blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2817518

EP2817518 - SOUND-PROOFING HOUSING FOR A RESPIRATOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  26.03.2021
Database last updated on 23.04.2024
FormerThe patent has been granted
Status updated on  17.04.2020
FormerGrant of patent is intended
Status updated on  27.02.2020
Most recent event   Tooltip23.06.2023Lapse of the patent in a contracting state
New state(s): CY
published on 26.07.2023  [2023/30]
Applicant(s)For all designated states
imtmedical ag
Gewerbestrasse 8
9470 Buchs / CH
[2019/34]
Former [2015/01]For all designated states
IASSET AG
Gewerbestrasse 8
9470 Buchs / CH
Inventor(s)01 / FRIBERG, Harri
Fürst-Franz-Josef-Strasse 33
CH-9493 Mauren / LI
02 / DAESCHER, Jakob
Dunkle Böngert 13
CH-7306 Fläsch / CH
 [2015/01]
Representative(s)PPR AG
BGZ
9497 Triesenberg / LI
[N/P]
Former [2015/01]Patentbüro Paul Rosenich AG
BGZ
9497 Triesenberg / LI
Application number, filing date13712357.604.02.2013
[2020/21]
WO2013IB50930
Priority number, dateUS201261594345P02.02.2012         Original published format: US 201261594345 P
EP2012015364502.02.2012         Original published format: EP 12153645
[2015/01]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013114345
Date:08.08.2013
Language:EN
[2013/32]
Type: A1 Application with search report 
No.:EP2817518
Date:31.12.2014
Language:EN
The application published by WIPO in one of the EPO official languages on 08.08.2013 takes the place of the publication of the European patent application.
[2015/01]
Type: B1 Patent specification 
No.:EP2817518
Date:20.05.2020
Language:EN
[2020/21]
Search report(s)International search report - published on:EP08.08.2013
ClassificationIPC:F04D29/40
[2015/01]
CPC:
F04D29/403 (EP,US); A61M16/0066 (US); A61M2205/42 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/01]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:SCHALLDÄMMENDES GEHÄUSE FÜR EIN BEATMUNGSGERÄT[2020/11]
English:SOUND-PROOFING HOUSING FOR A RESPIRATOR[2015/01]
French:BOÎTIER ISOLANT POUR UN APPAREIL RESPIRATOIRE[2020/11]
Former [2015/01]SCHALLDÄMPFENDES GEHÄUSE FÜR EIN ATEMGERÄT
Former [2015/01]BOÎTIER INSONORISANT POUR UN RESPIRATEUR
Entry into regional phase02.09.2014National basic fee paid 
02.09.2014Designation fee(s) paid 
02.09.2014Examination fee paid 
Examination procedure19.08.2014Amendment by applicant (claims and/or description)
02.09.2014Examination requested  [2015/01]
28.02.2020Communication of intention to grant the patent
08.04.2020Fee for grant paid
08.04.2020Fee for publishing/printing paid
08.04.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  28.02.2020
Opposition(s)23.02.2021No opposition filed within time limit [2021/17]
Fees paidRenewal fee
02.03.2015Renewal fee patent year 03
29.02.2016Renewal fee patent year 04
28.02.2017Renewal fee patent year 05
28.02.2018Renewal fee patent year 06
20.02.2019Renewal fee patent year 07
20.02.2020Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.02.2013
AL20.05.2020
AT20.05.2020
CY20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
IE04.02.2021
LU04.02.2021
[2023/30]
Former [2023/27]HU04.02.2013
AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
IE04.02.2021
LU04.02.2021
Former [2022/07]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
IE04.02.2021
LU04.02.2021
Former [2021/47]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
LU04.02.2021
Former [2021/41]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/24]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/10]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/09]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/08]AL20.05.2020
DK20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/04]AL20.05.2020
FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
RS20.05.2020
SE20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/01]FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
RS20.05.2020
SE20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/51]FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
RS20.05.2020
SE20.05.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/50]FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
SE20.05.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/48]FI20.05.2020
LT20.05.2020
SE20.05.2020
NO20.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/47]LT20.05.2020
NO20.08.2020
IS20.09.2020
Former [2020/46]IS20.09.2020
Cited inInternational search[A]EP0669141  (ADAHAN CARMELI [IL]) [A] 1* abstract *;
 [IA]WO2009067583  (AVON PROTECTION SYSTEMS INC [US], et al) [I] 1-13,15-29,31 * paragraphs [0034] - [0038] - [0050]; figures 1,2,8 * [A] 14,30;
 [A]WO2011017763  (RESMED MOTOR TECHNOLOGIES INC [US], et al) [A] 1 * abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.