blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2107490

EP2107490 - System and method for providing code signing services [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.07.2013
Database last updated on 23.04.2024
Most recent event   Tooltip18.07.2014Lapse of the patent in a contracting state
New state(s): HU
published on 20.08.2014  [2014/34]
Applicant(s)For all designated states
Research In Motion Limited
295 Phillip Street
Waterloo, ON N2L 3W8 / CA
[2012/35]
Former [2009/41]For all designated states
Research In Motion Limited
295 Phillip Street
Waterloo, Ontario N2L 3W8 / CA
Inventor(s)01 / Kirkup, Michael G.
224 Dearborn Boulevard
Waterloo Ontario N2J 4Y3 / CA
02 / Little, Herb
504 Old Oak Place
Waterloo Ontario N2T 2V8 / CA
03 / Tapuska, David
712 Willow Wood Place
Waterloo, Ontario N2T 2T7 / CA
04 / Adams, Neil
550 Little Dover Crescent
Waterloo Ontario N2K 4E4 / CA
 [2012/35]
Former [2009/41]01 / Kirkup, Michael G.
224 Dearborn Boulevard
Waterloo Ontario N2J 4Y3 / CA
02 / Little, Herb
504 Old Oak Place
Waterloo Ontario N2T 2V8 / CA
03 / Tapuska, David
712 Willow Wood Place
Waterloo, Ontario N2T 2T7 / CA
04 / Adams, Neil
550 Little Dover Crescent
Waterloo Ontario N2K 4E4 / CA
Representative(s)Moore, Barry, et al
Hanna Moore + Curley
Garryard House
25/26 Earlsfort Terrace
Dublin 2, D02 PX51 / IE
[N/P]
Former [2011/44]Moore, Barry, et al
Hanna Moore & Curley 13 Lower Lad Lane
Dublin 2 / IE
Former [2010/51]Rickard, David John, et al
Ipulse 26 Mallinson Road London
SW11 1BP / GB
Former [2009/41]Rickard, David John, et al
Ipulse 26 Mallinson Road London
SW11 1BP / GB
Application number, filing date09166462.329.09.2005
[2009/41]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2107490
Date:07.10.2009
Language:EN
[2009/41]
Type: A3 Search report 
No.:EP2107490
Date:14.10.2009
[2009/42]
Type: B1 Patent specification 
No.:EP2107490
Date:29.08.2012
Language:EN
[2012/35]
Type: B9 Corrected patent specification 
No.:EP2107490
Date:06.11.2013
[2013/45]
Search report(s)(Supplementary) European search report - dispatched on:EP15.09.2009
ClassificationIPC:G06F21/22, G06F21/00
[2009/42]
CPC:
G06F21/42 (EP); G06F21/645 (EP)
Former IPC [2009/41]G06F21/24, G06F21/20
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2009/41]
TitleGerman:System und Verfahren zur Bereitstellung von Codesignierungsdiensten[2009/41]
English:System and method for providing code signing services[2009/41]
French:Système et procédé de fourniture de services de signature numérique de code[2009/41]
Examination procedure27.07.2009Examination requested  [2009/41]
05.11.2009Amendment by applicant (claims and/or description)
07.11.2011Communication of intention to grant the patent
23.04.2012Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time
03.07.2012Fee for grant paid
03.07.2012Fee for publishing/printing paid
Parent application(s)   TooltipEP05109041.3  / EP1770589
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20050109041) is  28.06.2007
Opposition(s)30.05.2013No opposition filed within time limit [2013/32]
Request for further processing for:The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent
03.07.2012Request for further processing filed
03.07.2012Full payment received (date of receipt of payment)
Request granted
11.07.2012Decision despatched
Fees paidRenewal fee
27.07.2009Renewal fee patent year 03
27.07.2009Renewal fee patent year 04
27.07.2009Renewal fee patent year 05
14.09.2010Renewal fee patent year 06
29.09.2011Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.09.2005
AT29.08.2012
BE29.08.2012
CY29.08.2012
CZ29.08.2012
DK29.08.2012
EE29.08.2012
FI29.08.2012
IT29.08.2012
LT29.08.2012
LV29.08.2012
PL29.08.2012
RO29.08.2012
SE29.08.2012
SI29.08.2012
SK29.08.2012
TR29.08.2012
IE29.09.2012
LU29.09.2012
CH30.09.2012
LI30.09.2012
MC30.09.2012
BG29.11.2012
GR30.11.2012
ES10.12.2012
IS29.12.2012
PT31.12.2012
[2014/34]
Former [2014/27]AT29.08.2012
BE29.08.2012
CY29.08.2012
CZ29.08.2012
DK29.08.2012
EE29.08.2012
FI29.08.2012
IT29.08.2012
LT29.08.2012
LV29.08.2012
PL29.08.2012
RO29.08.2012
SE29.08.2012
SI29.08.2012
SK29.08.2012
TR29.08.2012
IE29.09.2012
LU29.09.2012
CH30.09.2012
LI30.09.2012
MC30.09.2012
BG29.11.2012
GR30.11.2012
ES10.12.2012
IS29.12.2012
PT31.12.2012
Former [2014/21]AT29.08.2012
BE29.08.2012
CY29.08.2012
CZ29.08.2012
DK29.08.2012
EE29.08.2012
FI29.08.2012
IT29.08.2012
LT29.08.2012
LV29.08.2012
PL29.08.2012
RO29.08.2012
SE29.08.2012
SI29.08.2012
SK29.08.2012
TR29.08.2012
IE29.09.2012
CH30.09.2012
LI30.09.2012
MC30.09.2012
BG29.11.2012
GR30.11.2012
ES10.12.2012
IS29.12.2012
PT31.12.2012
Former [2013/34]AT29.08.2012
BE29.08.2012
CY29.08.2012
CZ29.08.2012
DK29.08.2012
EE29.08.2012
FI29.08.2012
IT29.08.2012
LT29.08.2012
LV29.08.2012
PL29.08.2012
RO29.08.2012
SE29.08.2012
SI29.08.2012
SK29.08.2012
IE29.09.2012
CH30.09.2012
LI30.09.2012
MC30.09.2012
BG29.11.2012
GR30.11.2012
ES10.12.2012
IS29.12.2012
PT31.12.2012
Former [2013/33]AT29.08.2012
BE29.08.2012
CY29.08.2012
CZ29.08.2012
DK29.08.2012
EE29.08.2012
FI29.08.2012
IT29.08.2012
LT29.08.2012
LV29.08.2012
PL29.08.2012
RO29.08.2012
SE29.08.2012
SI29.08.2012
SK29.08.2012
IE29.09.2012
CH30.09.2012
LI30.09.2012
MC30.09.2012
GR30.11.2012
ES10.12.2012
IS29.12.2012
PT31.12.2012
Former [2013/23]AT29.08.2012
BE29.08.2012
CY29.08.2012
CZ29.08.2012
DK29.08.2012
EE29.08.2012
FI29.08.2012
IT29.08.2012
LT29.08.2012
LV29.08.2012
PL29.08.2012
RO29.08.2012
SE29.08.2012
SI29.08.2012
SK29.08.2012
MC30.09.2012
GR30.11.2012
ES10.12.2012
IS29.12.2012
PT31.12.2012
Former [2013/22]AT29.08.2012
BE29.08.2012
CZ29.08.2012
DK29.08.2012
EE29.08.2012
FI29.08.2012
LT29.08.2012
LV29.08.2012
SE29.08.2012
SI29.08.2012
MC30.09.2012
GR30.11.2012
ES10.12.2012
IS29.12.2012
PT31.12.2012
Former [2013/21]AT29.08.2012
BE29.08.2012
DK29.08.2012
FI29.08.2012
LT29.08.2012
LV29.08.2012
SE29.08.2012
SI29.08.2012
MC30.09.2012
GR30.11.2012
IS29.12.2012
PT31.12.2012
Former [2013/20]AT29.08.2012
BE29.08.2012
FI29.08.2012
LT29.08.2012
LV29.08.2012
SE29.08.2012
SI29.08.2012
MC30.09.2012
GR30.11.2012
IS29.12.2012
PT31.12.2012
Former [2013/13]AT29.08.2012
BE29.08.2012
FI29.08.2012
LT29.08.2012
LV29.08.2012
SE29.08.2012
SI29.08.2012
GR30.11.2012
IS29.12.2012
PT31.12.2012
Former [2013/12]AT29.08.2012
BE29.08.2012
FI29.08.2012
LT29.08.2012
LV29.08.2012
SE29.08.2012
SI29.08.2012
GR30.11.2012
IS29.12.2012
Former [2013/11]AT29.08.2012
FI29.08.2012
LT29.08.2012
LV29.08.2012
SI29.08.2012
GR30.11.2012
IS29.12.2012
Former [2013/10]AT29.08.2012
FI29.08.2012
LT29.08.2012
IS29.12.2012
Former [2013/09]AT29.08.2012
FI29.08.2012
LT29.08.2012
Former [2013/08]AT29.08.2012
LT29.08.2012
Former [2013/07]AT29.08.2012
Documents cited:Search[A]WO9959286  (CERTICOM CORP [CA], et al) [A] 1-11 * the whole document *;
 [A]WO0113574  (ACCELA COM INC [US], et al) [A] 1-11 * the whole document *;
 [A]US6367012  (ATKINSON ROBERT G [US], et al) [A] 1-11 * the whole document *;
 [A]US6453416  (EPSTEIN MICHAEL A [US]) [A] 1-11* the whole document *;
 [A]EP1318488  (MATSUSHITA ELECTRIC IND CO LTD [JP]) [A] 1-11 * paragraph [0007] - paragraph [0008] * * paragraph [0037] * * paragraph [0079] - paragraph [0081]; figures 4,5 *;
 [E]WO2006000531  (GEMPLUS CARD INT [FR], et al) [E] 1-11 * page 11, line 27 - page 13, line 24 *;
 [A]  - "AUTHENTICATED CONTENT SIGNING FOR SYMBIAN", INTERNET CITATION, (20050308), URL: http://web.archive.org/web/20050308164449/www.verisign.com/products-services/security-services/code-signing/symbian-content-signing/index.html, (20060207), XP002367140 [A] 1-11 * the whole document *
by applicantUS6367012
 US6453416
 EP1318488
 WO2006000531
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.