blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3343999

EP3343999 - NODES AND METHODS FOR RANDOM ACCESS IN DUAL CONNECTIVITY [Right-click to bookmark this link]
Former [2018/27]A NODE AND METHOD FOR RANDOM ACCESS IN DUAL CONNECTIVITY
[2020/19]
StatusNo opposition filed within time limit
Status updated on  15.04.2022
Database last updated on 28.09.2024
FormerThe patent has been granted
Status updated on  07.05.2021
FormerGrant of patent is intended
Status updated on  03.02.2021
FormerExamination is in progress
Status updated on  10.04.2020
FormerRequest for examination was made
Status updated on  11.01.2019
FormerThe application has been published
Status updated on  01.06.2018
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Telefonaktiebolaget LM Ericsson (publ)
164 83 Stockholm / SE
[2021/23]
Former [2018/27]For all designated states
Telefonaktiebolaget LM Ericsson (publ)
164 83 Stockholm / SE
Inventor(s)01 / RAHMAN, Imadur
Rådjursstigen 20
191 46 SOLLENTUNA / SE
02 / YANG, Yu
Meanderslingan 8
170 62 SOLNA / SE
03 / GUO, Zhiheng
No.5, Lize East Street, Chaoyang District
BEIJING, 100102 / CN
04 / LI, Shaohua
No.5 Lize East Street, Chaoyang District
BEIJING, 100102 / CN
05 / LARSSON, Daniel
Parternas Gränd 65
226 47 LUND / SE
06 / SONG, Xinghua
No.5 Lize East Street, Chaoyang District
BEIJING, 100102 / CN
 [2021/23]
Former [2018/27]01 / RAHMAN, Imadur
Rådjursstigen 20
SE-191 46 SOLLENTUNA / SE
02 / YANG, Yu
Meanderslingan 8
SE-170 62 SOLNA / SE
03 / GUO, Zhiheng
No.5, Lize East Street, Chaoyang District
BEIJING, 100102 / CN
04 / LI, Shaohua
No.5 Lize East Street, Chaoyang District
BEIJING, 100102 / CN
05 / LARSSON, Daniel
Parternas Gränd 65
SE-226 47 LUND / SE
06 / SONG, Xinghua
No.5 Lize East Street, Chaoyang District
BEIJING, 100102 / CN
Representative(s)Ericsson
Patent Development
Torshamnsgatan 21-23
164 80 Stockholm / SE
[2018/27]
Application number, filing date18158186.907.11.2013
[2018/27]
Priority number, dateUS201361863578P08.08.2013         Original published format: US 201361863578 P
[2018/27]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3343999
Date:04.07.2018
Language:EN
[2018/27]
Type: B1 Patent specification 
No.:EP3343999
Date:09.06.2021
Language:EN
[2021/23]
Search report(s)(Supplementary) European search report - dispatched on:EP30.05.2018
ClassificationIPC:H04W74/08, H04W76/15, // H04W74/00, H04W84/04
[2020/19]
CPC:
H04W74/0833 (EP,US); H04W76/15 (EP,US); H04W72/23 (US);
H04W74/006 (US); H04W74/002 (EP,US); H04W74/0838 (EP);
H04W84/047 (EP,US) (-)
Former IPC [2018/27]H04W74/08, H04W84/04, H04W72/04, H04W74/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/07]
Former [2018/27]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:KNOTEN UND VERFAHREN FÜR DIREKTZUGRIFF IN EINER DUALKONNEKTIVITÄT[2018/27]
English:NODES AND METHODS FOR RANDOM ACCESS IN DUAL CONNECTIVITY[2020/19]
French:NOEUDS ET PROCÉDÉS D'ACCÈS ALÉATOIRE DANS UNE CONNECTIVITÉ DOUBLE[2020/19]
Former [2018/27]A NODE AND METHOD FOR RANDOM ACCESS IN DUAL CONNECTIVITY
Former [2018/27]N UD ET PROCÉDÉ D'ACCÈS ALÉATOIRE DANS UNE CONNECTIVITÉ DOUBLE
Examination procedure28.12.2018Amendment by applicant (claims and/or description)
28.12.2018Examination requested  [2019/07]
28.12.2018Date on which the examining division has become responsible
16.04.2020Despatch of a communication from the examining division (Time limit: M04)
06.08.2020Reply to a communication from the examining division
04.02.2021Communication of intention to grant the patent
30.04.2021Fee for grant paid
30.04.2021Fee for publishing/printing paid
30.04.2021Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP13795885.6  / EP3031278
Divisional application(s)EP21176762.9  / EP3893590
EP23189431.2  / EP4280794
Opposition(s)10.03.2022No opposition filed within time limit [2022/20]
Fees paidRenewal fee
22.02.2018Renewal fee patent year 03
22.02.2018Renewal fee patent year 04
22.02.2018Renewal fee patent year 05
27.11.2018Renewal fee patent year 06
27.11.2019Renewal fee patent year 07
27.11.2020Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.11.2013
AL09.06.2021
AT09.06.2021
CY09.06.2021
CZ09.06.2021
EE09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
MC09.06.2021
MK09.06.2021
MT09.06.2021
RS09.06.2021
SE09.06.2021
SI09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
LU07.11.2021
[2024/41]
Former [2024/23]HU07.11.2013
AL09.06.2021
AT09.06.2021
CY09.06.2021
CZ09.06.2021
EE09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
MC09.06.2021
MK09.06.2021
RS09.06.2021
SE09.06.2021
SI09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
LU07.11.2021
Former [2023/30]HU07.11.2013
AL09.06.2021
AT09.06.2021
CY09.06.2021
CZ09.06.2021
EE09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
MC09.06.2021
RS09.06.2021
SE09.06.2021
SI09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
LU07.11.2021
Former [2023/29]HU07.11.2013
AL09.06.2021
AT09.06.2021
CZ09.06.2021
EE09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
MC09.06.2021
RS09.06.2021
SE09.06.2021
SI09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
LU07.11.2021
Former [2022/34]AL09.06.2021
AT09.06.2021
CZ09.06.2021
EE09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
MC09.06.2021
RS09.06.2021
SE09.06.2021
SI09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
LU07.11.2021
Former [2022/33]AL09.06.2021
AT09.06.2021
CZ09.06.2021
EE09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
MC09.06.2021
RS09.06.2021
SE09.06.2021
SI09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
Former [2022/29]AL09.06.2021
AT09.06.2021
CZ09.06.2021
EE09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
RS09.06.2021
SE09.06.2021
SI09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
Former [2022/26]AL09.06.2021
AT09.06.2021
CZ09.06.2021
EE09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
RS09.06.2021
SE09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
Former [2022/11]AT09.06.2021
CZ09.06.2021
EE09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
RS09.06.2021
SE09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
Former [2022/09]AT09.06.2021
CZ09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
RS09.06.2021
SE09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
GR10.09.2021
PT11.10.2021
Former [2022/07]AT09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
RS09.06.2021
SE09.06.2021
SM09.06.2021
BG09.09.2021
GR10.09.2021
Former [2021/51]HR09.06.2021
LT09.06.2021
LV09.06.2021
RS09.06.2021
SE09.06.2021
BG09.09.2021
GR10.09.2021
Former [2021/49]HR09.06.2021
LT09.06.2021
LV09.06.2021
SE09.06.2021
BG09.09.2021
GR10.09.2021
Former [2021/46]LT09.06.2021
BG09.09.2021
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.