blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2803140

EP2803140 - GEOPHYSICAL DATA ACQUISITION SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  20.08.2021
Database last updated on 23.04.2024
FormerThe patent has been granted
Status updated on  11.09.2020
FormerGrant of patent is intended
Status updated on  28.04.2020
FormerExamination is in progress
Status updated on  15.04.2019
Most recent event   Tooltip22.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 24.08.2022  [2022/34]
Applicant(s)For all designated states
KJT Enterprises, Inc.
11999 Katy Freeway, Suite 160
Houston, TX 77079 / US
[2020/46]
Former [2014/47]For all designated states
KJT Enterprises, Inc.
6420 Richmond Ave. Suite 610
Houston, Texas 77057 / US
Inventor(s)01 / JIANG, John
Suite 610
6420 Richmond Ave.
Houston, Texas 77057 / US
02 / AZIZ, Azizuddin, Abdul
Suite 610
6420 Richmond Ave.
Houston, Texas 77057 / US
03 / LIU, Ying
Suite 610
6420 Richmond Ave.
Houston, Texas 77057 / US
04 / STRACK, Kurt-M.
Suite 610
6420 Richmond Ave.
Houston, Texas 77057 / US
 [2014/47]
Representative(s)Cabinet Beau de Loménie
158, rue de l'Université
75340 Paris Cedex 07 / FR
[2020/42]
Former [2014/47]Intès, Didier Gérard André, et al
Cabinet Beau de Loménie
158, rue de l'Université
75340 Paris Cedex 07 / FR
Application number, filing date12810492.413.12.2012
[2020/42]
WO2012US69398
Priority number, dateUS20121334777511.01.2012         Original published format: US201213347775
[2014/47]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2013106158
Date:18.07.2013
Language:EN
[2013/29]
Type: A2 Application without search report 
No.:EP2803140
Date:19.11.2014
Language:EN
The application published by WIPO in one of the EPO official languages on 18.07.2013 takes the place of the publication of the European patent application.
[2014/47]
Type: B1 Patent specification 
No.:EP2803140
Date:14.10.2020
Language:EN
[2020/42]
Type: B8 Corrected title page of specification 
No.:EP2803140
Date:09.12.2020
[2020/50]
Search report(s)International search report - published on:EP17.10.2013
ClassificationIPC:G01V1/16, G01V1/22, G01D3/02, G01V11/00, H03M1/12
[2020/21]
CPC:
G01V11/00 (EP,US); G01V1/164 (EP,US); G01V1/22 (EP,US);
H03M1/124 (EP,US); G01D3/022 (EP,US); H03M1/1255 (EP,US);
H03M1/129 (EP,US) (-)
Former IPC [2014/47]H03M1/12, G01V11/00, G01D3/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/47]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:GEOPHYSIKALISCHES DATENERFASSUNGSSYSTEM[2020/21]
English:GEOPHYSICAL DATA ACQUISITION SYSTEM[2014/47]
French:SYSTÈME D'ACQUISITION DE DONNÉES GÉOPHYSIQUES[2014/47]
Former [2014/47]SYSTEM ZUR ERFASSUNG GEOPHYSIKALISCHER DATEN
Entry into regional phase11.08.2014National basic fee paid 
11.08.2014Designation fee(s) paid 
11.08.2014Examination fee paid 
Examination procedure11.08.2014Amendment by applicant (claims and/or description)
11.08.2014Examination requested  [2014/47]
18.04.2019Despatch of a communication from the examining division (Time limit: M04)
22.08.2019Reply to a communication from the examining division
23.01.2020Despatch of a communication from the examining division (Time limit: M02)
31.03.2020Reply to a communication from the examining division
29.04.2020Communication of intention to grant the patent
03.09.2020Fee for grant paid
03.09.2020Fee for publishing/printing paid
03.09.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  18.04.2019
Opposition(s)15.07.2021No opposition filed within time limit [2021/38]
Fees paidRenewal fee
06.11.2014Renewal fee patent year 03
23.11.2015Renewal fee patent year 04
29.11.2016Renewal fee patent year 05
01.12.2017Renewal fee patent year 06
18.12.2018Renewal fee patent year 07
25.11.2019Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.12.2012
AL14.10.2020
AT14.10.2020
CY14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
IT14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
MK14.10.2020
MT14.10.2020
NL14.10.2020
PL14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
TR14.10.2020
IE13.12.2020
LU13.12.2020
BE31.12.2020
CH31.12.2020
LI31.12.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
[2022/34]
Former [2022/32]HU13.12.2012
AL14.10.2020
AT14.10.2020
CY14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
IT14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
MK14.10.2020
MT14.10.2020
NL14.10.2020
PL14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
TR14.10.2020
IE13.12.2020
LU13.12.2020
CH31.12.2020
LI31.12.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2022/27]HU13.12.2012
AL14.10.2020
AT14.10.2020
CY14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
IT14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
MT14.10.2020
NL14.10.2020
PL14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
TR14.10.2020
IE13.12.2020
LU13.12.2020
CH31.12.2020
LI31.12.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2022/26]AL14.10.2020
AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
IT14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
NL14.10.2020
PL14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
TR14.10.2020
IE13.12.2020
LU13.12.2020
CH31.12.2020
LI31.12.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2022/23]AL14.10.2020
AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
IT14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
NL14.10.2020
PL14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
IE13.12.2020
LU13.12.2020
CH31.12.2020
LI31.12.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2022/10]AL14.10.2020
AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
IT14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
NL14.10.2020
PL14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
IE13.12.2020
LU13.12.2020
CH31.12.2020
LI31.12.2020
BG14.01.2021
GR15.01.2021
PT15.02.2021
Former [2021/52]AL14.10.2020
AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
IT14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
NL14.10.2020
PL14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
IE13.12.2020
LU13.12.2020
CH31.12.2020
LI31.12.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/49]AL14.10.2020
AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
IT14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
NL14.10.2020
PL14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
IE13.12.2020
LU13.12.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/48]AL14.10.2020
AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
IT14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
NL14.10.2020
PL14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SK14.10.2020
SM14.10.2020
IE13.12.2020
LU13.12.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/47]AL14.10.2020
AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
NL14.10.2020
PL14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SK14.10.2020
SM14.10.2020
IE13.12.2020
LU13.12.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/46]AL14.10.2020
AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
NL14.10.2020
PL14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SK14.10.2020
SM14.10.2020
IE13.12.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/45]AL14.10.2020
AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
NL14.10.2020
PL14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/40]AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
NL14.10.2020
PL14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/37]AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
NL14.10.2020
PL14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/36]AT14.10.2020
CZ14.10.2020
EE14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
NL14.10.2020
PL14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/35]AT14.10.2020
CZ14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
NL14.10.2020
PL14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/34]AT14.10.2020
CZ14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
NL14.10.2020
PL14.10.2020
RS14.10.2020
SE14.10.2020
SM14.10.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/33]AT14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
NL14.10.2020
PL14.10.2020
RS14.10.2020
SE14.10.2020
SM14.10.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/32]AT14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
LV14.10.2020
NL14.10.2020
PL14.10.2020
RS14.10.2020
SE14.10.2020
SM14.10.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/28]AT14.10.2020
ES14.10.2020
FI14.10.2020
HR14.10.2020
LV14.10.2020
NL14.10.2020
PL14.10.2020
RS14.10.2020
SE14.10.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/25]AT14.10.2020
ES14.10.2020
FI14.10.2020
LV14.10.2020
NL14.10.2020
PL14.10.2020
RS14.10.2020
SE14.10.2020
BG14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/24]AT14.10.2020
FI14.10.2020
LV14.10.2020
NL14.10.2020
RS14.10.2020
SE14.10.2020
BG14.01.2021
GR15.01.2021
PT15.02.2021
Former [2021/23]FI14.10.2020
LV14.10.2020
NL14.10.2020
RS14.10.2020
SE14.10.2020
GR15.01.2021
PT15.02.2021
Former [2021/22]FI14.10.2020
NL14.10.2020
RS14.10.2020
PT15.02.2021
Former [2021/21]FI14.10.2020
NL14.10.2020
PT15.02.2021
Former [2021/20]FI14.10.2020
Cited inInternational search[Y]WO2004001455  (WMC RESOURCES LTD [AU], et al) [Y] 1-22 * abstract *;
 [Y]US5918194  (BANASKA JOHN [US], et al) [Y] 1-22 * column 6, lines 20-56 * * column 9, lines 18-33 * * figures 1-2 *
ExaminationWO9601411
 US5335186
 US3704444
by applicantUS8026723
 US7773457
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.