EP2257934 - ABNORMALITY DETECTION DEVICE, METHOD OF DETECTING ABNORMALITY, AND ABNORMALITY INFORMATION TRANSMISSION SYSTEM [Right-click to bookmark this link] | |||
Former [2010/49] | ABNORMALITY DETECTION DEVICE, ABNORMALITY INFORMATION TRANSMISSION METHOD, AND ABNORMALITY INFORMATION TRANSMISSION SYSTEM | ||
[2018/15] | Status | No opposition filed within time limit Status updated on 26.07.2019 Database last updated on 15.01.2025 | |
Former | The patent has been granted Status updated on 17.08.2018 | ||
Former | Grant of patent is intended Status updated on 08.04.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states TOYOTA JIDOSHA KABUSHIKI KAISHA 1, Toyota-cho Toyota-shi, Aichi-ken, 471-8571 / JP | [2018/38] |
Former [2013/09] | For all designated states TOYOTA JIDOSHA KABUSHIKI KAISHA 1, Toyota-cho Toyota-shi Aichi-ken, 471-8571 / JP | ||
Former [2010/49] | For all designated states Toyota Jidosha Kabushiki Kaisha 1 Toyota-cho Toyota-shi, Aichi 471-8571 / JP | Inventor(s) | 01 /
TOMINAGA, Hiroshi c/o TOYOTA JIDOSHA KABUSHIKI KAISHA 1 Toyota-cho Toyota-shi Aichi 471-8571 / JP | 02 /
KAWAGUCHI, Keizoh c/o TOYOTA JIDOSHA KABUSHIKI KAISHA 1 Toyota-cho Toyota-shi Aichi 471-8571 / JP | [2018/38] |
Former [2010/49] | 01 /
TOMINAGA, Hiroshi c/o TOYOTA JIDOSHA KABUSHIKI KAISHA 1 Toyota-cho Toyota-shi Aichi 471-8571 / JP | ||
02 /
KAWAGUCHI, Keizoh c/o TOYOTA JIDOSHA KABUSHIKI KAISHA 1 Toyota-cho Toyota-shi Aichi 471-8571 / JP | Representative(s) | Intès, Didier Gérard André, et al Cabinet Beau de Loménie 158 rue de l'Université 75340 Paris Cedex 07 / FR | [2018/38] |
Former [2010/49] | Intès, Didier Gérard André, et al Cabinet Beau de Loménie 158, rue de l'Université 75340 Paris Cedex 07 / FR | Application number, filing date | 09725462.7 | 19.03.2009 | [2010/49] | WO2009JP56217 | Priority number, date | JP20080077293 | 25.03.2008 Original published format: JP 2008077293 | [2010/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2009119783 | Date: | 01.10.2009 | Language: | EN | [2009/40] | Type: | A1 Application with search report | No.: | EP2257934 | Date: | 08.12.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 01.10.2009 takes the place of the publication of the European patent application. | [2010/49] | Type: | B1 Patent specification | No.: | EP2257934 | Date: | 19.09.2018 | Language: | EN | [2018/38] | Search report(s) | International search report - published on: | EP | 01.10.2009 | Classification | IPC: | G07C5/00, G07C5/08, B60R25/10 | [2010/49] | CPC: |
G07C5/008 (EP,US);
G07C5/0808 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2018/38] |
Former [2010/49] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | VORRICHTUNG ZUR ERKENNUNG VON ANOMALIEN, VERFAHREN ZUR ERKENNUNG VON ANOMALIEN UND SYSTEM ZUR ÜBERTRAGUNG VON INFORMATIONEN ÜBER ANOMALIEN | [2018/15] | English: | ABNORMALITY DETECTION DEVICE, METHOD OF DETECTING ABNORMALITY, AND ABNORMALITY INFORMATION TRANSMISSION SYSTEM | [2018/15] | French: | DISPOSITIF DE DÉTECTION D'ANOMALIE, PROCÉDÉ DE DÉTECTION D'ANOMALIE, ET SYSTÈME DE TRANSMISSION D'INFORMATIONS D'ANOMALIE | [2018/15] |
Former [2010/49] | VORRICHTUNG ZUR ERKENNUNG VON ANOMALIEN, VERFAHREN ZUR ÜBERTRAGUNG VON INFORMATIONEN ÜBER ANOMALIEN UND SYSTEM ZUR ÜBERTRAGUNG VON INFORMATIONEN ÜBER ANOMALIEN | ||
Former [2010/49] | ABNORMALITY DETECTION DEVICE, ABNORMALITY INFORMATION TRANSMISSION METHOD, AND ABNORMALITY INFORMATION TRANSMISSION SYSTEM | ||
Former [2010/49] | DISPOSITIF DE DÉTECTION D'ANOMALIE, PROCÉDÉ DE TRANSMISSION D'INFORMATIONS D'ANOMALIE, ET SYSTÈME DE TRANSMISSION D'INFORMATIONS D'ANOMALIE | Entry into regional phase | 12.08.2010 | National basic fee paid | 12.08.2010 | Designation fee(s) paid | 12.08.2010 | Examination fee paid | Examination procedure | 21.12.2009 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 12.08.2010 | Amendment by applicant (claims and/or description) | 12.08.2010 | Examination requested [2010/49] | 22.06.2016 | Despatch of a communication from the examining division (Time limit: M04) | 30.09.2016 | Reply to a communication from the examining division | 09.04.2018 | Communication of intention to grant the patent | 03.08.2018 | Fee for grant paid | 03.08.2018 | Fee for publishing/printing paid | 03.08.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 22.06.2016 | Opposition(s) | 20.06.2019 | No opposition filed within time limit [2019/35] | Fees paid | Renewal fee | 14.02.2011 | Renewal fee patent year 03 | 14.03.2012 | Renewal fee patent year 04 | 11.03.2013 | Renewal fee patent year 05 | 12.03.2014 | Renewal fee patent year 06 | 10.03.2015 | Renewal fee patent year 07 | 10.03.2016 | Renewal fee patent year 08 | 10.03.2017 | Renewal fee patent year 09 | 13.03.2018 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.03.2009 | AT | 19.09.2018 | CY | 19.09.2018 | CZ | 19.09.2018 | DK | 19.09.2018 | EE | 19.09.2018 | ES | 19.09.2018 | FI | 19.09.2018 | HR | 19.09.2018 | IT | 19.09.2018 | LT | 19.09.2018 | LV | 19.09.2018 | MC | 19.09.2018 | MK | 19.09.2018 | NL | 19.09.2018 | PL | 19.09.2018 | RO | 19.09.2018 | SE | 19.09.2018 | SI | 19.09.2018 | SK | 19.09.2018 | TR | 19.09.2018 | BG | 19.12.2018 | NO | 19.12.2018 | GR | 20.12.2018 | IS | 19.01.2019 | PT | 19.01.2019 | IE | 19.03.2019 | LU | 19.03.2019 | MT | 19.03.2019 | BE | 31.03.2019 | CH | 31.03.2019 | LI | 31.03.2019 | [2022/31] |
Former [2021/32] | HU | 19.03.2009 | |
AT | 19.09.2018 | ||
CY | 19.09.2018 | ||
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
TR | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
IE | 19.03.2019 | ||
LU | 19.03.2019 | ||
MT | 19.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2021/26] | AT | 19.09.2018 | |
CY | 19.09.2018 | ||
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
TR | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
IE | 19.03.2019 | ||
LU | 19.03.2019 | ||
MT | 19.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/29] | AT | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
TR | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
IE | 19.03.2019 | ||
LU | 19.03.2019 | ||
MT | 19.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/17] | AT | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
TR | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
IE | 19.03.2019 | ||
LU | 19.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/11] | AT | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
IE | 19.03.2019 | ||
LU | 19.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/09] | AT | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
IE | 19.03.2019 | ||
LU | 19.03.2019 | ||
Former [2020/01] | AT | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
LU | 19.03.2019 | ||
Former [2019/50] | AT | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/46] | AT | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/34] | AT | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/26] | AT | 19.09.2018 | |
CZ | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/23] | AT | 19.09.2018 | |
CZ | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
Former [2019/22] | CZ | 19.09.2018 | |
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
Former [2019/21] | FI | 19.09.2018 | |
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
Former [2019/20] | FI | 19.09.2018 | |
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/12] | FI | 19.09.2018 | |
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/11] | FI | 19.09.2018 | |
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/10] | FI | 19.09.2018 | |
LT | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/08] | FI | 19.09.2018 | |
LT | 19.09.2018 | ||
NO | 19.12.2018 | ||
Former [2019/07] | LT | 19.09.2018 | Cited in | International search | [A]US6067009 (HOZUKA MINORU [JP], et al) [A] 1-10 * abstract * * column 2, line 7 - line 64 *; | [A]US6256594 (YAMAMOTO SHIGERU [JP], et al) [A] 1-10 * abstract ** column 2, line 15 - line 64 *; | [XI]US2005021200 (TAKI NAOKI [JP]) [X] 1,4-6,8-9 * abstract * * paragraph [0007] - paragraph [0013] * * paragraph [0036] - paragraph [0043] * * paragraph [0107] - paragraph [0110] * * figures 2,6 * [I] 2-3,7,10; | [A]US2007126559 (ADACHI AKITO [JP]) [A] 1-10 * abstract * * paragraph [0017] - paragraph [0022] * | by applicant | JP2005041438 |