EP2387840 - INTERPOLATED CHANNEL ESTIMATION FOR MOBILE OFDM SYSTEMS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.04.2014 Database last updated on 15.01.2025 | Most recent event Tooltip | 22.06.2018 | Lapse of the patent in a contracting state New state(s): MK | published on 25.07.2018 [2018/30] | Applicant(s) | For all designated states Abilis Systems Sarl 3, chemin du Pré-Fleuri 1228 Plan-Les-Ouates / CH | [2011/47] | Inventor(s) | 01 /
BUTUSSI, Matteo 30 L'ancienne route CH-1218 Grand-Saconnex / CH | 02 /
TOMASIN, Stefano Università di Padova via Gardenigo 6/B I-35131 Padova / IT | [2013/03] |
Former [2011/47] | 01 /
BUTUSSI, Matteo 30 L'ancienne route CH-1218 Grand-Saconnex / CH | ||
02 /
TOMASIN, Stefano Università di Padova via Gardenigo 6/B I-35131 Padova / IT | Representative(s) | P&TS SA (AG, Ltd.) Avenue J.-J. Rousseau 4 P.O. Box 2848 2001 Neuchâtel / CH | [N/P] |
Former [2011/47] | P&TS SA (AG, Ltd.) Av. J.-J. Rousseau 4 P.O. Box 2848 2001 Neuchâtel / CH | Application number, filing date | 10700419.4 | 18.01.2010 | WO2010EP50498 | Priority number, date | EP20090150802 | 16.01.2009 Original published format: EP 09150802 | [2011/47] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2010081896 | Date: | 22.07.2010 | Language: | EN | [2010/29] | Type: | A2 Application without search report | No.: | EP2387840 | Date: | 23.11.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.07.2010 takes the place of the publication of the European patent application. | [2011/47] | Type: | B1 Patent specification | No.: | EP2387840 | Date: | 05.06.2013 | Language: | EN | [2013/23] | Search report(s) | International search report - published on: | EP | 02.12.2010 | Classification | IPC: | H04L25/02, H04L27/26 | [2011/47] | CPC: |
H04L25/0232 (EP,US);
H04L27/2647 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2013/23] | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | INTERPOLIERTE KANALSCHÄTZUNG FÜR MOBIL-OFDM-SYSTEME | [2011/47] | English: | INTERPOLATED CHANNEL ESTIMATION FOR MOBILE OFDM SYSTEMS | [2011/47] | French: | ÉVALUATION INTERPOLÉE DES CANAUX POUR SYSTÈMES OFDM MOBILES | [2011/47] | Entry into regional phase | 15.08.2011 | National basic fee paid | 15.08.2011 | Designation fee(s) paid | 15.08.2011 | Examination fee paid | Examination procedure | 15.08.2011 | Amendment by applicant (claims and/or description) | 15.08.2011 | Examination requested [2011/47] | 22.05.2012 | Despatch of a communication from the examining division (Time limit: M04) | 11.09.2012 | Reply to a communication from the examining division | 20.12.2012 | Communication of intention to grant the patent | 18.04.2013 | Fee for grant paid | 18.04.2013 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 22.05.2012 | Opposition(s) | 06.03.2014 | No opposition filed within time limit [2014/20] | Fees paid | Renewal fee | 25.01.2012 | Renewal fee patent year 03 | 28.01.2013 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.01.2010 | AT | 05.06.2013 | BE | 05.06.2013 | CY | 05.06.2013 | CZ | 05.06.2013 | DK | 05.06.2013 | EE | 05.06.2013 | FI | 05.06.2013 | HR | 05.06.2013 | IT | 05.06.2013 | LT | 05.06.2013 | LV | 05.06.2013 | MC | 05.06.2013 | MK | 05.06.2013 | MT | 05.06.2013 | NL | 05.06.2013 | PL | 05.06.2013 | RO | 05.06.2013 | SE | 05.06.2013 | SI | 05.06.2013 | SK | 05.06.2013 | SM | 05.06.2013 | TR | 05.06.2013 | BG | 05.09.2013 | NO | 05.09.2013 | GR | 06.09.2013 | ES | 16.09.2013 | IS | 05.10.2013 | PT | 07.10.2013 | IE | 18.01.2014 | LU | 18.01.2014 | CH | 31.01.2014 | LI | 31.01.2014 | [2018/30] |
Former [2016/33] | HU | 18.01.2010 | |
AT | 05.06.2013 | ||
BE | 05.06.2013 | ||
CY | 05.06.2013 | ||
CZ | 05.06.2013 | ||
DK | 05.06.2013 | ||
EE | 05.06.2013 | ||
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
IT | 05.06.2013 | ||
LT | 05.06.2013 | ||
LV | 05.06.2013 | ||
MC | 05.06.2013 | ||
MT | 05.06.2013 | ||
NL | 05.06.2013 | ||
PL | 05.06.2013 | ||
RO | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
SK | 05.06.2013 | ||
SM | 05.06.2013 | ||
TR | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
IS | 05.10.2013 | ||
PT | 07.10.2013 | ||
IE | 18.01.2014 | ||
LU | 18.01.2014 | ||
CH | 31.01.2014 | ||
LI | 31.01.2014 | ||
Former [2016/32] | HU | 18.01.2010 | |
AT | 05.06.2013 | ||
BE | 05.06.2013 | ||
CY | 05.06.2013 | ||
CZ | 05.06.2013 | ||
DK | 05.06.2013 | ||
EE | 05.06.2013 | ||
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
IT | 05.06.2013 | ||
LT | 05.06.2013 | ||
LV | 05.06.2013 | ||
MC | 05.06.2013 | ||
MT | 05.06.2013 | ||
NL | 05.06.2013 | ||
PL | 05.06.2013 | ||
RO | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
SK | 05.06.2013 | ||
SM | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
IS | 05.10.2013 | ||
PT | 07.10.2013 | ||
IE | 18.01.2014 | ||
LU | 18.01.2014 | ||
CH | 31.01.2014 | ||
LI | 31.01.2014 | ||
Former [2016/31] | AT | 05.06.2013 | |
BE | 05.06.2013 | ||
CY | 05.06.2013 | ||
CZ | 05.06.2013 | ||
DK | 05.06.2013 | ||
EE | 05.06.2013 | ||
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
IT | 05.06.2013 | ||
LT | 05.06.2013 | ||
LV | 05.06.2013 | ||
MC | 05.06.2013 | ||
MT | 05.06.2013 | ||
NL | 05.06.2013 | ||
PL | 05.06.2013 | ||
RO | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
SK | 05.06.2013 | ||
SM | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
IS | 05.10.2013 | ||
PT | 07.10.2013 | ||
IE | 18.01.2014 | ||
LU | 18.01.2014 | ||
CH | 31.01.2014 | ||
LI | 31.01.2014 | ||
Former [2016/22] | AT | 05.06.2013 | |
BE | 05.06.2013 | ||
CZ | 05.06.2013 | ||
DK | 05.06.2013 | ||
EE | 05.06.2013 | ||
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
IT | 05.06.2013 | ||
LT | 05.06.2013 | ||
LV | 05.06.2013 | ||
MC | 05.06.2013 | ||
MT | 05.06.2013 | ||
NL | 05.06.2013 | ||
PL | 05.06.2013 | ||
RO | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
SK | 05.06.2013 | ||
SM | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
IS | 05.10.2013 | ||
PT | 07.10.2013 | ||
IE | 18.01.2014 | ||
LU | 18.01.2014 | ||
CH | 31.01.2014 | ||
LI | 31.01.2014 | ||
Former [2016/12] | AT | 05.06.2013 | |
BE | 05.06.2013 | ||
CZ | 05.06.2013 | ||
DK | 05.06.2013 | ||
EE | 05.06.2013 | ||
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
IT | 05.06.2013 | ||
LT | 05.06.2013 | ||
LV | 05.06.2013 | ||
MC | 05.06.2013 | ||
MT | 05.06.2013 | ||
NL | 05.06.2013 | ||
PL | 05.06.2013 | ||
RO | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
SK | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
IS | 05.10.2013 | ||
PT | 07.10.2013 | ||
IE | 18.01.2014 | ||
LU | 18.01.2014 | ||
CH | 31.01.2014 | ||
LI | 31.01.2014 | ||
Former [2015/21] | AT | 05.06.2013 | |
BE | 05.06.2013 | ||
CZ | 05.06.2013 | ||
DK | 05.06.2013 | ||
EE | 05.06.2013 | ||
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
IT | 05.06.2013 | ||
LT | 05.06.2013 | ||
LV | 05.06.2013 | ||
MC | 05.06.2013 | ||
NL | 05.06.2013 | ||
PL | 05.06.2013 | ||
RO | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
SK | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
IS | 05.10.2013 | ||
PT | 07.10.2013 | ||
IE | 18.01.2014 | ||
LU | 18.01.2014 | ||
CH | 31.01.2014 | ||
LI | 31.01.2014 | ||
Former [2015/07] | AT | 05.06.2013 | |
BE | 05.06.2013 | ||
CZ | 05.06.2013 | ||
DK | 05.06.2013 | ||
EE | 05.06.2013 | ||
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
IT | 05.06.2013 | ||
LT | 05.06.2013 | ||
LV | 05.06.2013 | ||
NL | 05.06.2013 | ||
PL | 05.06.2013 | ||
RO | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
SK | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
IS | 05.10.2013 | ||
PT | 07.10.2013 | ||
IE | 18.01.2014 | ||
LU | 18.01.2014 | ||
CH | 31.01.2014 | ||
LI | 31.01.2014 | ||
Former [2014/46] | AT | 05.06.2013 | |
BE | 05.06.2013 | ||
CZ | 05.06.2013 | ||
DK | 05.06.2013 | ||
EE | 05.06.2013 | ||
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
IT | 05.06.2013 | ||
LT | 05.06.2013 | ||
LV | 05.06.2013 | ||
NL | 05.06.2013 | ||
PL | 05.06.2013 | ||
RO | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
SK | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
IS | 05.10.2013 | ||
PT | 07.10.2013 | ||
LU | 18.01.2014 | ||
CH | 31.01.2014 | ||
LI | 31.01.2014 | ||
Former [2014/41] | AT | 05.06.2013 | |
BE | 05.06.2013 | ||
CZ | 05.06.2013 | ||
DK | 05.06.2013 | ||
EE | 05.06.2013 | ||
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
IT | 05.06.2013 | ||
LT | 05.06.2013 | ||
LV | 05.06.2013 | ||
NL | 05.06.2013 | ||
PL | 05.06.2013 | ||
RO | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
SK | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
IS | 05.10.2013 | ||
PT | 07.10.2013 | ||
LU | 18.01.2014 | ||
Former [2014/24] | AT | 05.06.2013 | |
BE | 05.06.2013 | ||
CZ | 05.06.2013 | ||
DK | 05.06.2013 | ||
EE | 05.06.2013 | ||
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
IT | 05.06.2013 | ||
LT | 05.06.2013 | ||
LV | 05.06.2013 | ||
NL | 05.06.2013 | ||
PL | 05.06.2013 | ||
RO | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
SK | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
IS | 05.10.2013 | ||
PT | 07.10.2013 | ||
Former [2014/21] | AT | 05.06.2013 | |
BE | 05.06.2013 | ||
CZ | 05.06.2013 | ||
DK | 05.06.2013 | ||
EE | 05.06.2013 | ||
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
LT | 05.06.2013 | ||
LV | 05.06.2013 | ||
NL | 05.06.2013 | ||
PL | 05.06.2013 | ||
RO | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
SK | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
IS | 05.10.2013 | ||
PT | 07.10.2013 | ||
Former [2014/14] | AT | 05.06.2013 | |
BE | 05.06.2013 | ||
CZ | 05.06.2013 | ||
EE | 05.06.2013 | ||
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
LT | 05.06.2013 | ||
LV | 05.06.2013 | ||
NL | 05.06.2013 | ||
PL | 05.06.2013 | ||
RO | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
SK | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
IS | 05.10.2013 | ||
PT | 07.10.2013 | ||
Former [2014/11] | AT | 05.06.2013 | |
BE | 05.06.2013 | ||
CZ | 05.06.2013 | ||
EE | 05.06.2013 | ||
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
LT | 05.06.2013 | ||
LV | 05.06.2013 | ||
PL | 05.06.2013 | ||
RO | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
SK | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
IS | 05.10.2013 | ||
PT | 07.10.2013 | ||
Former [2014/10] | AT | 05.06.2013 | |
BE | 05.06.2013 | ||
CZ | 05.06.2013 | ||
EE | 05.06.2013 | ||
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
LT | 05.06.2013 | ||
LV | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
SK | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
IS | 05.10.2013 | ||
PT | 07.10.2013 | ||
Former [2014/08] | AT | 05.06.2013 | |
BE | 05.06.2013 | ||
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
LT | 05.06.2013 | ||
LV | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
PT | 07.10.2013 | ||
Former [2014/02] | AT | 05.06.2013 | |
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
LT | 05.06.2013 | ||
LV | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
Former [2013/51] | AT | 05.06.2013 | |
FI | 05.06.2013 | ||
HR | 05.06.2013 | ||
LT | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
Former [2013/50] | AT | 05.06.2013 | |
FI | 05.06.2013 | ||
LT | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
BG | 05.09.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
Former [2013/49] | AT | 05.06.2013 | |
FI | 05.06.2013 | ||
LT | 05.06.2013 | ||
SE | 05.06.2013 | ||
SI | 05.06.2013 | ||
NO | 05.09.2013 | ||
GR | 06.09.2013 | ||
ES | 16.09.2013 | ||
Former [2013/48] | AT | 05.06.2013 | |
LT | 05.06.2013 | ||
NO | 05.09.2013 | ||
ES | 16.09.2013 | ||
Former [2013/47] | LT | 05.06.2013 | |
NO | 05.09.2013 | Cited in | International search | [X]WO02067527 (KONINKL PHILIPS ELECTRONICS NV [NL]) [X] 1,2,6 * page 10, line 23 - page 14, line 13 * * figures 3,5 *; | [X]WO2005117381 (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [X] 1-7 * figure 3 * * page 9, line 6 - page 11, line 18 *; | [X]WO2008084784 (MATSUSHITA ELECTRIC IND CO LTD [JP], et al) [X] 1,2,6 * the whole document *; | [XP]EP2051425 (PANASONIC CORP [JP]) [XP] 1,2,6 * figures 18,23,29 * * paragraphs [0013] - [0020] *; | [X] - BAOGUO YANG ET AL, "Channel Estimation for OFDM Transmission in Multipath Fading Channels Based on Parametric Channel Modeling", IEEE TRANSACTIONS ON COMMUNICATIONS, (20010301), vol. 49, no. 3, ISSN 0090-6778, XP011009895 [X] 1-7 * Section III * * figure 1 * | [A] - MINN, H. ET AL, "An Investigation into Time-Domain Approach for OFDM Channel Estimation", IEEE TRANSACTIONS ON BROADCASTING, (20001201), vol. 46, no. 4, ISSN 0018-9316, XP011006138 [A] 1-7 * Sections III-V * | by applicant | - DONG, WU-SHENG LU; ANTHONY C. K. SOONG, IEEE TRANS. WIRELESS COMMUN., (200705), vol. 6, no. 5, pages 1910 - 1920 | - "Channel estimation for OFDM Transmission in multipath Fading Channels based on Parametric Channel Modeling", IEEE TRANSACTIONS ON COMMUNICATIONS, (20010301), vol. 49, no. 3 |