EP2876891 - METHOD AND APPARATUS FOR MATCHING OF CORRESPONDING FRAMES IN MULTIMEDIA STREAMS [Right-click to bookmark this link] | |||
Former [2015/22] | Method and apparatus for matching of corresponding frames in multimedia streams | ||
[2018/09] | Status | No opposition filed within time limit Status updated on 31.05.2019 Database last updated on 25.03.2025 | |
Former | The patent has been granted Status updated on 22.06.2018 | ||
Former | Grant of patent is intended Status updated on 15.06.2018 | ||
Former | Examination is in progress Status updated on 29.05.2018 | ||
Former | Grant of patent is intended Status updated on 31.01.2018 | ||
Former | Examination is in progress Status updated on 27.01.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, HU, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states Thomson Licensing 1-5, rue Jeanne d'Arc 92130 Issy-les-Moulineaux / FR | [2018/30] |
Former [2015/22] | For all designated states Thomson Licensing 1-5 rue Jeanne d'Arc 92130 Issy-les-Moulineaux / FR | Inventor(s) | 01 /
ONNO, Stéphane 6, Allée Claude Debussy 35760 Saint-Grégoire / FR | 02 /
NEUMANN, Christoph 12, boulevard de Metz 35700 Rennes / FR | 03 /
DEFRANCE, Serge 46, Square Louis Boulanger 35700 Rennes / FR | [2018/30] |
Former [2015/22] | 01 /
Onno, Stéphane 6, Allée Claude Debussy 35760 Saint-Grégoire / FR | ||
02 /
Neumann, Christoph 12, boulevard de Metz 35700 Rennes / FR | |||
03 /
Defrance, Serge 46, Square Louis Boulanger 35700 Rennes / FR | Representative(s) | Vidon Brevets & Stratégie 16B, rue de Jouanet BP 90333 35703 Rennes Cedex 7 / FR | [N/P] |
Former [2018/30] | Huchet, Anne, et al TECHNICOLOR 1-5, rue Jeanne d'Arc 92130 Issy-les-Moulineaux / FR | ||
Former [2015/22] | Rossmanith, Manfred Deutsche Thomson OHG European Patent Operations Karl-Wiechert-Allee 74 30625 Hannover / DE | Application number, filing date | 14193072.7 | 13.11.2014 | [2015/22] | Priority number, date | EP20130306595 | 21.11.2013 Original published format: EP 13306595 | [2015/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2876891 | Date: | 27.05.2015 | Language: | EN | [2015/22] | Type: | B1 Patent specification | No.: | EP2876891 | Date: | 25.07.2018 | Language: | EN | [2018/30] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 09.04.2015 | Classification | IPC: | H04N21/43, H04N21/44, H04N21/81, H04N21/439, H04N21/2668 | [2018/07] | CPC: |
H04N21/2668 (EP,US);
H04N21/4302 (EP,US);
H04N21/43072 (EP,US);
H04N21/4394 (EP,US);
H04N21/44016 (EP,US);
H04N21/812 (EP,US);
H04N21/8358 (EP,US)
(-)
|
Former IPC [2015/22] | H04N21/81, H04N21/44, H04N21/43, H04N21/439 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/29] |
Former [2015/22] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Verfahren und Vorrichtung zur Anpassung der entsprechenden Rahmen in Multimediaströmen | [2018/28] | English: | METHOD AND APPARATUS FOR MATCHING OF CORRESPONDING FRAMES IN MULTIMEDIA STREAMS | [2018/09] | French: | Procédé et appareil pour la mise en correspondance de trames correspondantes dans des flux multimédias | [2018/28] |
Former [2015/22] | Verfahren und Vorrichtung zur Anpassung der entsprechenden Rahmen in Multimediaströmen | ||
Former [2015/22] | Method and apparatus for matching of corresponding frames in multimedia streams | ||
Former [2015/22] | Procédé et appareil pour la mise en correspondance de trames correspondantes dans des flux multimédias | Examination procedure | 09.06.2015 | Amendment by applicant (claims and/or description) | 09.06.2015 | Examination requested [2015/29] | 27.01.2017 | Despatch of a communication from the examining division (Time limit: M06) | 07.06.2017 | Reply to a communication from the examining division | 01.02.2018 | Communication of intention to grant the patent | 24.05.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 24.05.2018 | Fee for grant paid | 24.05.2018 | Fee for publishing/printing paid | 14.06.2018 | Information about intention to grant a patent | 14.06.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 26.04.2019 | No opposition filed within time limit [2019/27] | Fees paid | Renewal fee | 29.11.2016 | Renewal fee patent year 03 | 28.11.2017 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.11.2014 | AL | 25.07.2018 | AT | 25.07.2018 | CY | 25.07.2018 | CZ | 25.07.2018 | DK | 25.07.2018 | EE | 25.07.2018 | ES | 25.07.2018 | FI | 25.07.2018 | HR | 25.07.2018 | IT | 25.07.2018 | LT | 25.07.2018 | LV | 25.07.2018 | MC | 25.07.2018 | MK | 25.07.2018 | NL | 25.07.2018 | PL | 25.07.2018 | PT | 25.07.2018 | RO | 25.07.2018 | RS | 25.07.2018 | SE | 25.07.2018 | SI | 25.07.2018 | SK | 25.07.2018 | SM | 25.07.2018 | TR | 25.07.2018 | BG | 25.10.2018 | NO | 25.10.2018 | GR | 26.10.2018 | GB | 13.11.2018 | IE | 13.11.2018 | LU | 13.11.2018 | MT | 13.11.2018 | IS | 25.11.2018 | BE | 30.11.2018 | CH | 30.11.2018 | LI | 30.11.2018 | [2020/31] |
Former [2020/28] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
PT | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
TR | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
GB | 13.11.2018 | ||
IE | 13.11.2018 | ||
LU | 13.11.2018 | ||
MT | 13.11.2018 | ||
IS | 25.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2020/16] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
TR | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
GB | 13.11.2018 | ||
IE | 13.11.2018 | ||
LU | 13.11.2018 | ||
MT | 13.11.2018 | ||
IS | 25.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2020/08] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
GB | 13.11.2018 | ||
IE | 13.11.2018 | ||
LU | 13.11.2018 | ||
MT | 13.11.2018 | ||
IS | 25.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2020/03] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
GB | 13.11.2018 | ||
IE | 13.11.2018 | ||
LU | 13.11.2018 | ||
IS | 25.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2019/51] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IE | 13.11.2018 | ||
LU | 13.11.2018 | ||
IS | 25.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2019/48] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IE | 13.11.2018 | ||
LU | 13.11.2018 | ||
IS | 25.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2019/40] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
LU | 13.11.2018 | ||
IS | 25.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2019/37] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
LU | 13.11.2018 | ||
IS | 25.11.2018 | ||
Former [2019/34] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
LU | 13.11.2018 | ||
IS | 25.11.2018 | ||
Former [2019/33] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/26] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/23] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SK | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/22] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/21] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/12] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/11] | AT | 25.07.2018 | |
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/10] | AT | 25.07.2018 | |
FI | 25.07.2018 | ||
LT | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/08] | FI | 25.07.2018 | |
LT | 25.07.2018 | ||
NL | 25.07.2018 | ||
NO | 25.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/07] | LT | 25.07.2018 | |
NL | 25.07.2018 | ||
Former [2019/04] | NL | 25.07.2018 | Documents cited: | Search | [I]US2004189873 (KONIG RICHARD [CH], et al) [I] 1-15* paragraphs [0014] , [0067]; figures 1,5 *; | [I]EP2648418 (THOMSON LICENSING [FR]) [I] 1-15 * paragraphs [057.] , [0099]; figure 1 * | by applicant | EP2765781 | - "Shot-boundary detection: unraveled and resolved?", CIRCUITS AND SYSTEMS FOR VIDEO TECHNOLOGY, IEEE TRANSACTIONS, vol. 12, no. 2 |