EP2086041 - Apparatus for making tubular-shaped membrane electrode assemblies [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.07.2012 Database last updated on 15.01.2025 | Most recent event Tooltip | 18.07.2014 | Lapse of the patent in a contracting state New state(s): HU | published on 20.08.2014 [2014/34] | Applicant(s) | For all designated states Atomic Energy Council - Institute of Nuclear Energy Research 1000 Wenhua Road Chiaan Village, Lungtan 333 Taoyuan / TW | [2009/32] | Inventor(s) | 01 /
Chang, Hwei-Lang, c/o ATOMIC ENERGY COUNCIL INSTITUTE OF NUCLEAR ENERGY RESEARCH 1000 Wenhua Road 333, CHIAAN VILLAGE, LUNGTAN, TAOYUAN / TW | 02 /
Chang, Hen-Rong No.7, Lane 26, Guanye N. Rd. 324, Pingzhen City, Taoyuan County / TW | 03 /
Shieh, Kuo-Lon No.174, Minsheng Rd. 325, Longtan Shiang, Taoyuan County / TW | 04 /
Cheng, Pi-Hsin No.2, Xinzhong N. Rd. 320, Zhongli City, Taoyuan County / TW | [2011/36] |
Former [2009/32] | 01 /
Chang, Hwei-Lang, c/o ATOMIC ENERGY COUNCIL INSTITUTE OF NUCLEAR ENERGY RESEARCH, 1000 Wenhua Road 333, CHIAAN VILLAGE, LUNGTAN, TAOYUAN / TW | ||
02 /
Chang, Hen-Rong No.7, Lane 26, Guanye N. Rd. 324, Pingzhen City, Taoyuan County / TW | |||
03 /
Shieh, Kuo-Lon No.174, Minsheng Rd. 325, Longtan Shiang, Taoyuan County / TW | |||
04 /
Cheng, Pi-Hsin No.2, Xinzhong N. Rd. 320, Zhongli City, Taoyuan County / TW | Representative(s) | Beck & Rössig European Patent Attorneys Denninger Str. 169 81925 München / DE | [N/P] |
Former [2011/36] | Beck & Rössig European Patent Attorneys Cuvilliésstrasse 14 81679 München / DE | ||
Former [2009/32] | Beck & Rössig European Patent Attorneys Cuvilliésstrasse 14 81679 München / DE | Application number, filing date | 08101243.7 | 04.02.2008 | [2009/32] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2086041 | Date: | 05.08.2009 | Language: | EN | [2009/32] | Type: | B1 Patent specification | No.: | EP2086041 | Date: | 07.09.2011 | Language: | EN | [2011/36] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.07.2008 | Classification | IPC: | H01M8/00, H01M8/10 | [2009/32] | CPC: |
H01M8/00 (EP);
H01M4/881 (EP);
H01M4/8828 (EP);
H01M8/004 (EP);
H01M8/1083 (EP);
H01M8/1088 (EP);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2009/32] | Title | German: | Vorrichtung zur Herstellung von röhrenförmigen Membran-Elektroden-Einheiten | [2009/32] | English: | Apparatus for making tubular-shaped membrane electrode assemblies | [2009/32] | French: | Appareil de fabrication des ensembles membrane-électrode tubulaires | [2009/32] | Examination procedure | 03.03.2008 | Examination requested [2009/32] | 09.03.2010 | Despatch of a communication from the examining division (Time limit: M06) | 20.09.2010 | Reply to a communication from the examining division | 18.03.2011 | Communication of intention to grant the patent | 27.06.2011 | Fee for grant paid | 27.06.2011 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 09.03.2010 | Opposition(s) | 11.06.2012 | No opposition filed within time limit [2012/33] | Fees paid | Renewal fee | 01.03.2010 | Renewal fee patent year 03 | 28.02.2011 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.02.2008 | AT | 07.09.2011 | BE | 07.09.2011 | CY | 07.09.2011 | CZ | 07.09.2011 | DK | 07.09.2011 | EE | 07.09.2011 | FI | 07.09.2011 | HR | 07.09.2011 | IT | 07.09.2011 | LT | 07.09.2011 | LV | 07.09.2011 | MT | 07.09.2011 | NL | 07.09.2011 | PL | 07.09.2011 | RO | 07.09.2011 | SE | 07.09.2011 | SI | 07.09.2011 | SK | 07.09.2011 | TR | 07.09.2011 | BG | 07.12.2011 | NO | 07.12.2011 | GR | 08.12.2011 | ES | 18.12.2011 | IS | 07.01.2012 | PT | 09.01.2012 | IE | 04.02.2012 | LU | 04.02.2012 | CH | 29.02.2012 | LI | 29.02.2012 | MC | 29.02.2012 | [2014/34] |
Former [2014/27] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
DK | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
MT | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
TR | 07.09.2011 | ||
BG | 07.12.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
ES | 18.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
IE | 04.02.2012 | ||
LU | 04.02.2012 | ||
CH | 29.02.2012 | ||
LI | 29.02.2012 | ||
MC | 29.02.2012 | ||
Former [2014/21] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
DK | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
MT | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
TR | 07.09.2011 | ||
BG | 07.12.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
ES | 18.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
IE | 04.02.2012 | ||
CH | 29.02.2012 | ||
LI | 29.02.2012 | ||
MC | 29.02.2012 | ||
Former [2013/35] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
DK | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
MT | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
BG | 07.12.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
ES | 18.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
IE | 04.02.2012 | ||
CH | 29.02.2012 | ||
LI | 29.02.2012 | ||
MC | 29.02.2012 | ||
Former [2013/29] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
DK | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
BG | 07.12.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
ES | 18.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
IE | 04.02.2012 | ||
CH | 29.02.2012 | ||
LI | 29.02.2012 | ||
MC | 29.02.2012 | ||
Former [2013/22] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
DK | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
ES | 18.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
IE | 04.02.2012 | ||
CH | 29.02.2012 | ||
LI | 29.02.2012 | ||
MC | 29.02.2012 | ||
Former [2013/08] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
DK | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
IE | 04.02.2012 | ||
CH | 29.02.2012 | ||
LI | 29.02.2012 | ||
MC | 29.02.2012 | ||
Former [2012/49] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
DK | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
CH | 29.02.2012 | ||
LI | 29.02.2012 | ||
MC | 29.02.2012 | ||
Former [2012/42] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
DK | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
MC | 29.02.2012 | ||
Former [2012/35] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
DK | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
Former [2012/26] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
Former [2012/23] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
NL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
Former [2012/21] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
IS | 07.01.2012 | ||
Former [2012/18] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
Former [2012/12] | AT | 07.09.2011 | |
CY | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | Documents cited: | Search | [XY]WO03103079 (HOEHBERGER ULRICH F H [DE]) [X] 1-3,7 * page 14, line 24 - page 15, line 23; figure 2 * * page 18, line 4 - line 31 * * page 11, line 27 - line 28 * * page 16, line 28 - line 34 * [Y] 4-6,8,9; | [Y]US2006251942 (CHANG HWEI-LANG [TW], et al) [Y] 4-6,8,9 * paragraphs [0012] , [0017] - [0019]; figure 1 *; | [A]WO2007029873 (TOYOTA MOTOR CO LTD [JP], et al) [A] 1-9 * abstract ** page 4, line 3 - line 14 *; | [Y]WO2007147271 (HUBER+SUHNER AG [CH], et al) [Y] 4-6 * page 2, line 17 - line 20 * * page 3, line 9 - page 4, line 15 * | by applicant | WO03103079 | US2006251942 |