EP2853695 - System and method for conformal cleaning of a turbine blade [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.03.2024 Database last updated on 09.12.2024 | |
Former | The patent has been granted Status updated on 24.03.2023 | ||
Former | Grant of patent is intended Status updated on 26.01.2023 | ||
Former | Examination is in progress Status updated on 27.07.2018 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states General Electric Technology GmbH Brown Boveri Strasse 8 5400 Baden / CH | [2023/50] |
Former [2023/17] | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | ||
Former [2015/14] | For all designated states General Electric Company 1 River Road Schenectady, New York 12345 / US | Inventor(s) | 01 /
Lomas, Jonathan Matthew 300 Garlington Road Greenville, SC 29615 / US | 02 /
Simpson, Michelle Fullerton 10 Ramsford Lane Simpsonville, SC 29681 / US | [2023/17] |
Former [2015/14] | 01 /
Lomas, Jonathan Matthew 300 Garlington Road Greenville, SC South Carolina 29615 / US | ||
02 /
Simpson, Michelle Fullerton 10 Ramsford Lane Simpsonville, SC South Carolina 29681 / US | Representative(s) | Novagraaf Group Chemin de l'Echo 3 1213 Onex / CH | [2023/17] |
Former [2015/14] | Cleary, Fidelma, et al GPO Europe GE International Inc. The Ark 201 Talgarth Road Hammersmith London W6 8BJ / GB | Application number, filing date | 14185610.4 | 19.09.2014 | [2015/14] | Priority number, date | US201314040671 | 28.09.2013 Original published format: US201314040671 | [2015/14] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2853695 | Date: | 01.04.2015 | Language: | EN | [2015/14] | Type: | B1 Patent specification | No.: | EP2853695 | Date: | 26.04.2023 | Language: | EN | [2023/17] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.02.2015 | Classification | IPC: | F01D25/00 | [2015/14] | CPC: |
F01D25/002 (EP,US);
B08B3/02 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/46] |
Former [2015/14] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | System und Verfahren zum konformen Reinigen einer Turbinenschaufel | [2015/14] | English: | System and method for conformal cleaning of a turbine blade | [2015/14] | French: | Système et procédé de nettoyage conforme d'une aube de turbine | [2015/14] | Examination procedure | 30.09.2015 | Amendment by applicant (claims and/or description) | 01.10.2015 | Examination requested [2015/46] | 30.07.2018 | Despatch of a communication from the examining division (Time limit: M06) | 29.01.2019 | Reply to a communication from the examining division | 16.12.2020 | Invitation to indicate the basis for amendments (Time limit: M01) | 25.01.2021 | Reply to an invitation to indicate the basis for amendments | 27.01.2023 | Communication of intention to grant the patent | 13.03.2023 | Fee for grant paid | 13.03.2023 | Fee for publishing/printing paid | 13.03.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 29.01.2024 | No opposition filed within time limit [2024/14] | Fees paid | Renewal fee | 30.09.2016 | Renewal fee patent year 03 | 02.10.2017 | Renewal fee patent year 04 | 01.10.2018 | Renewal fee patent year 05 | 19.09.2019 | Renewal fee patent year 06 | 17.09.2020 | Renewal fee patent year 07 | 21.09.2021 | Renewal fee patent year 08 | 21.09.2022 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 26.04.2023 | BG | 26.04.2023 | CZ | 26.04.2023 | DK | 26.04.2023 | EE | 26.04.2023 | ES | 26.04.2023 | FI | 26.04.2023 | HR | 26.04.2023 | IT | 26.04.2023 | LT | 26.04.2023 | LV | 26.04.2023 | MC | 26.04.2023 | NL | 26.04.2023 | PL | 26.04.2023 | RO | 26.04.2023 | RS | 26.04.2023 | SE | 26.04.2023 | SI | 26.04.2023 | SK | 26.04.2023 | SM | 26.04.2023 | NO | 26.07.2023 | GR | 27.07.2023 | IS | 26.08.2023 | PT | 28.08.2023 | IE | 19.09.2023 | LU | 19.09.2023 | BE | 30.09.2023 | CH | 30.09.2023 | [2024/51] |
Former [2024/36] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
IT | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
MC | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
IE | 19.09.2023 | ||
LU | 19.09.2023 | ||
BE | 30.09.2023 | ||
CH | 30.09.2023 | ||
Former [2024/34] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
IT | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
MC | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
IE | 19.09.2023 | ||
LU | 19.09.2023 | ||
CH | 30.09.2023 | ||
Former [2024/33] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
IT | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
MC | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
IE | 19.09.2023 | ||
LU | 19.09.2023 | ||
Former [2024/28] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
IT | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
MC | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
LU | 19.09.2023 | ||
Former [2024/26] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
IT | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
LU | 19.09.2023 | ||
Former [2024/25] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
LU | 19.09.2023 | ||
Former [2024/24] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/10] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/08] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/03] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/01] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2023/51] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
HR | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2023/50] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2023/48] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
NL | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
PT | 28.08.2023 | ||
Former [2023/46] | ES | 26.04.2023 | |
NL | 26.04.2023 | ||
PT | 28.08.2023 | ||
Former [2023/43] | NL | 26.04.2023 | Documents cited: | Search | [Y]EP1043079 (MITUTOYO CORP [JP], et al) [Y] 15 * paragraph [0028] - paragraph [0030]; figures 1-3; claim 3 *; | [Y]US6551422 (O'CONNOR JOHN J [US]) [Y] 15* the whole document *; | [XY]DE10216285 (SCHWARZ ERNST MAFAC GMBH [DE]) [X] 1-15 * paragraph [0023] - paragraph [0037]; figures 1-3; claim 1 * [Y] 15; | [XY]EP1640077 (SCHWARZ ERNST MAFAC GMBH [DE]) [X] 1-14 * paragraph [0009] - paragraph [0011] * * paragraph [0025] - paragraph [0049]; figures 1-7; claims 1,20 * [Y] 15; | [XY]US2010132738 (KUMAR RAJ [IN], et al) [X] 1-12 * paragraph [0011] - paragraph [0021]; figure 2; claims 1,5,6,12-14 * [Y] 15 |