blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1844557

EP1844557 - OUTER LOOP POWER CONTROL FOR F-DPCH [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.10.2015
Database last updated on 21.03.2025
Most recent event   Tooltip27.10.2017Lapse of the patent in a contracting state
New state(s): BE
published on 29.11.2017  [2017/48]
Applicant(s)For all designated states
Lenovo Group Limited
23rd Floor, Lincoln Housse
Taikoo Place
979 King's Road
Quarry Bay
Hong Kong / HK
[2014/43]
Former [2013/23]For all designated states
Unwired Planet, LLC
170 South Virginia Street, Suite 201
Reno, NV 89501 / US
Former [2007/42]For all designated states
Telefonaktiebolaget L M Ericsson (Publ)
Torshamnsgatan 23
164 83 Stockholm / SE
Inventor(s)01 / KAZMI, Muhammad
Svartviksslingen 110, 3 tr
S-167 39 Bromma / SE
02 / GERSTENBERGER, Dirk
Silkeborgsgatan 56
S-164 48 Kista / SE
 [2013/51]
Former [2008/01]01 / KAZMI, Muhammad
Svartviksslingen 110, 3 tr
S-167 39 BROMMA / SE
02 / GERSTENBERGER, Dirk
Silkeborgsgatan 56
S-164 48 KISTA / SE
Former [2007/42]01 / KAZMI, Muhammad
Knypplerskevägen 12, n b
S-168 38 BROMMA / SE
02 / GERSTENBERGER, Dirk
Silkeborgsgatan 56
S-164 48 KISTA / SE
Representative(s)Schweiger, Martin
Patentanwalt
Martin Schweiger
Erhardtstraße 12
80469 München / DE
[N/P]
Former [2014/48]McCann, Heather Alison, et al
EIP
Fairfax House
15 Fulwood Place
London WC1V 6HU / GB
Former [2013/23]McCann, Heather Alison, et al
EIP Fairfax House 15 Fulwood Place
London WC1V 6HU / GB
Former [2013/13]Seymour, James N., et al
EIP
Fairfax House
15 Fulwood Place
London WC1V 6HU / GB
Former [2007/42]Kühn, Friedrich Heinrich
Ericsson AB Patent Unit LTE Torshamnsgatan 23
164 80 Stockholm / SE
Application number, filing date05761138.607.06.2005
[2007/42]
WO2005EP52608
Priority number, dateSE2005000024001.02.2005         Original published format: SE 0500240
[2007/42]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2006081875
Date:10.08.2006
Language:EN
[2006/32]
Type: A1 Application with search report 
No.:EP1844557
Date:17.10.2007
Language:EN
The application published by WIPO in one of the EPO official languages on 10.08.2006 takes the place of the publication of the European patent application.
[2007/42]
Type: B1 Patent specification 
No.:EP1844557
Date:26.11.2014
Language:EN
[2014/48]
Search report(s)International search report - published on:EP10.08.2006
ClassificationIPC:H04W52/12, H04W52/22, H04W52/28, H04W52/40, H04W52/56
[2013/48]
CPC:
H04W52/40 (EP,US); H04W52/12 (EP,US); H04W52/228 (EP,US);
H04W52/286 (EP,US); H04W52/56 (EP,US)
Former IPC [2007/42]H04B7/005
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2007/42]
TitleGerman:LEISTUNGSREGELUNG IN ÄUSSERER SCHLEIFE FÜR F-DPCH[2007/42]
English:OUTER LOOP POWER CONTROL FOR F-DPCH[2007/42]
French:COMMANDE EN PUISSANCE PAR BOUCLE EXTERNE POUR CANAL F-DPCH[2007/42]
Entry into regional phase09.07.2007National basic fee paid 
09.07.2007Designation fee(s) paid 
09.07.2007Examination fee paid 
Examination procedure24.11.2006Request for preliminary examination filed
International Preliminary Examining Authority: EP
09.07.2007Examination requested  [2007/42]
04.12.2009Despatch of a communication from the examining division (Time limit: M04)
24.03.2010Reply to a communication from the examining division
27.07.2010Despatch of a communication from the examining division (Time limit: M04)
26.11.2010Reply to a communication from the examining division
21.11.2013Communication of intention to grant the patent
01.04.2014Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
01.04.2014Fee for grant paid
01.04.2014Fee for publishing/printing paid
06.06.2014Communication of intention to grant the patent
14.10.2014Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  04.12.2009
Opposition(s)27.08.2015No opposition filed within time limit [2015/45]
Fees paidRenewal fee
27.07.2007Renewal fee patent year 03
28.03.2008Renewal fee patent year 04
26.06.2009Renewal fee patent year 05
25.06.2010Renewal fee patent year 06
27.06.2011Renewal fee patent year 07
31.03.2012Renewal fee patent year 08
20.06.2013Renewal fee patent year 09
25.06.2014Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.06.2005
AT26.11.2014
BE26.11.2014
BG26.11.2014
CY26.11.2014
CZ26.11.2014
DK26.11.2014
EE26.11.2014
ES26.11.2014
FI26.11.2014
IT26.11.2014
LT26.11.2014
MC26.11.2014
PL26.11.2014
RO26.11.2014
SE26.11.2014
SI26.11.2014
SK26.11.2014
TR26.11.2014
GR27.02.2015
IS26.03.2015
PT26.03.2015
IE07.06.2015
LU07.06.2015
CH30.06.2015
FR30.06.2015
LI30.06.2015
[2017/46]
Former [2017/39]HU07.06.2005
AT26.11.2014
BG26.11.2014
CY26.11.2014
CZ26.11.2014
DK26.11.2014
EE26.11.2014
ES26.11.2014
FI26.11.2014
IT26.11.2014
LT26.11.2014
MC26.11.2014
PL26.11.2014
RO26.11.2014
SE26.11.2014
SI26.11.2014
SK26.11.2014
TR26.11.2014
GR27.02.2015
IS26.03.2015
PT26.03.2015
IE07.06.2015
LU07.06.2015
CH30.06.2015
FR30.06.2015
LI30.06.2015
Former [2016/25]AT26.11.2014
CY26.11.2014
CZ26.11.2014
DK26.11.2014
EE26.11.2014
ES26.11.2014
FI26.11.2014
IT26.11.2014
LT26.11.2014
MC26.11.2014
PL26.11.2014
RO26.11.2014
SE26.11.2014
SI26.11.2014
SK26.11.2014
GR27.02.2015
IS26.03.2015
PT26.03.2015
IE07.06.2015
LU07.06.2015
CH30.06.2015
FR30.06.2015
LI30.06.2015
Former [2016/22]AT26.11.2014
CY26.11.2014
CZ26.11.2014
DK26.11.2014
EE26.11.2014
ES26.11.2014
FI26.11.2014
IT26.11.2014
LT26.11.2014
MC26.11.2014
PL26.11.2014
RO26.11.2014
SE26.11.2014
SI26.11.2014
SK26.11.2014
GR27.02.2015
IS26.03.2015
PT26.03.2015
IE07.06.2015
LU07.06.2015
CH30.06.2015
LI30.06.2015
Former [2016/20]AT26.11.2014
CY26.11.2014
CZ26.11.2014
DK26.11.2014
EE26.11.2014
ES26.11.2014
FI26.11.2014
IT26.11.2014
LT26.11.2014
MC26.11.2014
PL26.11.2014
RO26.11.2014
SE26.11.2014
SI26.11.2014
SK26.11.2014
GR27.02.2015
IS26.03.2015
PT26.03.2015
IE07.06.2015
LU07.06.2015
Former [2016/11]AT26.11.2014
CY26.11.2014
CZ26.11.2014
DK26.11.2014
EE26.11.2014
ES26.11.2014
FI26.11.2014
IT26.11.2014
LT26.11.2014
MC26.11.2014
PL26.11.2014
RO26.11.2014
SE26.11.2014
SI26.11.2014
SK26.11.2014
GR27.02.2015
IS26.03.2015
PT26.03.2015
LU07.06.2015
Former [2016/09]AT26.11.2014
CY26.11.2014
CZ26.11.2014
DK26.11.2014
EE26.11.2014
ES26.11.2014
FI26.11.2014
IT26.11.2014
LT26.11.2014
MC26.11.2014
PL26.11.2014
RO26.11.2014
SE26.11.2014
SK26.11.2014
GR27.02.2015
IS26.03.2015
PT26.03.2015
Former [2016/03]AT26.11.2014
CY26.11.2014
CZ26.11.2014
DK26.11.2014
EE26.11.2014
ES26.11.2014
FI26.11.2014
IT26.11.2014
LT26.11.2014
PL26.11.2014
RO26.11.2014
SE26.11.2014
SK26.11.2014
GR27.02.2015
IS26.03.2015
PT26.03.2015
Former [2015/37]AT26.11.2014
CY26.11.2014
CZ26.11.2014
DK26.11.2014
EE26.11.2014
ES26.11.2014
FI26.11.2014
LT26.11.2014
PL26.11.2014
RO26.11.2014
SE26.11.2014
SK26.11.2014
GR27.02.2015
IS26.03.2015
PT26.03.2015
Former [2015/36]AT26.11.2014
CY26.11.2014
CZ26.11.2014
DK26.11.2014
EE26.11.2014
ES26.11.2014
FI26.11.2014
LT26.11.2014
RO26.11.2014
SE26.11.2014
GR27.02.2015
IS26.03.2015
PT26.03.2015
Former [2015/35]AT26.11.2014
CY26.11.2014
DK26.11.2014
EE26.11.2014
ES26.11.2014
FI26.11.2014
LT26.11.2014
SE26.11.2014
GR27.02.2015
IS26.03.2015
PT26.03.2015
Former [2015/34]AT26.11.2014
CY26.11.2014
DK26.11.2014
ES26.11.2014
FI26.11.2014
LT26.11.2014
SE26.11.2014
GR27.02.2015
IS26.03.2015
PT26.03.2015
Former [2015/26]AT26.11.2014
CY26.11.2014
ES26.11.2014
FI26.11.2014
LT26.11.2014
SE26.11.2014
GR27.02.2015
IS26.03.2015
PT26.03.2015
Former [2015/25]AT26.11.2014
ES26.11.2014
FI26.11.2014
LT26.11.2014
SE26.11.2014
GR27.02.2015
IS26.03.2015
PT26.03.2015
Former [2015/24]ES26.11.2014
FI26.11.2014
LT26.11.2014
SE26.11.2014
GR27.02.2015
IS26.03.2015
PT26.03.2015
Former [2015/23]ES26.11.2014
FI26.11.2014
LT26.11.2014
IS26.03.2015
PT26.03.2015
Former [2015/22]LT26.11.2014
PT26.03.2015
Former [2015/20]LT26.11.2014
Cited inInternational search[DXA]  - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; High Speed Download Packet Access (HSDPA) enhancements (Release 6)", 3GPP TR 25.899 V6.1.0 (2004-09), (200409), vol. 6.1.0, XP002345458 [DX] 1,5 * paragraph [6.8.1.3.5] * [A] 2-4
 [XA]  - DIRK GERSTENBERGER, "Report from TSG RAN WG1 Chairman to TSG RAN #26", 3GPP TSG RAN MEETING #26, Vouliagmeni, Greece, (20041210), pages 1 - 15, URL: http://www.3gpp.org/ftp/tsg_ran/TSG_RAN/TSGR_26/Docs/PDF/RP-040398.pdf, (20050915), XP002345459 [X] 1,5 * page 11 * [A] 2-4
 [XA]  - 3GPP_TSG_RAN_WG1 ARCHIVES, vol. Dec2004, (200412), URL: http://list.3gpp.org/scripts/wa.exe?A2=ind0412&L=3gpp_tsg_ran_wg1&T=0&F=&S=&P=4842, (20050915), XP002345460 [X] 1,5 * the whole document * [A] 2-4
 [A]  - ENGSTROM B ET AL, "WCDMA system level performance with fast fading and non-ideal power control", VEHICULAR TECHNOLOGY CONFERENCE, 1999. VTC 1999 - FALL. IEEE VTS 50TH AMSTERDAM, NETHERLANDS 19-22 SEPT. 1999, PISCATAWAY, NJ, USA,IEEE, US, (19990919), vol. 2, ISBN 0-7803-5435-4, pages 1129 - 1133, XP010353065 [A] 1,5 * paragraph [III.D] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.