blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2785643

EP2785643 - STABILIZED MICROPOROUS CRYSTALLINE MATERIAL, THE METHOD OF MAKING THE SAME, AND THE USE FOR SELECTIVE CATALYTIC REDUCTION OF NOX [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  07.05.2021
Database last updated on 23.04.2024
FormerThe patent has been granted
Status updated on  29.05.2020
FormerGrant of patent is intended
Status updated on  02.02.2020
FormerExamination is in progress
Status updated on  21.09.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
PQ Corporation
P.O. Box 840
Valley Forge, PA 19482-0840 / US
[2020/27]
Former [2014/41]For all designated states
PQ Corporation
P.O. Box 840
Valley Forge, PA 19482-0840 / US
Inventor(s)01 / LI, Hong-Xin
1048 Charter Oaks Drive
Lansdale, Pennsylvania 19446 / US
02 / CORMIER, William E.
930 Masters Way
Harleysville, Pennsylvania 19438 / US
03 / MODEN, Bjorn
232 S. Azalea Court
Glen Mills, Pennsylvania 19342 / US
 [2014/41]
Representative(s)Finnegan Europe LLP
1 London Bridge
London SE1 9BG / GB
[2020/27]
Former [2014/41]Grünecker, Kinkeldey, Stockmair & Schwanhäusser
Leopoldstrasse 4
80802 München / DE
Application number, filing date12805498.830.11.2012
[2020/27]
WO2012US67474
Priority number, dateUS201161566106P02.12.2011         Original published format: US 201161566106 P
[2014/41]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013082550
Date:06.06.2013
Language:EN
[2013/23]
Type: A1 Application with search report 
No.:EP2785643
Date:08.10.2014
Language:EN
The application published by WIPO in one of the EPO official languages on 06.06.2013 takes the place of the publication of the European patent application.
[2014/41]
Type: B1 Patent specification 
No.:EP2785643
Date:01.07.2020
Language:EN
[2020/27]
Search report(s)International search report - published on:EP06.06.2013
ClassificationIPC:B01J29/85, B01J35/02, C01B39/46, B01J29/70, B01J29/035, C01B39/02, C01B37/08, C01B39/54, B01J29/76
[2020/08]
CPC:
C01B37/08 (EP,US); B01J29/88 (US); B01D53/9418 (US);
B01J29/0356 (EP,US); B01J29/072 (US); B01J29/7065 (EP,US);
B01J29/763 (EP,US); B01J29/83 (US); B01J29/85 (EP,US);
B01J35/40 (EP,US); C01B39/02 (EP,US); C01B39/026 (EP,US);
C01B39/54 (EP,US); B01D2251/2062 (EP,US); B01D2251/2067 (EP,US);
B01D2251/208 (EP,US); B01D2253/1085 (EP,US); B01D2255/202 (EP,US);
B01D2255/2022 (EP,US); B01D2255/204 (EP,US); B01D2255/2042 (EP,US);
B01D2255/2045 (EP,US); B01D2255/2047 (EP,US); B01D2255/2063 (EP,US);
B01D2255/2065 (EP,US); B01D2255/2066 (EP,US); B01D2255/2068 (EP,US);
B01D2255/20738 (EP,US); B01D2255/20761 (EP,US); B01D2255/50 (EP,US);
B01D2255/9205 (EP,US); B01D2255/9207 (EP,US); B01D53/58 (US);
B01J2229/183 (US); B01J2229/186 (EP,US); B01J2229/36 (EP,US);
C01B39/46 (EP,US) (-)
Former IPC [2014/41]C01B37/08, C01B39/54, C01B39/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/41]
Extension statesBA22.05.2014
ME22.05.2014
TitleGerman:STABILISIERTES MIKROPORÖSES KRISTALLINES MATERIAL, VERFAHREN ZU SEINER HERSTELLUNG UND VERWENDUNG ZUR SELEKTIVEN KATALYTISCHEN NOX-REDUKTION[2014/41]
English:STABILIZED MICROPOROUS CRYSTALLINE MATERIAL, THE METHOD OF MAKING THE SAME, AND THE USE FOR SELECTIVE CATALYTIC REDUCTION OF NOX[2014/41]
French:MATÉRIAU CRISTALLIN MICROPOREUX STABILISÉ, PROCÉDÉ DE FABRICATION DE CELUI-CI ET UTILISATION POUR LA RÉDUCTION CATALYTIQUE SÉLECTIVE DE NOX[2014/41]
Entry into regional phase22.05.2014National basic fee paid 
22.05.2014Designation fee(s) paid 
22.05.2014Examination fee paid 
Examination procedure22.05.2014Examination requested  [2014/41]
20.01.2015Amendment by applicant (claims and/or description)
20.09.2018Despatch of a communication from the examining division (Time limit: M04)
30.01.2019Reply to a communication from the examining division
03.02.2020Communication of intention to grant the patent
22.05.2020Fee for grant paid
22.05.2020Fee for publishing/printing paid
22.05.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  20.09.2018
Opposition(s)06.04.2021No opposition filed within time limit [2021/23]
Fees paidRenewal fee
26.11.2014Renewal fee patent year 03
29.04.2016Renewal fee patent year 04
23.11.2016Renewal fee patent year 05
24.11.2017Renewal fee patent year 06
22.11.2018Renewal fee patent year 07
26.11.2019Renewal fee patent year 08
Penalty fee
Additional fee for renewal fee
30.11.201504   M06   Fee paid on   29.04.2016
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.11.2012
AL01.07.2020
AT01.07.2020
CY01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
MK01.07.2020
MT01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
TR01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
BE30.11.2020
CH30.11.2020
IE30.11.2020
LI30.11.2020
LU30.11.2020
[2022/33]
Former [2022/32]HU30.11.2012
AL01.07.2020
AT01.07.2020
CY01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
MK01.07.2020
MT01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
TR01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
CH30.11.2020
IE30.11.2020
LI30.11.2020
LU30.11.2020
Former [2022/27]HU30.11.2012
AL01.07.2020
AT01.07.2020
CY01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
MT01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
TR01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
CH30.11.2020
IE30.11.2020
LI30.11.2020
LU30.11.2020
Former [2022/26]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
TR01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
CH30.11.2020
IE30.11.2020
LI30.11.2020
LU30.11.2020
Former [2021/46]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
CH30.11.2020
IE30.11.2020
LI30.11.2020
LU30.11.2020
Former [2021/37]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
CH30.11.2020
LI30.11.2020
LU30.11.2020
Former [2021/36]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
LU30.11.2020
Former [2021/33]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SK01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
LU30.11.2020
Former [2021/31]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SK01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/28]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SK01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/25]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/22]AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/20]AT01.07.2020
CZ01.07.2020
DK01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
PL01.07.2020
RS01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/11]AT01.07.2020
CZ01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
PL01.07.2020
RS01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/09]AT01.07.2020
CZ01.07.2020
ES01.07.2020
FI01.07.2020
LT01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
PT02.11.2020
Former [2021/08]ES01.07.2020
FI01.07.2020
LT01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
PT02.11.2020
Former [2021/07]FI01.07.2020
LT01.07.2020
BG01.10.2020
NO01.10.2020
Former [2021/01]BG01.10.2020
Cited inInternational search[A]WO2010121257  (JOHNSON MATTHEY PLC [GB], et al) [A] 1-15 * page 3, line 24 - page 26, line 5 *;
 [A]EP2269733  (BASF SE [DE]) [A] 1-15* paragraphs [0041] - [0184] *;
 [XY]EP2308596  (FORD GLOBAL TECH LLC [US]) [X] 1-14 * paragraphs [0023] - [0030] - [0044] - [0072]; examples 2,3 * [Y] 15;
 [XP]EP2428659  (UMICORE AG & CO KG [DE]) [XP] 1-14 * paragraphs [0012] - [0026] - [0027] - [0035]; claims 1-15 *;
 [Y]  - AKOLEKAR D B ET AL, "NO and CO adsorption studies on transition metal-exchanged silico-aluminophosphate of type 34 catalysts", APPLIED CATALYSIS A: GENERAL, ELSEVIER SCIENCE, AMSTERDAM, NL, vol. 207, no. 1-2, ISSN 0926-860X, (20010201), pages 355 - 365, (20010201), XP027370714 [Y] 15 * column III, lines 1-17 *
ExaminationUS2013156668
    - Maggie Zamadics ET AL, "Effect of divalent cations on the location and coordination of copper(II) ions in SAPO-42 molecular sieve", JOURNAL OF PHYSICAL CHEMISTRY, US, (19930401), vol. 97, no. 13, doi:10.1021/j100115a045, ISSN 0022-3654, pages 3359 - 3364, XP055381581

DOI:   http://dx.doi.org/10.1021/j100115a045
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.