EP3676468 - CLOSING DEVICE FOR A CONTROL CABINET AND A CORRESPONDING CONTROL CABINET [Right-click to bookmark this link] | |||
Former [2020/28] | CLOSING DEVICE FOR AN ELECTRICAL ENCLOSURE, AND A CORRESPONDING ELECTRICAL ENCLOSURE | ||
[2020/47] | Status | No opposition filed within time limit Status updated on 26.11.2021 Database last updated on 15.07.2024 | |
Former | The patent has been granted Status updated on 18.12.2020 | ||
Former | Grant of patent is intended Status updated on 02.11.2020 | ||
Former | Request for examination was made Status updated on 05.06.2020 | ||
Former | The international publication has been made Status updated on 01.06.2019 | ||
Former | unknown Status updated on 12.10.2018 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Rittal GmbH & Co. KG Auf dem Stützelberg 35745 Herborn / DE | [N/P] |
Former [2020/28] | For all designated states Rittal GmbH & Co. KG Auf dem Stützelberg 35745 Herborn / DE | Inventor(s) | 01 /
BRÜCK, Daniel Eichenweg 11 35764 Sinn / DE | 02 /
WIRBELAUER, Sascha Auf der Hahnau 57 35781 Weilburg-Odersbach / DE | [2020/28] | Representative(s) | Angerhausen, Christoph Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | [2020/28] | Application number, filing date | 18779558.8 | 14.09.2018 | [2020/28] | WO2018DE100783 | Priority number, date | DE201710127576 | 22.11.2017 Original published format: DE102017127576 | [2020/28] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2019101260 | Date: | 31.05.2019 | Language: | DE | [2019/22] | Type: | A1 Application with search report | No.: | EP3676468 | Date: | 08.07.2020 | Language: | DE | The application published by WIPO in one of the EPO official languages on 31.05.2019 takes the place of the publication of the European patent application. | [2020/28] | Type: | B1 Patent specification | No.: | EP3676468 | Date: | 20.01.2021 | Language: | DE | [2021/03] | Search report(s) | International search report - published on: | EP | 31.05.2019 | Classification | IPC: | E05C7/06, E05C9/04, E05C9/18 | [2020/28] | CPC: |
E05C7/06 (EP,KR,RU);
E05C7/045 (US);
E05C9/04 (US);
E05C9/043 (EP,KR);
E05C9/1808 (EP,KR,US);
E05Y2900/208 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/28] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SCHLIESSEINRICHTUNG FÜR EINEN SCHALTSCHRANK UND EIN ENTSPRECHENDER SCHALTSCHRANK | [2020/28] | English: | CLOSING DEVICE FOR A CONTROL CABINET AND A CORRESPONDING CONTROL CABINET | [2020/47] | French: | DISPOSITIF DE FERMETURE POUR ARMOIRE ÉLECTRIQUE ET ARMOIRE ÉLECTRIQUE CORRESPONDANTE | [2020/47] |
Former [2020/28] | CLOSING DEVICE FOR AN ELECTRICAL ENCLOSURE, AND A CORRESPONDING ELECTRICAL ENCLOSURE | ||
Former [2020/28] | DISPOSITIF DE FERMETURE POUR UNE ARMOIRE ÉLECTRIQUE ET ARMOIRE ÉLECTRIQUE CORRESPONDANTE | Entry into regional phase | 31.03.2020 | National basic fee paid | 31.03.2020 | Designation fee(s) paid | 31.03.2020 | Examination fee paid | Examination procedure | 20.09.2019 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 31.03.2020 | Examination requested [2020/28] | 31.03.2020 | Date on which the examining division has become responsible | 03.11.2020 | Communication of intention to grant the patent | 08.12.2020 | Fee for grant paid | 08.12.2020 | Fee for publishing/printing paid | 08.12.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 21.10.2021 | No opposition filed within time limit [2021/52] | Fees paid | Renewal fee | 24.09.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 20.01.2021 | CY | 20.01.2021 | DK | 20.01.2021 | EE | 20.01.2021 | FI | 20.01.2021 | HR | 20.01.2021 | LT | 20.01.2021 | LV | 20.01.2021 | MC | 20.01.2021 | MK | 20.01.2021 | RO | 20.01.2021 | RS | 20.01.2021 | SI | 20.01.2021 | SM | 20.01.2021 | NO | 20.04.2021 | GR | 21.04.2021 | IS | 20.05.2021 | PT | 20.05.2021 | IE | 14.09.2021 | LU | 14.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | LI | 30.09.2021 | [2024/23] |
Former [2023/41] | AL | 20.01.2021 | |
CY | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SI | 20.01.2021 | ||
SM | 20.01.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
IE | 14.09.2021 | ||
LU | 14.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/30] | AL | 20.01.2021 | |
CY | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SM | 20.01.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
IE | 14.09.2021 | ||
LU | 14.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/37] | AL | 20.01.2021 | |
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SM | 20.01.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
IE | 14.09.2021 | ||
LU | 14.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/35] | AL | 20.01.2021 | |
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SM | 20.01.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
IE | 14.09.2021 | ||
LU | 14.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/34] | AL | 20.01.2021 | |
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SM | 20.01.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
LU | 14.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/25] | AL | 20.01.2021 | |
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SM | 20.01.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2022/23] | AL | 20.01.2021 | |
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SM | 20.01.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2022/10] | AL | 20.01.2021 | |
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SM | 20.01.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
PT | 20.05.2021 | ||
Former [2022/07] | AL | 20.01.2021 | |
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SM | 20.01.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/50] | DK | 20.01.2021 | |
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SM | 20.01.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/49] | DK | 20.01.2021 | |
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
RS | 20.01.2021 | ||
SM | 20.01.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/48] | EE | 20.01.2021 | |
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
RS | 20.01.2021 | ||
SM | 20.01.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/46] | FI | 20.01.2021 | |
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
RS | 20.01.2021 | ||
SM | 20.01.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/42] | FI | 20.01.2021 | |
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
RS | 20.01.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/37] | FI | 20.01.2021 | |
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
RS | 20.01.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
PT | 20.05.2021 | ||
Former [2021/36] | FI | 20.01.2021 | |
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
PT | 20.05.2021 | ||
Former [2021/35] | FI | 20.01.2021 | |
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
NO | 20.04.2021 | ||
PT | 20.05.2021 | ||
Former [2021/33] | FI | 20.01.2021 | |
LT | 20.01.2021 | ||
NO | 20.04.2021 | ||
PT | 20.05.2021 |