blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2662951

EP2662951 - Stator lamination stack alignment and retention [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  24.09.2021
Database last updated on 23.04.2024
FormerThe patent has been granted
Status updated on  16.10.2020
FormerGrant of patent is intended
Status updated on  25.06.2020
FormerExamination is in progress
Status updated on  25.03.2019
FormerRequest for examination was made
Status updated on  16.03.2018
Most recent event   Tooltip23.06.2023Lapse of the patent in a contracting state
New state(s): CY
published on 26.07.2023  [2023/30]
Applicant(s)For all designated states
Deere & Company
One John Deere Place
Moline, IL 61265 / US
[2020/47]
Former [2013/46]For all designated states
DEERE & COMPANY
One John Deere Place
Moline, Illinois 61265-8098 / US
Inventor(s)01 / McKinzie, Kyle K
10087 Meade Road
Altamont, KS 67330 / US
02 / Love, Galen R
3860 CR 5700
Cherryvale, KS 67335 / US
 [2013/46]
Representative(s)Holst, Sönke
John Deere GmbH & Co. KG
Mannheim Regional Center
Global Intellectual Property Services
John-Deere-Strasse 70
68163 Mannheim / DE
[2013/46]
Application number, filing date13163451.112.04.2013
[2013/46]
Priority number, dateUS20121346627308.05.2012         Original published format: US201213466273
[2013/46]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2662951
Date:13.11.2013
Language:EN
[2013/46]
Type: A3 Search report 
No.:EP2662951
Date:13.09.2017
Language:EN
[2017/37]
Type: B1 Patent specification 
No.:EP2662951
Date:18.11.2020
Language:EN
[2020/47]
Search report(s)(Supplementary) European search report - dispatched on:EP10.08.2017
ClassificationIPC:H02K1/18
[2013/46]
CPC:
H02K1/185 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/16]
Former [2013/46]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Ausrichtung und Rückhaltung eines Statorblechpakets[2013/46]
English:Stator lamination stack alignment and retention[2013/46]
French:Alignement et rétention d'un paquet de tôles statoriques[2013/46]
Examination procedure12.04.2013Date on which the examining division has become responsible
07.03.2018Amendment by applicant (claims and/or description)
13.03.2018Examination requested  [2018/16]
28.03.2019Despatch of a communication from the examining division (Time limit: M04)
31.05.2019Reply to a communication from the examining division
05.09.2019Despatch of a communication from the examining division (Time limit: M04)
23.10.2019Reply to a communication from the examining division
05.02.2020Despatch of a communication from the examining division (Time limit: M04)
25.02.2020Reply to a communication from the examining division
26.06.2020Communication of intention to grant the patent
05.10.2020Fee for grant paid
05.10.2020Fee for publishing/printing paid
05.10.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  28.03.2019
Opposition(s)19.08.2021No opposition filed within time limit [2021/43]
Fees paidRenewal fee
27.04.2015Renewal fee patent year 03
27.04.2016Renewal fee patent year 04
17.03.2017Renewal fee patent year 05
19.03.2018Renewal fee patent year 06
18.03.2019Renewal fee patent year 07
17.03.2020Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.04.2013
AL18.11.2020
AT18.11.2020
CY18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
NL18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
GB12.04.2021
IE12.04.2021
LU12.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
[2023/30]
Former [2023/29]HU12.04.2013
AL18.11.2020
AT18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
NL18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
GB12.04.2021
IE12.04.2021
LU12.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/34]AL18.11.2020
AT18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
NL18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
GB12.04.2021
IE12.04.2021
LU12.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/23]AL18.11.2020
AT18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
NL18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
GB12.04.2021
IE12.04.2021
LU12.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/21]AL18.11.2020
AT18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
NL18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
PT18.03.2021
GB12.04.2021
IE12.04.2021
LU12.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/10]AL18.11.2020
AT18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
NL18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
PT18.03.2021
GB12.04.2021
LU12.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/09]AL18.11.2020
AT18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
NL18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
GB12.04.2021
LU12.04.2021
FR30.04.2021
Former [2022/04]AL18.11.2020
AT18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
NL18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
LU12.04.2021
Former [2021/51]AL18.11.2020
AT18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
NL18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/50]AL18.11.2020
AT18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
NL18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/49]AL18.11.2020
AT18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
NL18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/48]AL18.11.2020
AT18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
NL18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/46]AL18.11.2020
AT18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
FI18.11.2020
HR18.11.2020
LT18.11.2020
LV18.11.2020
NL18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/45]AL18.11.2020
AT18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
FI18.11.2020
HR18.11.2020
LT18.11.2020
LV18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/37]AT18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
FI18.11.2020
HR18.11.2020
LT18.11.2020
LV18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/36]AT18.11.2020
CZ18.11.2020
EE18.11.2020
FI18.11.2020
HR18.11.2020
LT18.11.2020
LV18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/35]AT18.11.2020
CZ18.11.2020
FI18.11.2020
HR18.11.2020
LT18.11.2020
LV18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/34]AT18.11.2020
CZ18.11.2020
FI18.11.2020
HR18.11.2020
LT18.11.2020
LV18.11.2020
PL18.11.2020
RS18.11.2020
SE18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/33]AT18.11.2020
FI18.11.2020
HR18.11.2020
LT18.11.2020
LV18.11.2020
PL18.11.2020
RS18.11.2020
SE18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/32]AT18.11.2020
FI18.11.2020
HR18.11.2020
LV18.11.2020
PL18.11.2020
RS18.11.2020
SE18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/28]AT18.11.2020
FI18.11.2020
HR18.11.2020
LV18.11.2020
PL18.11.2020
RS18.11.2020
SE18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/25]AT18.11.2020
FI18.11.2020
LV18.11.2020
PL18.11.2020
RS18.11.2020
SE18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/24]AT18.11.2020
FI18.11.2020
LV18.11.2020
RS18.11.2020
SE18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
PT18.03.2021
Former [2021/23]FI18.11.2020
LV18.11.2020
RS18.11.2020
SE18.11.2020
NO18.02.2021
GR19.02.2021
PT18.03.2021
Former [2021/22]FI18.11.2020
RS18.11.2020
NO18.02.2021
PT18.03.2021
Former [2021/21]FI18.11.2020
PT18.03.2021
Former [2021/20]FI18.11.2020
Documents cited:Search[XI]US7982356  (BUBAN TOBIAS [DE]) [X] 1,2,4,8-12,14 * abstract * * column 3, line 10 - column 5, line 37; figures 1-3,7 * [I] 3,5-7,13,15;
 [XAI]JPS6020736  (HITACHI LTD) [X] 1,2,4,9-12,14 * abstract * * DETAILED DESCRITPION OF THE PREFERRED EMBODIMENTS;; figures 3,4 * [A] 8 [I] 3,5-7,13,15;
 [XAI]DE10257889  (MINEBEA CO LTD [JP]) [X] 1,2,4,9-12,14 * abstract * * paragraph [0027] - paragraph [0035]; figures 1,3,5 * [A] 8 [I] 3,5-7,13,15
ExaminationUS2010156235
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.