blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2873518

EP2873518 - Method for producing a reinforced fibre composite component [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.01.2021
Database last updated on 23.04.2024
FormerThe patent has been granted
Status updated on  31.01.2020
FormerGrant of patent is intended
Status updated on  25.11.2019
FormerExamination is in progress
Status updated on  05.03.2019
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): AL, MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Bayerische Motoren Werke Aktiengesellschaft
Petuelring 130
80809 München / DE
[2015/21]
Inventor(s)01 / Schnaufer, Thomas
Hungerbachstrasse 2a
82386 Oberhausen / DE
02 / Veihelmann, Bernd
Arnold-Böcklin-Weg 5b
84034 Landshut / DE
03 / Beil, Andreas
Knorrstraße 28
80807 München / DE
 [2015/21]
Application number, filing date14187989.007.10.2014
[2015/21]
Priority number, dateDE20131022033709.10.2013         Original published format: DE102013220337
[2015/21]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP2873518
Date:20.05.2015
Language:DE
[2015/21]
Type: B1 Patent specification 
No.:EP2873518
Date:04.03.2020
Language:DE
[2020/10]
Search report(s)(Supplementary) European search report - dispatched on:EP16.04.2015
ClassificationIPC:B29C70/86, B29C70/88, B29C70/02, B29C70/22, // B29L31/30
[2015/21]
CPC:
B29C70/865 (EP); B29C70/023 (EP); B29C70/222 (EP);
B29C70/887 (EP); B29L2031/3002 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/39]
Former [2015/21]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Verfahren zum Herstellen eines verstärkten Faserverbundbauteils[2015/21]
English:Method for producing a reinforced fibre composite component[2015/21]
French:Procédé de fabrication d'un composant en composite renforcé en fibres[2015/21]
Examination procedure12.08.2015Amendment by applicant (claims and/or description)
12.08.2015Examination requested  [2015/39]
08.03.2019Despatch of a communication from the examining division (Time limit: M04)
24.06.2019Reply to a communication from the examining division
26.11.2019Communication of intention to grant the patent
20.01.2020Fee for grant paid
20.01.2020Fee for publishing/printing paid
20.01.2020Receipt of the translation of the claim(s)
Opposition(s)07.12.2020No opposition filed within time limit [2021/06]
Fees paidRenewal fee
27.10.2016Renewal fee patent year 03
24.10.2017Renewal fee patent year 04
24.09.2018Renewal fee patent year 05
28.10.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.10.2014
AL04.03.2020
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MK04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
TR04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
AT07.10.2020
IE07.10.2020
LU07.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
[2022/31]
Former [2022/27]HU07.10.2014
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
TR04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
AT07.10.2020
IE07.10.2020
LU07.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
Former [2022/07]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
AT07.10.2020
IE07.10.2020
LU07.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
Former [2021/46]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
IE07.10.2020
LU07.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
Former [2021/37]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
LU07.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
Former [2021/36]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
LU07.10.2020
BE31.10.2020
Former [2021/31]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
LU07.10.2020
Former [2021/13]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/08]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/50]CZ04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/49]CZ04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/48]ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/47]ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
Former [2020/46]FI04.03.2020
HR04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
Former [2020/45]FI04.03.2020
HR04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
Former [2020/39]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
Former [2020/38]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
NO04.06.2020
GR05.06.2020
Former [2020/37]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
NO04.06.2020
Former [2020/35]FI04.03.2020
NO04.06.2020
Documents cited:Search[X]WO2006118448  (STORK SP AEROSPACE B V [NL], et al) [X] 1-3,5-7 * abstract * * page 2, line 30 - line 32 * * page 3, line 30 - page 5, line 7 * * figures 1, 2 *;
 [X]EP2525964  (MESSIER BUGATTI DOWTY [FR]) [X] 1,3,5-8 * paragraph [0001] * * paragraph [0020] - paragraph [0041] * * figures 3, 4, 6, 9, 10 *;
 [X]EP2613925  (MESSIER BUGATTI DOWTY [FR], et al) [X] 1-3,5-7 * paragraph [0014] - paragraph [0023] ** figures 1, 2, 7 *;
 [X]EP2636517  (BOEING CO [US]) [X] 1,3,4,6,7 * abstract * * paragraph [0012] - paragraph [0016] * * paragraph [0019] - paragraph [0021] * * figures 1, 2, 5 *
by applicantEP2465665
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.