communication from the examining division (Time limit: M04)
15.11.2021Reply to a communication from the examining division
01.02.2022Despatch of a communication from the examining division (Time limit: M06)
11.08.2022Reply to a communication from the examining division
23.08.2023Communication of intention to grant the patent
13.09.2023Fee for grant paid
13.09.2023Fee for publishing/printing paid
13.09.2023Receipt of the translation of the claim(s)
Divisional application(s)EP23171305.8  / EP4236167
Opposition(s)26.07.2024No opposition filed within time limit [2024/40]
Request for further processing for:The application is deemed to be withdrawn due to failure to file the translation
22.08.2019Request for further processing filed
22.08.2019Full payment received (date of receipt of payment)
Request granted
04.09.2019Decision despatched
Fees paidRenewal fee
03.06.2019Renewal fee patent year 03
14.10.2020Renewal fee patent year 04
29.09.2021Renewal fee patent year 05
15.09.2022Renewal fee patent year 06
13.09.2023Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT25.10.2023
CZ25.10.2023
DK25.10.2023
EE25.10.2023
HR25.10.2023
LT25.10.2023
LV25.10.2023
PL25.10.2023
RO25.10.2023
RS25.10.2023
SK25.10.2023
SM25.10.2023
BG25.01.2024
GR26.01.2024
IS25.02.2024
PT26.02.2024
[2024/36]
Former [2024/35]AT25.10.2023
CZ25.10.2023
DK25.10.2023
EE25.10.2023
HR25.10.2023
LT25.10.2023
LV25.10.2023
PL25.10.2023
RO25.10.2023
RS25.10.2023
SM25.10.2023
BG25.01.2024
GR26.01.2024
IS25.02.2024
PT26.02.2024
Former [2024/34]AT25.10.2023
DK25.10.2023
EE25.10.2023
HR25.10.2023
LT25.10.2023
LV25.10.2023
PL25.10.2023
RS25.10.2023
SM25.10.2023
BG25.01.2024
GR26.01.2024
IS25.02.2024
PT26.02.2024
Former [2024/33]AT25.10.2023
DK25.10.2023
HR25.10.2023
LT25.10.2023
LV25.10.2023
PL25.10.2023
RS25.10.2023
SM25.10.2023
BG25.01.2024
GR26.01.2024
IS25.02.2024
PT26.02.2024
Former [2024/26]AT25.10.2023
HR25.10.2023
LT25.10.2023
LV25.10.2023
PL25.10.2023
RS25.10.2023
BG25.01.2024
GR26.01.2024
IS25.02.2024
PT26.02.2024
Former [2024/25]AT25.10.2023
HR25.10.2023
LT25.10.2023
PL25.10.2023
RS25.10.2023
BG25.01.2024
GR26.01.2024
IS25.02.2024
PT26.02.2024
Former [2024/24]AT25.10.2023
HR25.10.2023
LT25.10.2023
RS25.10.2023
BG25.01.2024
GR26.01.2024
IS25.02.2024
PT26.02.2024
Former [2024/23]AT25.10.2023
LT25.10.2023
BG25.01.2024
GR26.01.2024
IS25.02.2024
PT26.02.2024
Former [2024/21]LT25.10.2023
BG25.01.2024
GR26.01.2024
IS25.02.2024
Former [2024/20]GR26.01.2024
IS25.02.2024
Documents cited:Search[I]EP2398202  (SAMSUNG ELECTRONICS CO LTD [KR]) [I] 1-15 * page 7, paragraph 0062 - paragraph 0065; figure 6 *;
 [A]  - ZTE, "Discussion on the usable bandwidth for guard-band NB-IOT", vol. RAN WG4, no. St. Julian's, Malta; 20160215 - 20160219, (20160214), 3GPP DRAFT; R4-160176 DISCUSSION ON THE USABLE BANDWIDTH FOR GUARD-BAND NB-IOT, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN4/Docs/, (20160214), XP051056607 [A] 1-15 * figure 1 *
 [A]  - ERICSSON, "Mixed Numerology in an OFDM System", vol. RAN WG1, no. Nanjing; 20160523 - 20160527, (20160530), 3GPP DRAFT; R1-165833, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_85/Docs/, (20160530), XP051112002 [A] 1-15 * figures 4-5 *
ExaminationCN102036401
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.