EP2805768 - Method of producing fiber catalyst and a fiber catalyst [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.06.2024 Database last updated on 25.03.2025 | |
Former | The patent has been granted Status updated on 30.06.2023 | ||
Former | Grant of patent is intended Status updated on 23.02.2023 | ||
Former | Examination is in progress Status updated on 09.11.2016 | Most recent event Tooltip | 31.01.2025 | Lapse of the patent in a contracting state New state(s): IE | published on 05.03.2025 [2025/10] | Applicant(s) | For all designated states Gunitech Corp. No. 753 Wenshan Road Qionlin Township Hsinchu County 307 / TW | [2014/48] | Inventor(s) | 01 /
KAO, Hsin-Yi No. 753, Wenshan Rd. County 307 Qionlin Township Hsinchu / TW | 02 /
CHENG, Tsai-Hsin No. 753, Wenshan Rd. County 307 Qionlin Township Hsinchu / TW | 03 /
CHOU, Po-Kuei No. 753, Wenshan Rd. County 307 Qionlin Township Hsinchu / TW | 04 /
LIN, Ssu-Tai No. 753, Wenshan Rd. County 307 Qionlin Township Hsinchu / TW | [2014/48] | Representative(s) | Dogio Patents B.V. P.O. Box 2350 1200 CJ Hilversum / NL | [N/P] |
Former [2023/31] | van de Wal, Barend Willem DOGIO Patents B.V. P.O. Box 2350 1200 CJ Hilversum / NL | ||
Former [2014/48] | Altenburg, Bernardus Stephanus Franciscus Altenburg Patent Ravelijnstraat 125 4102 AJ Culemborg / NL | Application number, filing date | 14151608.8 | 17.01.2014 | [2014/48] | Priority number, date | TW20130118297 | 23.05.2013 Original published format: TW 102118297 | [2014/48] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2805768 | Date: | 26.11.2014 | Language: | EN | [2014/48] | Type: | B1 Patent specification | No.: | EP2805768 | Date: | 02.08.2023 | Language: | EN | [2023/31] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 27.06.2014 | Classification | IPC: | B01J37/03, B01J37/32, B01J23/38, B01J23/75, B01J35/06, B01J37/00, D01F9/04, H01M8/00 | [2014/48] | CPC: |
B01J23/40 (EP,US);
B01J31/08 (US);
B01J23/48 (EP,US);
B01J23/56 (EP,US);
B01J35/58 (EP,US);
B01J37/036 (EP,US);
B01J37/32 (EP,US);
D01D5/06 (EP,US);
D01F1/10 (EP,US);
D01F11/00 (EP,US);
H01M4/8605 (EP,US);
H01M4/8663 (EP,US);
H01M4/8814 (EP,US);
H01M4/8825 (EP,US);
H01M4/8875 (EP,US);
H01M4/9041 (EP,US);
H01M4/92 (EP,US);
D01F9/04 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/21] |
Former [2014/48] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Verfahren zur Herstellung eines Faserkatalysators und ein Faserkatalysator | [2014/48] | English: | Method of producing fiber catalyst and a fiber catalyst | [2014/48] | French: | Procédé de production de catalyseur de fibre et catalyseur de fibre | [2014/48] | Examination procedure | 11.04.2015 | Amendment by applicant (claims and/or description) | 11.04.2015 | Examination requested [2015/21] | 28.10.2016 | Despatch of a communication from the examining division (Time limit: M04) | 24.02.2017 | Reply to a communication from the examining division | 09.10.2017 | Invitation to indicate the basis for amendments (Time limit: M01) | 06.11.2017 | Reply to an invitation to indicate the basis for amendments | 09.10.2018 | Despatch of a communication from the examining division (Time limit: M06) | 08.04.2019 | Reply to a communication from the examining division | 19.03.2020 | Despatch of a communication from the examining division (Time limit: M06) | 29.09.2020 | Reply to a communication from the examining division | 24.02.2023 | Communication of intention to grant the patent | 26.06.2023 | Fee for grant paid | 26.06.2023 | Fee for publishing/printing paid | 26.06.2023 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.10.2016 | Opposition(s) | 03.05.2024 | No opposition filed within time limit [2024/28] | Fees paid | Renewal fee | 01.02.2016 | Renewal fee patent year 03 | 26.01.2017 | Renewal fee patent year 04 | 25.01.2018 | Renewal fee patent year 05 | 28.01.2019 | Renewal fee patent year 06 | 20.01.2020 | Renewal fee patent year 07 | 26.01.2021 | Renewal fee patent year 08 | 27.01.2022 | Renewal fee patent year 09 | 03.05.2023 | Renewal fee patent year 10 | Penalty fee | Additional fee for renewal fee | 31.01.2023 | 10   M06   Fee paid on   03.05.2023 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 02.08.2023 | BG | 02.08.2023 | CZ | 02.08.2023 | DK | 02.08.2023 | EE | 02.08.2023 | ES | 02.08.2023 | FI | 02.08.2023 | HR | 02.08.2023 | IT | 02.08.2023 | LT | 02.08.2023 | LV | 02.08.2023 | MC | 02.08.2023 | NL | 02.08.2023 | PL | 02.08.2023 | RO | 02.08.2023 | RS | 02.08.2023 | SE | 02.08.2023 | SI | 02.08.2023 | SK | 02.08.2023 | SM | 02.08.2023 | NO | 02.11.2023 | GR | 03.11.2023 | IS | 02.12.2023 | PT | 04.12.2023 | IE | 17.01.2024 | LU | 17.01.2024 | BE | 31.01.2024 | CH | 31.01.2024 | [2025/10] |
Former [2024/51] | AT | 02.08.2023 | |
BG | 02.08.2023 | ||
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
ES | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
IT | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
MC | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SI | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
LU | 17.01.2024 | ||
BE | 31.01.2024 | ||
CH | 31.01.2024 | ||
Former [2024/48] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
ES | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
IT | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
MC | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SI | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
LU | 17.01.2024 | ||
BE | 31.01.2024 | ||
CH | 31.01.2024 | ||
Former [2024/47] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
ES | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
IT | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
MC | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SI | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
LU | 17.01.2024 | ||
BE | 31.01.2024 | ||
Former [2024/43] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
ES | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
IT | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
MC | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SI | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
LU | 17.01.2024 | ||
Former [2024/40] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
ES | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
IT | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
MC | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SI | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/36] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
ES | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
IT | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SI | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/26] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
ES | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
IT | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/23] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
ES | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/22] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/20] | AT | 02.08.2023 | |
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/10] | AT | 02.08.2023 | |
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/09] | AT | 02.08.2023 | |
FI | 02.08.2023 | ||
LT | 02.08.2023 | ||
NL | 02.08.2023 | ||
SE | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
Former [2024/08] | LT | 02.08.2023 | |
NL | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | Documents cited: | Search | [XI]US4744830 (KOBAYASHI YOSHINARI [JP], et al); | [A]US5197945 (COLE SUSAN M [US], et al); | [X]WO2012058425 (UNIV VANDERBILT [US], et al); | [X]WO2012074160 (KWANGJU INST SCI & TECH [KR], et al); |