blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3514244

EP3514244 - NUCLEIC ACID PREPARATION METHODS [Right-click to bookmark this link]
Former [2019/30]NUCLEIC ACID PREPARATION COMPOSITIONS AND METHODS
[2021/01]
StatusNo opposition filed within time limit
Status updated on  13.05.2022
Database last updated on 25.09.2024
FormerThe patent has been granted
Status updated on  12.06.2021
FormerGrant of patent is intended
Status updated on  21.01.2021
FormerExamination is in progress
Status updated on  21.08.2020
FormerRequest for examination was made
Status updated on  31.01.2020
FormerThe application has been published
Status updated on  21.06.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Sequenom, Inc.
3595 John Hopkins Court
San Diego, CA 92121 / US
[2019/30]
Inventor(s)01 / WISNIEWSKI, Michele
3574 Trenton Avenue
San Diego, CA 92117 / US
02 / KWONG, William
4064 Huerfano Ave., 156
San Diego, CA 92117 / US
03 / MOHSENIAN, Firouz
3574 Trenton Avenue
San Diego, CA 92117 / US
04 / DING, Jian-Hua
7984 Camino Jonata
San Diego, CA 92122 / US
 [2019/30]
Representative(s)Vossius & Partner Patentanwälte Rechtsanwälte mbB
Siebertstrasse 3
81675 München / DE
[2019/30]
Application number, filing date18214114.301.04.2010
[2019/30]
Priority number, dateUS200916667109P03.04.2009         Original published format: US 16667109 P
[2019/30]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3514244
Date:24.07.2019
Language:EN
[2019/30]
Type: B1 Patent specification 
No.:EP3514244
Date:07.07.2021
Language:EN
[2021/27]
Search report(s)(Supplementary) European search report - dispatched on:EP29.03.2019
ClassificationIPC:C12Q1/6806, C12N15/10, C12N15/11
[2021/01]
CPC:
C12N15/1006 (EP,US); C12N15/1003 (US); C12Q1/68 (US);
C12Q1/6834 (EP,US); Y02A50/30 (US)
C-Set:
C12Q1/6834, C12Q2565/137, C12Q2527/125 (EP,US)
Former IPC [2019/30]C12Q1/68, C12N15/10, C12N15/11
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2020/10]
Former [2019/30]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN FÜR DIE HERSTELLUNG VON NUKLEINSÄUREN[2021/01]
English:NUCLEIC ACID PREPARATION METHODS[2021/01]
French:PROCÉDÉS DE PRÉPARATION D'ACIDES NUCLÉIQUES[2021/01]
Former [2019/30]ZUSAMMENSETZUNGEN UND VERFAHREN FÜR DIE HERSTELLUNG VON NUKLEINSÄUREN
Former [2019/30]NUCLEIC ACID PREPARATION COMPOSITIONS AND METHODS
Former [2019/30]COMPOSITIONS ET PROCÉDÉS DE PRÉPARATION D'ACIDES NUCLÉIQUES
Examination procedure23.01.2020Amendment by applicant (claims and/or description)
23.01.2020Examination requested  [2020/10]
23.01.2020Date on which the examining division has become responsible
25.08.2020Despatch of a communication from the examining division (Time limit: M04)
09.09.2020Reply to a communication from the examining division
22.01.2021Communication of intention to grant the patent
26.05.2021Fee for grant paid
26.05.2021Fee for publishing/printing paid
26.05.2021Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP10759416.0  / EP2414545
EP16203716.2  / EP3211095
Divisional application(s)EP21182343.0  / EP3964586
Opposition(s)08.04.2022No opposition filed within time limit [2022/24]
Fees paidRenewal fee
19.01.2019Renewal fee patent year 03
19.01.2019Renewal fee patent year 04
19.01.2019Renewal fee patent year 05
19.01.2019Renewal fee patent year 06
19.01.2019Renewal fee patent year 07
19.01.2019Renewal fee patent year 08
19.01.2019Renewal fee patent year 09
15.04.2019Renewal fee patent year 10
31.03.2020Renewal fee patent year 11
15.04.2021Renewal fee patent year 12
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU01.04.2010
AT07.07.2021
CY07.07.2021
CZ07.07.2021
DK07.07.2021
EE07.07.2021
ES07.07.2021
FI07.07.2021
HR07.07.2021
IT07.07.2021
LT07.07.2021
LV07.07.2021
MC07.07.2021
MK07.07.2021
NL07.07.2021
PL07.07.2021
RO07.07.2021
SE07.07.2021
SI07.07.2021
SK07.07.2021
SM07.07.2021
TR07.07.2021
BG07.10.2021
NO07.10.2021
GR08.10.2021
IS07.11.2021
PT08.11.2021
IE01.04.2022
LU01.04.2022
[2024/29]
Former [2024/23]HU01.04.2010
AT07.07.2021
CY07.07.2021
CZ07.07.2021
DK07.07.2021
EE07.07.2021
ES07.07.2021
FI07.07.2021
HR07.07.2021
IT07.07.2021
LT07.07.2021
LV07.07.2021
MC07.07.2021
MK07.07.2021
NL07.07.2021
PL07.07.2021
RO07.07.2021
SE07.07.2021
SI07.07.2021
SK07.07.2021
SM07.07.2021
BG07.10.2021
NO07.10.2021
GR08.10.2021
IS07.11.2021
PT08.11.2021
IE01.04.2022
LU01.04.2022
Former [2024/20]HU01.04.2010
AT07.07.2021
CY07.07.2021
CZ07.07.2021
DK07.07.2021
EE07.07.2021
ES07.07.2021
FI07.07.2021
HR07.07.2021
IT07.07.2021
LT07.07.2021
LV07.07.2021
MC07.07.2021
NL07.07.2021
PL07.07.2021
RO07.07.2021
SE07.07.2021
SI07.07.2021
SK07.07.2021
SM07.07.2021
BG07.10.2021
NO07.10.2021
GR08.10.2021
IS07.11.2021
PT08.11.2021
IE01.04.2022
LU01.04.2022
Former [2024/18]HU01.04.2010
AT07.07.2021
CZ07.07.2021
DK07.07.2021
EE07.07.2021
ES07.07.2021
FI07.07.2021
HR07.07.2021
IT07.07.2021
LT07.07.2021
LV07.07.2021
MC07.07.2021
NL07.07.2021
PL07.07.2021
RO07.07.2021
SE07.07.2021
SI07.07.2021
SK07.07.2021
SM07.07.2021
BG07.10.2021
NO07.10.2021
GR08.10.2021
IS07.11.2021
PT08.11.2021
IE01.04.2022
LU01.04.2022
Former [2023/20]AT07.07.2021
CZ07.07.2021
DK07.07.2021
EE07.07.2021
ES07.07.2021
FI07.07.2021
HR07.07.2021
IT07.07.2021
LT07.07.2021
LV07.07.2021
MC07.07.2021
NL07.07.2021
PL07.07.2021
RO07.07.2021
SE07.07.2021
SI07.07.2021
SK07.07.2021
SM07.07.2021
BG07.10.2021
NO07.10.2021
GR08.10.2021
IS07.11.2021
PT08.11.2021
IE01.04.2022
LU01.04.2022
Former [2023/08]AT07.07.2021
CZ07.07.2021
DK07.07.2021
EE07.07.2021
ES07.07.2021
FI07.07.2021
HR07.07.2021
IT07.07.2021
LT07.07.2021
LV07.07.2021
MC07.07.2021
NL07.07.2021
PL07.07.2021
RO07.07.2021
SE07.07.2021
SI07.07.2021
SK07.07.2021
SM07.07.2021
BG07.10.2021
NO07.10.2021
GR08.10.2021
IS07.11.2021
PT08.11.2021
LU01.04.2022
Former [2023/06]AT07.07.2021
CZ07.07.2021
DK07.07.2021
EE07.07.2021
ES07.07.2021
FI07.07.2021
HR07.07.2021
IT07.07.2021
LT07.07.2021
LV07.07.2021
MC07.07.2021
NL07.07.2021
PL07.07.2021
RO07.07.2021
SE07.07.2021
SI07.07.2021
SK07.07.2021
SM07.07.2021
BG07.10.2021
NO07.10.2021
GR08.10.2021
IS07.11.2021
PT08.11.2021
Former [2022/36]AT07.07.2021
CZ07.07.2021
DK07.07.2021
EE07.07.2021
ES07.07.2021
FI07.07.2021
HR07.07.2021
IT07.07.2021
LT07.07.2021
LV07.07.2021
NL07.07.2021
PL07.07.2021
RO07.07.2021
SE07.07.2021
SI07.07.2021
SK07.07.2021
SM07.07.2021
BG07.10.2021
NO07.10.2021
GR08.10.2021
IS07.11.2021
PT08.11.2021
Former [2022/29]AT07.07.2021
CZ07.07.2021
DK07.07.2021
EE07.07.2021
ES07.07.2021
FI07.07.2021
HR07.07.2021
LT07.07.2021
LV07.07.2021
NL07.07.2021
PL07.07.2021
RO07.07.2021
SE07.07.2021
SI07.07.2021
SK07.07.2021
SM07.07.2021
BG07.10.2021
NO07.10.2021
GR08.10.2021
IS07.11.2021
PT08.11.2021
Former [2022/25]AT07.07.2021
CZ07.07.2021
DK07.07.2021
EE07.07.2021
ES07.07.2021
FI07.07.2021
HR07.07.2021
LT07.07.2021
LV07.07.2021
NL07.07.2021
PL07.07.2021
RO07.07.2021
SE07.07.2021
SK07.07.2021
SM07.07.2021
BG07.10.2021
NO07.10.2021
GR08.10.2021
IS07.11.2021
PT08.11.2021
Former [2022/24]AT07.07.2021
CZ07.07.2021
DK07.07.2021
EE07.07.2021
ES07.07.2021
FI07.07.2021
HR07.07.2021
LT07.07.2021
LV07.07.2021
NL07.07.2021
PL07.07.2021
RO07.07.2021
SE07.07.2021
SK07.07.2021
BG07.10.2021
NO07.10.2021
GR08.10.2021
IS07.11.2021
PT08.11.2021
Former [2022/21]AT07.07.2021
DK07.07.2021
ES07.07.2021
FI07.07.2021
HR07.07.2021
LT07.07.2021
LV07.07.2021
NL07.07.2021
PL07.07.2021
SE07.07.2021
BG07.10.2021
NO07.10.2021
GR08.10.2021
IS07.11.2021
PT08.11.2021
Former [2022/11]AT07.07.2021
ES07.07.2021
FI07.07.2021
HR07.07.2021
LT07.07.2021
LV07.07.2021
NL07.07.2021
PL07.07.2021
SE07.07.2021
BG07.10.2021
NO07.10.2021
GR08.10.2021
IS07.11.2021
PT08.11.2021
Former [2022/09]AT07.07.2021
ES07.07.2021
FI07.07.2021
LT07.07.2021
NL07.07.2021
SE07.07.2021
BG07.10.2021
NO07.10.2021
PT08.11.2021
Former [2022/08]AT07.07.2021
ES07.07.2021
FI07.07.2021
LT07.07.2021
NL07.07.2021
SE07.07.2021
BG07.10.2021
NO07.10.2021
Former [2022/07]AT07.07.2021
LT07.07.2021
NL07.07.2021
NO07.10.2021
Documents cited:Search[A]US5705628  (HAWKINS TREVOR [US]);
 [I]WO9958664  (WHITEHEAD BIOMEDICAL INST [US]);
 [I]WO03040687  (CORTEX BIOCHEM INC [US], et al);
by applicantUS4656127
 US4683195
 US4683202
 US4851331
 US4965188
 US5075212
 US5492806
 US5525464
 US5547835
 US5589330
 US5605798
 US5656493
 WO9737041
 US5679524
 US5691141
 US5695940
 US5786146
 US5834189
 US5849483
 US5849542
 US5851770
 US5869242
 US5876934
 US5891625
 US5908755
 US5912118
 US5928906
 US5952174
 US5958692
 US5976802
 US5981186
 US5998143
 US6004744
 US6013431
 US6013499
 US6017702
 US6018041
 US6043031
 US6046005
 US6045996
 US6087095
 US6110684
 WO0052625
 US6136541
 US6140054
 US6142681
 US6156501
 US6183958
 US6194144
 US6197506
 WO0120039
 US6210891
 US6214560
 WO0125485
 WO0127326
 WO0127327
 WO0127329
 US6223127
 WO0129259
 US6225625
 US6229911
 US6239273
 US6258538
 US2003082600
 US2003180779
 US6723513
 WO2005023091
 US2005112590
 US2005287592
 US7169314
 US2007202525
 WO2005EP12707
 WO2007US69991
 WO2007US71232
 US20070968876
 US20070968878
 US20070950395
 US20080021871
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.