EP2448786 - METHOD FOR CONTROLLING A VEHICLE MEMBER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.09.2019 Database last updated on 15.01.2025 | |
Former | The patent has been granted Status updated on 19.10.2018 | ||
Former | Grant of patent is intended Status updated on 11.06.2018 | ||
Former | Examination is in progress Status updated on 25.11.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Valeo Vision 34, rue Saint André 93012 Bobigny / FR | [2012/19] | Inventor(s) | 01 /
BRADAI, Benazouz 8, Mail Pierre Desproges F-93500 Pantin / FR | 02 /
KUOCH, Siav Kuong 31 ter avenue Joffre F-94100 Saint Maur des Fossés / FR | [2012/21] |
Former [2012/19] | 01 /
BRADAI, Benazouz 125 avenue Jean Jaurès F-93000 Bobigny / FR | ||
02 /
KUOCH, Siav Kuong 31 ter avenue Joffre F-94100 Saint Maur des Fossés / FR | Representative(s) | Claassen, Maarten Pieter, et al Valeo Schalter und Sensoren GmbH CDA-IP Laiernstraße 12 74321 Bietigheim-Bissingen / DE | [N/P] |
Former [2018/47] | Claassen, Maarten Pieter, et al Valeo Schalter und Sensoren GmbH Laiernstraße 12 74321 Bietigheim-Bissingen / DE | ||
Former [2012/19] | (deleted) | Application number, filing date | 10724864.3 | 17.06.2010 | [2018/47] | WO2010EP58585 | Priority number, date | FR20090054400 | 29.06.2009 Original published format: FR 0954400 | [2012/19] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2011000713 | Date: | 06.01.2011 | Language: | FR | [2011/01] | Type: | A1 Application with search report | No.: | EP2448786 | Date: | 09.05.2012 | Language: | FR | The application published by WIPO in one of the EPO official languages on 06.01.2011 takes the place of the publication of the European patent application. | [2012/19] | Type: | B1 Patent specification | No.: | EP2448786 | Date: | 21.11.2018 | Language: | FR | [2018/47] | Search report(s) | International search report - published on: | EP | 06.01.2011 | Classification | IPC: | B60Q1/08, B60Q1/14, G08G1/16, G01C21/26 | [2018/24] | CPC: |
B60Q1/085 (EP,US);
B60Q1/08 (KR);
B60Q1/00 (KR);
B60Q1/1423 (EP,US);
B60W10/04 (KR);
G01C21/26 (EP,US);
G01C21/28 (KR);
G08G1/166 (EP,US);
B60Q2300/334 (EP,US);
|
Former IPC [2012/19] | B60Q1/08, G01C21/28, B60W10/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/19] | Extension states | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN ZUR STEUERUNG EINES FAHRZEUGTEILS | [2012/19] | English: | METHOD FOR CONTROLLING A VEHICLE MEMBER | [2012/19] | French: | PROCÉDÉ DE COMMANDE D'UN ORGANE DE VÉHICULE | [2012/19] | Entry into regional phase | 16.01.2012 | National basic fee paid | 16.01.2012 | Designation fee(s) paid | 16.01.2012 | Examination fee paid | Examination procedure | 16.01.2012 | Examination requested [2012/19] | 02.10.2012 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 11.12.2012 | Amendment by applicant (claims and/or description) | 28.11.2016 | Despatch of a communication from the examining division (Time limit: M06) | 29.05.2017 | Reply to a communication from the examining division | 10.01.2018 | Despatch of a communication from the examining division (Time limit: M04) | 03.05.2018 | Reply to a communication from the examining division | 12.06.2018 | Communication of intention to grant the patent | 10.10.2018 | Fee for grant paid | 10.10.2018 | Fee for publishing/printing paid | 10.10.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.11.2016 | Opposition(s) | 22.08.2019 | No opposition filed within time limit [2019/44] | Request for further processing for: | 11.12.2012 | Request for further processing filed | 11.12.2012 | Full payment received (date of receipt of payment) Request granted | 20.12.2012 | Decision despatched | Fees paid | Renewal fee | 23.06.2012 | Renewal fee patent year 03 | 29.05.2013 | Renewal fee patent year 04 | 20.05.2014 | Renewal fee patent year 05 | 22.05.2015 | Renewal fee patent year 06 | 27.05.2016 | Renewal fee patent year 07 | 30.05.2017 | Renewal fee patent year 08 | 28.05.2018 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.06.2010 | AL | 21.11.2018 | AT | 21.11.2018 | CY | 21.11.2018 | CZ | 21.11.2018 | DK | 21.11.2018 | EE | 21.11.2018 | ES | 21.11.2018 | FI | 21.11.2018 | HR | 21.11.2018 | IT | 21.11.2018 | LT | 21.11.2018 | LV | 21.11.2018 | MC | 21.11.2018 | MK | 21.11.2018 | MT | 21.11.2018 | NL | 21.11.2018 | PL | 21.11.2018 | RO | 21.11.2018 | SE | 21.11.2018 | SI | 21.11.2018 | SK | 21.11.2018 | SM | 21.11.2018 | TR | 21.11.2018 | BG | 21.02.2019 | NO | 21.02.2019 | GR | 22.02.2019 | IS | 21.03.2019 | PT | 21.03.2019 | GB | 17.06.2019 | IE | 17.06.2019 | LU | 17.06.2019 | BE | 30.06.2019 | CH | 30.06.2019 | LI | 30.06.2019 | [2022/31] |
Former [2021/34] | HU | 17.06.2010 | |
AL | 21.11.2018 | ||
AT | 21.11.2018 | ||
CY | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
MT | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
SE | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
GB | 17.06.2019 | ||
IE | 17.06.2019 | ||
LU | 17.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
Former [2021/32] | HU | 17.06.2010 | |
AL | 21.11.2018 | ||
AT | 21.11.2018 | ||
CY | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
SE | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
GB | 17.06.2019 | ||
IE | 17.06.2019 | ||
LU | 17.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
Former [2021/26] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CY | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
SE | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
GB | 17.06.2019 | ||
IE | 17.06.2019 | ||
LU | 17.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
Former [2020/25] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
SE | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
GB | 17.06.2019 | ||
IE | 17.06.2019 | ||
LU | 17.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
Former [2020/24] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
SE | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
GB | 17.06.2019 | ||
IE | 17.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
Former [2020/21] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
SE | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
IE | 17.06.2019 | ||
Former [2020/17] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
SE | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2020/08] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
SE | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/50] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
SE | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/40] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
SE | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/37] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
SE | 21.11.2018 | ||
SM | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/35] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
SE | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/34] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
DK | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
SE | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/26] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
SE | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/24] | AT | 21.11.2018 | |
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
SE | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
Former [2019/23] | AT | 21.11.2018 | |
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
IS | 21.03.2019 | ||
Former [2019/22] | FI | 21.11.2018 | |
LT | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
IS | 21.03.2019 | ||
Former [2019/21] | FI | 21.11.2018 | |
LT | 21.11.2018 | ||
NO | 21.02.2019 | ||
IS | 21.03.2019 | ||
Former [2019/20] | LT | 21.11.2018 | |
NO | 21.02.2019 | Cited in | International search | [XYI]DE19756574 (KOITO MFG CO LTD [JP]) [X] 1-4,9-13,15 * figures 1,14,17,27 * * page 3, line 33 - page 4, line 44 * * page 6, lines 36-45 * * claims 1-3,7,11,12 * [Y] 6-8 [I] 5; | [XI]US2002080618 (KOBAYASHI SHOJI [JP], et al) [X] 1-3,6,9,10,12-15 * figures 1-15 * * paragraphs [0137] - [0143] - [0149] , [0158] , [0167] , [0168] , [0172] - [0180] * * claims 1,2,4-6 * * paragraphs [0012] - [0014] - [0056] - [0071] - [0103] - [0105] * [I] 4,5; | [Y]JP2003279363 (ALPINE ELECTRONICS INC) [Y] 6-8* abstract *; | [I]EP2030838 (GM GLOBAL TECH OPERATIONS INC [US]) [I] 1-5,9,10,12,13,15 * figure 2; claims 1,6 * * paragraphs [0001] , [0005] - [0009] - [0016] * |