EP2569564 - CABLE PULL-IN SYSTEM AND METHOD FOR OFFSHORE STRUCTURES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.01.2016 Database last updated on 25.03.2025 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states Seaproof Solutions AS Sandbrekketoppen 38 5224 Nesttun / NO | [2013/12] | Inventor(s) | 01 /
BANG-ANDRESEN, Henrik Furudalen 19 N-5098 Bergen / NO | 02 /
HATLING, John, Fredrik Skjoldhøyden 37 N-5222 Nesttun / NO | 03 /
TOFTEN, Richard, J. Stavkirkeveien 1B N-5231 Paradis / NO | 04 /
DYBEVIK, Thomas Espedalen 30 N-5353 Straume / NO | [2013/12] | Representative(s) | Onsagers AS P.O. Box 1813 Vika 0123 Oslo / NO | [N/P] |
Former [2013/12] | Onsagers AS Munkedamsveien 35 P.O. Box 1813 Vika 0123 Oslo / NO | Application number, filing date | 11719811.9 | 11.05.2011 | WO2011EP57584 | Priority number, date | US20110443741P | 17.02.2011 Original published format: US 443741 P | US20100333270P | 11.05.2010 Original published format: US 333270 P | [2013/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011141494 | Date: | 17.11.2011 | Language: | EN | [2011/46] | Type: | A1 Application with search report | No.: | EP2569564 | Date: | 20.03.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 17.11.2011 takes the place of the publication of the European patent application. | [2013/12] | Type: | B1 Patent specification | No.: | EP2569564 | Date: | 18.03.2015 | Language: | EN | [2015/12] | Search report(s) | International search report - published on: | EP | 17.11.2011 | Classification | IPC: | F16L1/12, F16L5/00, F16L57/02, H02G1/10, H02G3/22 | [2013/12] | CPC: |
H02G1/10 (EP);
E02B17/027 (EP);
F03D80/85 (EP);
F16L1/123 (EP);
F16L5/02 (EP);
F16L57/02 (EP);
H02G9/02 (EP);
E02B2017/0065 (EP);
E02B2017/0091 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | KABELEINZUGSSYSTEM UND VERFAHREN FÜR OFFSHORE-KONSTRUKTIONEN | [2013/12] | English: | CABLE PULL-IN SYSTEM AND METHOD FOR OFFSHORE STRUCTURES | [2013/12] | French: | SYSTÈME ET MÉTHODE DE TIRAGE DE CÂBLE POUR STRUCTURES OFFSHORE | [2013/12] | Entry into regional phase | 11.12.2012 | National basic fee paid | 11.12.2012 | Designation fee(s) paid | 11.12.2012 | Examination fee paid | Examination procedure | 11.12.2012 | Examination requested [2013/12] | 08.10.2014 | Communication of intention to grant the patent | 02.02.2015 | Fee for grant paid | 02.02.2015 | Fee for publishing/printing paid | 02.02.2015 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 08.10.2014 | Opposition(s) | 21.12.2015 | No opposition filed within time limit [2016/08] | Fees paid | Renewal fee | 27.05.2013 | Renewal fee patent year 03 | 27.03.2014 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.05.2011 | AL | 18.03.2015 | AT | 18.03.2015 | BE | 18.03.2015 | BG | 18.03.2015 | CY | 18.03.2015 | CZ | 18.03.2015 | EE | 18.03.2015 | ES | 18.03.2015 | FI | 18.03.2015 | HR | 18.03.2015 | IT | 18.03.2015 | LT | 18.03.2015 | LV | 18.03.2015 | MC | 18.03.2015 | MK | 18.03.2015 | MT | 18.03.2015 | PL | 18.03.2015 | RO | 18.03.2015 | RS | 18.03.2015 | SI | 18.03.2015 | SK | 18.03.2015 | SM | 18.03.2015 | TR | 18.03.2015 | LU | 11.05.2015 | CH | 31.05.2015 | LI | 31.05.2015 | GR | 19.06.2015 | IS | 18.07.2015 | PT | 20.07.2015 | [2018/46] |
Former [2018/31] | HU | 11.05.2011 | |
AT | 18.03.2015 | ||
BE | 18.03.2015 | ||
BG | 18.03.2015 | ||
CY | 18.03.2015 | ||
CZ | 18.03.2015 | ||
EE | 18.03.2015 | ||
ES | 18.03.2015 | ||
FI | 18.03.2015 | ||
HR | 18.03.2015 | ||
IT | 18.03.2015 | ||
LT | 18.03.2015 | ||
LV | 18.03.2015 | ||
MC | 18.03.2015 | ||
MK | 18.03.2015 | ||
MT | 18.03.2015 | ||
PL | 18.03.2015 | ||
RO | 18.03.2015 | ||
RS | 18.03.2015 | ||
SI | 18.03.2015 | ||
SK | 18.03.2015 | ||
SM | 18.03.2015 | ||
TR | 18.03.2015 | ||
LU | 11.05.2015 | ||
CH | 31.05.2015 | ||
LI | 31.05.2015 | ||
GR | 19.06.2015 | ||
IS | 18.07.2015 | ||
PT | 20.07.2015 | ||
Former [2017/38] | HU | 11.05.2011 | |
AT | 18.03.2015 | ||
BE | 18.03.2015 | ||
BG | 18.03.2015 | ||
CY | 18.03.2015 | ||
CZ | 18.03.2015 | ||
EE | 18.03.2015 | ||
ES | 18.03.2015 | ||
FI | 18.03.2015 | ||
HR | 18.03.2015 | ||
IT | 18.03.2015 | ||
LT | 18.03.2015 | ||
LV | 18.03.2015 | ||
MC | 18.03.2015 | ||
MT | 18.03.2015 | ||
PL | 18.03.2015 | ||
RO | 18.03.2015 | ||
RS | 18.03.2015 | ||
SI | 18.03.2015 | ||
SK | 18.03.2015 | ||
SM | 18.03.2015 | ||
TR | 18.03.2015 | ||
LU | 11.05.2015 | ||
CH | 31.05.2015 | ||
LI | 31.05.2015 | ||
GR | 19.06.2015 | ||
IS | 18.07.2015 | ||
PT | 20.07.2015 | ||
Former [2017/03] | AT | 18.03.2015 | |
BE | 18.03.2015 | ||
CZ | 18.03.2015 | ||
EE | 18.03.2015 | ||
ES | 18.03.2015 | ||
FI | 18.03.2015 | ||
HR | 18.03.2015 | ||
IT | 18.03.2015 | ||
LT | 18.03.2015 | ||
LV | 18.03.2015 | ||
MC | 18.03.2015 | ||
MT | 18.03.2015 | ||
PL | 18.03.2015 | ||
RO | 18.03.2015 | ||
RS | 18.03.2015 | ||
SI | 18.03.2015 | ||
SK | 18.03.2015 | ||
LU | 11.05.2015 | ||
CH | 31.05.2015 | ||
LI | 31.05.2015 | ||
GR | 19.06.2015 | ||
IS | 18.07.2015 | ||
PT | 20.07.2015 | ||
Former [2016/37] | AT | 18.03.2015 | |
BE | 18.03.2015 | ||
CZ | 18.03.2015 | ||
EE | 18.03.2015 | ||
ES | 18.03.2015 | ||
FI | 18.03.2015 | ||
HR | 18.03.2015 | ||
IT | 18.03.2015 | ||
LT | 18.03.2015 | ||
LV | 18.03.2015 | ||
MC | 18.03.2015 | ||
PL | 18.03.2015 | ||
RO | 18.03.2015 | ||
RS | 18.03.2015 | ||
SI | 18.03.2015 | ||
SK | 18.03.2015 | ||
LU | 11.05.2015 | ||
CH | 31.05.2015 | ||
LI | 31.05.2015 | ||
GR | 19.06.2015 | ||
IS | 18.07.2015 | ||
PT | 20.07.2015 | ||
Former [2016/12] | AT | 18.03.2015 | |
CZ | 18.03.2015 | ||
EE | 18.03.2015 | ||
ES | 18.03.2015 | ||
FI | 18.03.2015 | ||
HR | 18.03.2015 | ||
IT | 18.03.2015 | ||
LT | 18.03.2015 | ||
LV | 18.03.2015 | ||
MC | 18.03.2015 | ||
PL | 18.03.2015 | ||
RO | 18.03.2015 | ||
RS | 18.03.2015 | ||
SI | 18.03.2015 | ||
SK | 18.03.2015 | ||
LU | 11.05.2015 | ||
CH | 31.05.2015 | ||
LI | 31.05.2015 | ||
GR | 19.06.2015 | ||
IS | 18.07.2015 | ||
PT | 20.07.2015 | ||
Former [2016/06] | AT | 18.03.2015 | |
CZ | 18.03.2015 | ||
EE | 18.03.2015 | ||
ES | 18.03.2015 | ||
FI | 18.03.2015 | ||
HR | 18.03.2015 | ||
IT | 18.03.2015 | ||
LT | 18.03.2015 | ||
LV | 18.03.2015 | ||
MC | 18.03.2015 | ||
PL | 18.03.2015 | ||
RO | 18.03.2015 | ||
RS | 18.03.2015 | ||
SK | 18.03.2015 | ||
LU | 11.05.2015 | ||
CH | 31.05.2015 | ||
LI | 31.05.2015 | ||
GR | 19.06.2015 | ||
IS | 18.07.2015 | ||
PT | 20.07.2015 | ||
Former [2016/03] | AT | 18.03.2015 | |
CZ | 18.03.2015 | ||
EE | 18.03.2015 | ||
ES | 18.03.2015 | ||
FI | 18.03.2015 | ||
HR | 18.03.2015 | ||
IT | 18.03.2015 | ||
LT | 18.03.2015 | ||
LV | 18.03.2015 | ||
PL | 18.03.2015 | ||
RO | 18.03.2015 | ||
RS | 18.03.2015 | ||
SK | 18.03.2015 | ||
GR | 19.06.2015 | ||
IS | 18.07.2015 | ||
PT | 20.07.2015 | ||
Former [2015/51] | AT | 18.03.2015 | |
CZ | 18.03.2015 | ||
EE | 18.03.2015 | ||
ES | 18.03.2015 | ||
FI | 18.03.2015 | ||
HR | 18.03.2015 | ||
LT | 18.03.2015 | ||
LV | 18.03.2015 | ||
PL | 18.03.2015 | ||
RO | 18.03.2015 | ||
RS | 18.03.2015 | ||
SK | 18.03.2015 | ||
GR | 19.06.2015 | ||
IS | 18.07.2015 | ||
PT | 20.07.2015 | ||
Former [2015/50] | CZ | 18.03.2015 | |
EE | 18.03.2015 | ||
ES | 18.03.2015 | ||
FI | 18.03.2015 | ||
HR | 18.03.2015 | ||
LT | 18.03.2015 | ||
LV | 18.03.2015 | ||
PL | 18.03.2015 | ||
RO | 18.03.2015 | ||
RS | 18.03.2015 | ||
SK | 18.03.2015 | ||
GR | 19.06.2015 | ||
IS | 18.07.2015 | ||
PT | 20.07.2015 | ||
Former [2015/49] | CZ | 18.03.2015 | |
EE | 18.03.2015 | ||
ES | 18.03.2015 | ||
FI | 18.03.2015 | ||
HR | 18.03.2015 | ||
LT | 18.03.2015 | ||
LV | 18.03.2015 | ||
RO | 18.03.2015 | ||
RS | 18.03.2015 | ||
SK | 18.03.2015 | ||
GR | 19.06.2015 | ||
PT | 20.07.2015 | ||
Former [2015/39] | FI | 18.03.2015 | |
HR | 18.03.2015 | ||
LT | 18.03.2015 | ||
LV | 18.03.2015 | ||
RS | 18.03.2015 | ||
GR | 19.06.2015 | ||
Former [2015/37] | FI | 18.03.2015 | |
HR | 18.03.2015 | ||
LT | 18.03.2015 | ||
GR | 19.06.2015 | ||
Former [2015/36] | FI | 18.03.2015 | |
HR | 18.03.2015 | ||
LT | 18.03.2015 | ||
Former [2015/35] | LT | 18.03.2015 | Cited in | International search | [A]JPH07301480 (MATSUSHITA REFRIGERATION) [A] 1,7* abstract *; | [A]EP1985845 (BARD ENGINEERING GMBH [DE]) [A] 1-9 * abstract *; | [A]GB2463940 (TEKMAR ENERGY LTD [GB]) [A] 1-9 * abstract * |