EP2844482 - METHOD FOR ALIGNING AT LEAST TWO CYLINDERS IN A PARALLEL MANNER RELATIVE TO EACH OTHER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.03.2017 Database last updated on 13.12.2019 | Most recent event Tooltip | 15.11.2019 | Lapse of the patent in a contracting state New state(s): MK | published on 18.12.2019 [2019/51] | Applicant(s) | For all designated states Windmöller & Hölscher KG Münsterstrasse 50 49525 Lengerich/Westf. / DE | [2015/11] | Inventor(s) | 01 /
KOBUSCH, Udo Stirper Straße 28 49163 Bohmte / DE | 02 /
EHRENBERG, Rainer Ginsterweg 2A 49205 Hasbergen / DE | 03 /
HÖWELMEYER, Uwe Keplerstraße 28 49477 Ibbenbüren / DE | 04 /
WESTHOF, Frank Mettinger Straße 16 49509 Recke / DE | 05 /
KRÜMPELMANN, Martin Eduard-Lagemann-Straße 22 49525 Lengerich / DE | 06 /
GUNSCHERA, Frank Im Erlengrund 16 49078 Osnabrück / DE | [2015/11] | Representative(s) | (deleted) ... | [2016/20] |
Former [2015/11] | Vogel, Andreas
, et al
Bals & Vogel Universitätsstrasse 142 44799 Bochum / DE | Application number, filing date | 13712530.8 | 22.03.2013 | [2016/20] | WO2013EP56132 | Priority number, date | DE201210103853 | 02.05.2012 Original published format: DE102012103853 | [2015/11] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2013164132 | Date: | 07.11.2013 | Language: | DE | [2013/45] | Type: | A1 Application with search report | No.: | EP2844482 | Date: | 11.03.2015 | Language: | DE | The application has been published by WIPO in one of the EPO official languages on 07.11.2013 | [2015/11] | Type: | B1 Patent specification | No.: | EP2844482 | Date: | 18.05.2016 | Language: | DE | [2016/20] | Search report(s) | International search report - published on: | EP | 07.11.2013 | Classification | International: | B41F31/30, B41F31/32, B41F13/30, B41F13/38, B41F30/00, B23P19/04, B23P19/10 | [2015/43] |
Former International [2015/11] | B41F31/30, B41F31/32, B41F13/30, B41F13/38, B41F30/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/11] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN FÜR DIE PARALLELE AUSRICHTUNG VON WENIGSTENS ZWEI ZYLINDERN ZUEINANDER | [2015/11] | English: | METHOD FOR ALIGNING AT LEAST TWO CYLINDERS IN A PARALLEL MANNER RELATIVE TO EACH OTHER | [2015/11] | French: | PROCÉDÉ PERMETTANT D'ALIGNER AU MOINS DEUX CYLINDRES PARALLÈLEMENT L'UN À L'AUTRE | [2015/11] | Entry into regional phase | 02.12.2014 | National basic fee paid | 02.12.2014 | Designation fee(s) paid | 02.12.2014 | Examination fee paid | Examination procedure | 02.01.2014 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 02.12.2014 | Examination requested [2015/11] | 19.10.2015 | Communication of intention to grant the patent | 25.11.2015 | Communication of intention to grant the patent | 03.03.2016 | Fee for grant paid | 03.03.2016 | Fee for publishing/printing paid | 03.03.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.10.2015 | Opposition(s) | 21.02.2017 | No opposition filed within time limit [2017/17] | Fees paid | Renewal fee | 31.03.2015 | Renewal fee patent year 03 | 24.03.2016 | Renewal fee patent year 04 | Lapses during opposition Tooltip | HU | 22.03.2013 | AL | 18.05.2016 | BG | 18.05.2016 | CY | 18.05.2016 | CZ | 18.05.2016 | DK | 18.05.2016 | EE | 18.05.2016 | FI | 18.05.2016 | HR | 18.05.2016 | LT | 18.05.2016 | LV | 18.05.2016 | MC | 18.05.2016 | MK | 18.05.2016 | MT | 18.05.2016 | NL | 18.05.2016 | PL | 18.05.2016 | RO | 18.05.2016 | RS | 18.05.2016 | SE | 18.05.2016 | SI | 18.05.2016 | SK | 18.05.2016 | SM | 18.05.2016 | NO | 18.08.2016 | GR | 19.08.2016 | PT | 19.09.2016 | [2019/51] |
Former [2019/47] | HU | 22.03.2013 | |
AL | 18.05.2016 | ||
BG | 18.05.2016 | ||
CY | 18.05.2016 | ||
CZ | 18.05.2016 | ||
DK | 18.05.2016 | ||
EE | 18.05.2016 | ||
FI | 18.05.2016 | ||
HR | 18.05.2016 | ||
LT | 18.05.2016 | ||
LV | 18.05.2016 | ||
MC | 18.05.2016 | ||
MT | 18.05.2016 | ||
NL | 18.05.2016 | ||
PL | 18.05.2016 | ||
RO | 18.05.2016 | ||
RS | 18.05.2016 | ||
SE | 18.05.2016 | ||
SI | 18.05.2016 | ||
SK | 18.05.2016 | ||
SM | 18.05.2016 | ||
NO | 18.08.2016 | ||
GR | 19.08.2016 | ||
PT | 19.09.2016 | ||
Former [2019/39] | HU | 22.03.2013 | |
AL | 18.05.2016 | ||
BG | 18.05.2016 | ||
CZ | 18.05.2016 | ||
DK | 18.05.2016 | ||
EE | 18.05.2016 | ||
FI | 18.05.2016 | ||
HR | 18.05.2016 | ||
LT | 18.05.2016 | ||
LV | 18.05.2016 | ||
MC | 18.05.2016 | ||
MT | 18.05.2016 | ||
NL | 18.05.2016 | ||
PL | 18.05.2016 | ||
RO | 18.05.2016 | ||
RS | 18.05.2016 | ||
SE | 18.05.2016 | ||
SI | 18.05.2016 | ||
SK | 18.05.2016 | ||
SM | 18.05.2016 | ||
NO | 18.08.2016 | ||
GR | 19.08.2016 | ||
PT | 19.09.2016 | ||
Former [2019/31] | HU | 22.03.2013 | |
AL | 18.05.2016 | ||
CZ | 18.05.2016 | ||
DK | 18.05.2016 | ||
EE | 18.05.2016 | ||
FI | 18.05.2016 | ||
HR | 18.05.2016 | ||
LT | 18.05.2016 | ||
LV | 18.05.2016 | ||
MC | 18.05.2016 | ||
MT | 18.05.2016 | ||
NL | 18.05.2016 | ||
PL | 18.05.2016 | ||
RO | 18.05.2016 | ||
RS | 18.05.2016 | ||
SE | 18.05.2016 | ||
SI | 18.05.2016 | ||
SK | 18.05.2016 | ||
SM | 18.05.2016 | ||
NO | 18.08.2016 | ||
GR | 19.08.2016 | ||
PT | 19.09.2016 | ||
Former [2018/46] | AL | 18.05.2016 | |
CZ | 18.05.2016 | ||
DK | 18.05.2016 | ||
EE | 18.05.2016 | ||
FI | 18.05.2016 | ||
HR | 18.05.2016 | ||
LT | 18.05.2016 | ||
LV | 18.05.2016 | ||
MC | 18.05.2016 | ||
MT | 18.05.2016 | ||
NL | 18.05.2016 | ||
PL | 18.05.2016 | ||
RO | 18.05.2016 | ||
RS | 18.05.2016 | ||
SE | 18.05.2016 | ||
SI | 18.05.2016 | ||
SK | 18.05.2016 | ||
SM | 18.05.2016 | ||
NO | 18.08.2016 | ||
GR | 19.08.2016 | ||
PT | 19.09.2016 | ||
Former [2018/43] | CZ | 18.05.2016 | |
DK | 18.05.2016 | ||
EE | 18.05.2016 | ||
FI | 18.05.2016 | ||
HR | 18.05.2016 | ||
LT | 18.05.2016 | ||
LV | 18.05.2016 | ||
MC | 18.05.2016 | ||
MT | 18.05.2016 | ||
NL | 18.05.2016 | ||
PL | 18.05.2016 | ||
RO | 18.05.2016 | ||
RS | 18.05.2016 | ||
SE | 18.05.2016 | ||
SI | 18.05.2016 | ||
SK | 18.05.2016 | ||
SM | 18.05.2016 | ||
NO | 18.08.2016 | ||
GR | 19.08.2016 | ||
PT | 19.09.2016 | ||
Former [2018/01] | CZ | 18.05.2016 | |
DK | 18.05.2016 | ||
EE | 18.05.2016 | ||
FI | 18.05.2016 | ||
HR | 18.05.2016 | ||
LT | 18.05.2016 | ||
LV | 18.05.2016 | ||
MC | 18.05.2016 | ||
NL | 18.05.2016 | ||
PL | 18.05.2016 | ||
RO | 18.05.2016 | ||
RS | 18.05.2016 | ||
SE | 18.05.2016 | ||
SI | 18.05.2016 | ||
SK | 18.05.2016 | ||
SM | 18.05.2016 | ||
NO | 18.08.2016 | ||
GR | 19.08.2016 | ||
PT | 19.09.2016 | ||
Former [2017/37] | CZ | 18.05.2016 | |
DK | 18.05.2016 | ||
EE | 18.05.2016 | ||
FI | 18.05.2016 | ||
HR | 18.05.2016 | ||
LT | 18.05.2016 | ||
LV | 18.05.2016 | ||
NL | 18.05.2016 | ||
PL | 18.05.2016 | ||
RO | 18.05.2016 | ||
RS | 18.05.2016 | ||
SE | 18.05.2016 | ||
SI | 18.05.2016 | ||
SK | 18.05.2016 | ||
SM | 18.05.2016 | ||
NO | 18.08.2016 | ||
GR | 19.08.2016 | ||
PT | 19.09.2016 | ||
Former [2017/11] | CZ | 18.05.2016 | |
DK | 18.05.2016 | ||
EE | 18.05.2016 | ||
FI | 18.05.2016 | ||
HR | 18.05.2016 | ||
LT | 18.05.2016 | ||
LV | 18.05.2016 | ||
NL | 18.05.2016 | ||
PL | 18.05.2016 | ||
RO | 18.05.2016 | ||
RS | 18.05.2016 | ||
SE | 18.05.2016 | ||
SK | 18.05.2016 | ||
SM | 18.05.2016 | ||
NO | 18.08.2016 | ||
GR | 19.08.2016 | ||
PT | 19.09.2016 | ||
Former [2017/10] | CZ | 18.05.2016 | |
DK | 18.05.2016 | ||
EE | 18.05.2016 | ||
FI | 18.05.2016 | ||
HR | 18.05.2016 | ||
LT | 18.05.2016 | ||
LV | 18.05.2016 | ||
NL | 18.05.2016 | ||
PL | 18.05.2016 | ||
RO | 18.05.2016 | ||
RS | 18.05.2016 | ||
SE | 18.05.2016 | ||
SK | 18.05.2016 | ||
NO | 18.08.2016 | ||
GR | 19.08.2016 | ||
PT | 19.09.2016 | ||
Former [2017/09] | CZ | 18.05.2016 | |
DK | 18.05.2016 | ||
EE | 18.05.2016 | ||
FI | 18.05.2016 | ||
HR | 18.05.2016 | ||
LT | 18.05.2016 | ||
LV | 18.05.2016 | ||
NL | 18.05.2016 | ||
RO | 18.05.2016 | ||
RS | 18.05.2016 | ||
SE | 18.05.2016 | ||
NO | 18.08.2016 | ||
GR | 19.08.2016 | ||
PT | 19.09.2016 | ||
Former [2017/07] | DK | 18.05.2016 | |
FI | 18.05.2016 | ||
HR | 18.05.2016 | ||
LT | 18.05.2016 | ||
LV | 18.05.2016 | ||
NL | 18.05.2016 | ||
RS | 18.05.2016 | ||
SE | 18.05.2016 | ||
NO | 18.08.2016 | ||
GR | 19.08.2016 | ||
PT | 19.09.2016 | ||
Former [2016/52] | FI | 18.05.2016 | |
HR | 18.05.2016 | ||
LT | 18.05.2016 | ||
LV | 18.05.2016 | ||
NL | 18.05.2016 | ||
RS | 18.05.2016 | ||
SE | 18.05.2016 | ||
NO | 18.08.2016 | ||
GR | 19.08.2016 | ||
PT | 19.09.2016 | ||
Former [2016/51] | FI | 18.05.2016 | |
HR | 18.05.2016 | ||
LT | 18.05.2016 | ||
LV | 18.05.2016 | ||
NL | 18.05.2016 | ||
RS | 18.05.2016 | ||
NO | 18.08.2016 | ||
GR | 19.08.2016 | ||
PT | 19.09.2016 | ||
Former [2016/50] | FI | 18.05.2016 | |
HR | 18.05.2016 | ||
LT | 18.05.2016 | ||
LV | 18.05.2016 | ||
NL | 18.05.2016 | ||
RS | 18.05.2016 | ||
NO | 18.08.2016 | ||
Former [2016/49] | FI | 18.05.2016 | |
LT | 18.05.2016 | ||
NL | 18.05.2016 | ||
NO | 18.08.2016 | ||
Former [2016/46] | LT | 18.05.2016 | |
NO | 18.08.2016 | Cited in | International search | [XYI]WO2010142405 (WINDMOELLER & HOELSCHER [DE]; WESTHOF FRANK [DE]; HOEWELMEYER UWE [DE]) [X] 1,2,7,9,10 * abstract * * pages 1-7 * * figures 1-5 * [Y] 4,5,8 [I] 3,6,11-15; | [Y]EP2085223 (COMEXI SA [ES] COMEXI GROUP IND S A [ES]) [Y] 4,5,8 * abstract * * paragraphs [0011] , [0014] , [0018] - [0021] - [0037] - [0039] - [0044] * * figures 1-4b *; | [A]EP2100732 (BOBST BIELEFELD GMBH [DE]) [A] 3,11-15 * the whole document * |