blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1840690

EP1840690 - Method for creating a rounting plan for agricultural machinery [Right-click to bookmark this link]
StatusPatent revoked
Status updated on  15.04.2019
Database last updated on 25.03.2025
FormerThe patent has been granted
Status updated on  11.01.2017
Most recent event   Tooltip03.06.2022Lapse of the patent in a contracting state
New state(s): TR
published on 06.07.2022  [2022/27]
Applicant(s)For all designated states
CLAAS Selbstfahrende Erntemaschinen GmbH
Mühlenwinkel 1
33428 Harsewinkel / DE
[2016/48]
Former [2014/10]For all designated states
CLAAS Selbstfahrende Erntemaschinen GmbH
Münsterstrasse 33
33428 Harsewinkel / DE
Former [2007/40]For all designated states
CLAAS Selbstfahrende Erntemaschinen GmbH
Münsterstrasse 33
33428 Harsewinkel / DE
Inventor(s)01 / Diekhans, Dr. Norbert
Sebastianweg 19
33335 Gütersloh / DE
02 / Huster, Jochen
Wilhelm-Baumann-Straße 11 a
33330 Gütersloh / DE
03 / Brunnert, Andreas
Pater-Walther-Str. 13
33397 Rietberg / DE
04 / Meyer zu Helligen, Lars Peter
Helliger Weg 37
32139 Spenge / DE
 [2007/40]
Application number, filing date07100495.612.01.2007
[2007/40]
Priority number, dateDE2006101520430.03.2006         Original published format: DE102006015204
[2007/40]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP1840690
Date:03.10.2007
Language:DE
[2007/40]
Type: A3 Search report 
No.:EP1840690
Date:04.05.2011
[2011/18]
Type: B1 Patent specification 
No.:EP1840690
Date:05.03.2014
Language:DE
[2014/10]
Search report(s)(Supplementary) European search report - dispatched on:EP04.04.2011
ClassificationIPC:G05D1/02
[2007/40]
CPC:
G01C21/20 (EP,US); A01B69/008 (EP,US); G05D1/0219 (EP,US);
G05D1/0291 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2007/40]
TitleGerman:Verfahren zur Erstellung eines Routenplans für landwirtschaftliche Maschinensysteme[2007/40]
English:Method for creating a rounting plan for agricultural machinery[2007/40]
French:Procédé destiné à la fabrication d'un plan de route pour systèmes de machines agricoles[2007/40]
Examination procedure04.11.2011Amendment by applicant (claims and/or description)
04.11.2011Examination requested  [2011/50]
16.10.2013Communication of intention to grant the patent
16.12.2013Fee for grant paid
16.12.2013Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  16.10.2013
Opposition(s)Opponent(s)01  28.10.2014  05.11.2014  ADMISSIBLE
Deere & Company/John Deere GmbH & Co. KG
One John Deere Place/John-Deere-Str. 70
Moline, IL 61265/US/68163 Mannheim/DE / US
Opponent's representative
Holst, Sönke
John Deere GmbH & Co. KG
Mannheim Regional Center
Global Intellectual Property Services
John-Deere-Strasse 70
68163 Mannheim / DE
 02  05.12.2014  10.12.2014  ADMISSIBLE
Amazonen-Werke H. Dreyer GmbH & Co. KG
Am Amazonenwerk 9-13
49205 Hasbergen-Gaste / DE
Opponent's representative
Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
 [2015/17]
Former [2015/07]
Opponent(s)01  28.10.2014  05.11.2014  ADMISSIBLE
Deere & Company/John Deere GmbH & Co. KG
One John Deere Place/John-Deere-Str. 70
Moline, Il 61265/US/68163 Mannheim/DE / US
Opponent's representative
Holst, Sönke
John Deere GmbH & Co. KG
Mannheim Regional Center
Global Intellectual Property Services
John-Deere-Strasse 70
68163 Mannheim / DE
 02  05.12.2014  10.12.2014  ADMISSIBLE
Amazonen-Werke H. Dreyer GmbH & Co. KG
Am Amazonenwerk 9-13
49205 Hasbergen-Gaste / DE
Opponent's representative
Grünecker, Kinkeldey, Stockmair & Schwanhäusser
Leopoldstrasse 4
80802 München / DE
Former [2015/03]
Opponent(s)01  28.10.2014  05.11.2014  ADMISSIBLE
Deere & Company
One John Deere Place
Moline, IL 61265-8098 / US
Opponent's representative
Holst, Sönke
John Deere GmbH & Co. KG
Mannheim Regional Center
Global Intellectual Property Services
John-Deere-Strasse 70
68163 Mannheim / DE
 02  05.12.2014  10.12.2014  ADMISSIBLE
Amazonen-Werke H. Dreyer GmbH & Co. KG
Am Amazonenwerk 9-13
49205 Hasbergen-Gaste / DE
Opponent's representative
Grünecker, Kinkeldey, Stockmair & Schwanhäusser
Leopoldstrasse 4
80802 München / DE
Former [2014/49]
Opponent(s)01  28.10.2014   
Deere & Company
One John Deere Place
Moline, IL 61265-8098 / US
Opponent's representative
Holst, Sönke
John Deere GmbH & Co. KG
Mannheim Regional Center
Global Intellectual Property Services
John-Deere-Strasse 70
68163 Mannheim / DE
13.01.2015Invitation to proprietor to file observations on the notice of opposition
24.04.2015Reply of patent proprietor to notice(s) of opposition
08.12.2016Date of oral proceedings
12.01.2017Despatch of minutes of oral proceedings
12.01.2017Despatch of communication that the patent will be revoked
25.04.2017Legal effect of revocation of patent [2017/24]
Appeal following opposition22.02.2017Appeal received No.  T0503/17
25.04.2017Result of appeal procedure: appeal of the proprietor withdrawn
Fees paidRenewal fee
02.02.2009Renewal fee patent year 03
01.02.2010Renewal fee patent year 04
31.01.2011Renewal fee patent year 05
31.01.2012Renewal fee patent year 06
31.01.2013Renewal fee patent year 07
13.01.2014Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.01.2007
CY05.03.2014
CZ05.03.2014
DK05.03.2014
EE05.03.2014
ES05.03.2014
FI05.03.2014
IT05.03.2014
LT05.03.2014
LV05.03.2014
MC05.03.2014
NL05.03.2014
PL05.03.2014
RO05.03.2014
SE05.03.2014
SI05.03.2014
SK05.03.2014
TR05.03.2014
BG05.06.2014
GR06.06.2014
IS05.07.2014
PT07.07.2014
AT12.01.2015
IE12.01.2015
LU12.01.2015
CH31.01.2015
LI31.01.2015
[2022/27]
Former [2017/40]HU12.01.2007
CY05.03.2014
CZ05.03.2014
DK05.03.2014
EE05.03.2014
ES05.03.2014
FI05.03.2014
IT05.03.2014
LT05.03.2014
LV05.03.2014
MC05.03.2014
NL05.03.2014
PL05.03.2014
RO05.03.2014
SE05.03.2014
SI05.03.2014
SK05.03.2014
BG05.06.2014
GR06.06.2014
IS05.07.2014
PT07.07.2014
AT12.01.2015
IE12.01.2015
LU12.01.2015
CH31.01.2015
LI31.01.2015
Former [2016/28]CY05.03.2014
CZ05.03.2014
DK05.03.2014
EE05.03.2014
ES05.03.2014
FI05.03.2014
IT05.03.2014
LT05.03.2014
LV05.03.2014
MC05.03.2014
NL05.03.2014
PL05.03.2014
RO05.03.2014
SE05.03.2014
SI05.03.2014
SK05.03.2014
BG05.06.2014
GR06.06.2014
IS05.07.2014
PT07.07.2014
AT12.01.2015
IE12.01.2015
LU12.01.2015
CH31.01.2015
LI31.01.2015
Former [2016/25]CY05.03.2014
CZ05.03.2014
DK05.03.2014
EE05.03.2014
ES05.03.2014
FI05.03.2014
IT05.03.2014
LT05.03.2014
LV05.03.2014
MC05.03.2014
NL05.03.2014
PL05.03.2014
RO05.03.2014
SE05.03.2014
SI05.03.2014
SK05.03.2014
BG05.06.2014
IS05.07.2014
PT07.07.2014
AT12.01.2015
IE12.01.2015
LU12.01.2015
CH31.01.2015
LI31.01.2015
Former [2016/07]CY05.03.2014
CZ05.03.2014
DK05.03.2014
EE05.03.2014
ES05.03.2014
FI05.03.2014
IT05.03.2014
LT05.03.2014
LV05.03.2014
MC05.03.2014
NL05.03.2014
PL05.03.2014
RO05.03.2014
SE05.03.2014
SI05.03.2014
SK05.03.2014
BG05.06.2014
IS05.07.2014
PT07.07.2014
IE12.01.2015
LU12.01.2015
CH31.01.2015
LI31.01.2015
Former [2015/47]CY05.03.2014
CZ05.03.2014
DK05.03.2014
EE05.03.2014
ES05.03.2014
FI05.03.2014
IT05.03.2014
LT05.03.2014
LV05.03.2014
MC05.03.2014
NL05.03.2014
PL05.03.2014
RO05.03.2014
SE05.03.2014
SI05.03.2014
SK05.03.2014
BG05.06.2014
IS05.07.2014
PT07.07.2014
LU12.01.2015
CH31.01.2015
LI31.01.2015
Former [2015/43]CY05.03.2014
CZ05.03.2014
DK05.03.2014
EE05.03.2014
ES05.03.2014
FI05.03.2014
IT05.03.2014
LT05.03.2014
LV05.03.2014
MC05.03.2014
NL05.03.2014
PL05.03.2014
RO05.03.2014
SE05.03.2014
SI05.03.2014
SK05.03.2014
BG05.06.2014
IS05.07.2014
PT07.07.2014
LU12.01.2015
Former [2015/39]CY05.03.2014
CZ05.03.2014
DK05.03.2014
EE05.03.2014
ES05.03.2014
FI05.03.2014
IT05.03.2014
LT05.03.2014
LV05.03.2014
NL05.03.2014
PL05.03.2014
RO05.03.2014
SE05.03.2014
SI05.03.2014
SK05.03.2014
BG05.06.2014
IS05.07.2014
PT07.07.2014
LU12.01.2015
Former [2015/24]CY05.03.2014
CZ05.03.2014
DK05.03.2014
EE05.03.2014
ES05.03.2014
FI05.03.2014
IT05.03.2014
LT05.03.2014
LV05.03.2014
NL05.03.2014
PL05.03.2014
RO05.03.2014
SE05.03.2014
SI05.03.2014
SK05.03.2014
BG05.06.2014
IS05.07.2014
PT07.07.2014
Former [2015/18]CY05.03.2014
CZ05.03.2014
DK05.03.2014
EE05.03.2014
ES05.03.2014
FI05.03.2014
IT05.03.2014
LT05.03.2014
LV05.03.2014
NL05.03.2014
PL05.03.2014
RO05.03.2014
SE05.03.2014
SK05.03.2014
BG05.06.2014
IS05.07.2014
PT07.07.2014
Former [2015/08]CY05.03.2014
CZ05.03.2014
DK05.03.2014
EE05.03.2014
ES05.03.2014
FI05.03.2014
LT05.03.2014
LV05.03.2014
NL05.03.2014
PL05.03.2014
RO05.03.2014
SE05.03.2014
SK05.03.2014
BG05.06.2014
IS05.07.2014
PT07.07.2014
Former [2015/02]CY05.03.2014
CZ05.03.2014
EE05.03.2014
ES05.03.2014
FI05.03.2014
LT05.03.2014
LV05.03.2014
NL05.03.2014
PL05.03.2014
RO05.03.2014
SE05.03.2014
SK05.03.2014
BG05.06.2014
IS05.07.2014
PT07.07.2014
Former [2014/50]CY05.03.2014
CZ05.03.2014
EE05.03.2014
ES05.03.2014
FI05.03.2014
LT05.03.2014
LV05.03.2014
NL05.03.2014
PL05.03.2014
RO05.03.2014
SE05.03.2014
SK05.03.2014
BG05.06.2014
IS05.07.2014
Former [2014/49]CY05.03.2014
CZ05.03.2014
EE05.03.2014
FI05.03.2014
LT05.03.2014
LV05.03.2014
RO05.03.2014
SE05.03.2014
BG05.06.2014
IS05.07.2014
Former [2014/48]CY05.03.2014
CZ05.03.2014
EE05.03.2014
FI05.03.2014
LT05.03.2014
LV05.03.2014
SE05.03.2014
BG05.06.2014
Former [2014/41]CY05.03.2014
FI05.03.2014
LT05.03.2014
LV05.03.2014
SE05.03.2014
Former [2014/37]CY05.03.2014
FI05.03.2014
LT05.03.2014
SE05.03.2014
Former [2014/36]LT05.03.2014
Documents cited:Search[Y]US5646844  (GUDAT ADAM J [US], et al) [Y] 1-12 * Zusammenfassung * * column 2, lines 11-18 * * column 5, line 61 - column 6, line 9 * * column 10, line 57 - column 11, line 25 * * figures 1, 4A *;
 [YD]DE19629618  (CLAAS OHG [DE]) [YD] 1-12 * Zusammenfassung * * page 2, lines 3-4, 27-39, 58-62 * * page 3, lines 41-43, 61-64 * * page 4, lines 1-7 * * claim 1 * * figures 1,5 *;
 [A]WO0008535  (CATERPILLAR INC [US]) [A] 1-12 * page 3, lines 7-22 ** figures 1, 3, 4, 5 *;
 [A]WO0058800  (CATERPILLAR INC [US]) [A] 1-12 * Zusammenfassung * * page 1, line 27 - page 3, line 9 * * page 6, line 9 - page 7, line 29 * * page 11, lines 17-29 * * page 12, lines 15-29 * * claim 6 * * figure 2 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.