EP2889279 - Machinable Zirconia [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.06.2023 Database last updated on 26.03.2025 | |
Former | The patent has been granted Status updated on 22.07.2022 | ||
Former | Grant of patent is intended Status updated on 20.04.2022 | ||
Former | Examination is in progress Status updated on 08.12.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Vatechacucera, Inc. 81, Jinbeol-ro, Jinjeop-eup Gyeoggi-do Namyangju-si / KR | [2022/17] |
Former [2015/27] | For all designated states Acucera Inc. 81, Jinbeol-ro, Jinjeop-eup Gyeoggi-do Namyangju-si / KR | Inventor(s) | 01 /
Kim, Dae-Joon B-803, Miseong APT. Yeouido-dong, Yeongdeungpo-gu Seoul / KR | 02 /
Kim, Sang Wook 101-1105, Donggu Haetsal APT. Junghwa 2-dong Jungnang-gu Seoul / KR | 03 /
Seo, Seung Won 105-1704, Hanhwa Ggumegreen APT. Bisan-dong Gyeongsu-daero 883beon-gil Dongan-gu, Gyeonggi-do Anyang-si / KR | 04 /
Jeong, Yong Hwan 511-2105, Buyeong APT. Donong-dong, Gyeonggi-do Namyangju-si / KR | [2015/27] | Representative(s) | ETL IP Patent- und Rechtsanwaltsgesellschaft mbH Clayallee 343 14169 Berlin / DE | [2022/34] |
Former [2015/27] | Wablat Lange Karthaus Anwaltssozietät Potsdamer Chaussee 48 14129 Berlin / DE | Application number, filing date | 14199959.9 | 23.12.2014 | [2015/27] | Priority number, date | KR20130166242 | 27.12.2013 Original published format: KR 20130166242 | [2015/27] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2889279 | Date: | 01.07.2015 | Language: | EN | [2015/27] | Type: | B1 Patent specification | No.: | EP2889279 | Date: | 24.08.2022 | Language: | EN | [2022/34] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 20.03.2015 | Classification | IPC: | C04B35/64, C04B35/626 | [2015/27] | CPC: |
C04B35/62695 (EP,US);
C01G25/02 (KR);
A61K6/818 (EP,US);
C04B35/486 (EP,US);
C04B35/49 (US);
C04B35/62655 (EP,US);
C04B35/64 (EP,US);
C04B35/6455 (EP,US);
C04B2235/3224 (EP,US);
C04B2235/3225 (EP,US);
C04B2235/3229 (EP,US);
C04B2235/3232 (EP,US);
C04B2235/3251 (EP,US);
C04B2235/3418 (EP,US);
C04B2235/5436 (EP,US);
C04B2235/5454 (EP,US);
C04B2235/608 (EP,US);
C04B2235/6567 (EP,US);
C04B2235/661 (EP,US);
C04B2235/765 (EP,US);
C04B2235/77 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/40] |
Former [2015/27] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Bearbeitbares Zirkonoxid | [2015/27] | English: | Machinable Zirconia | [2015/27] | French: | Zircone usinable | [2015/27] | Examination procedure | 23.12.2014 | Examination requested [2015/27] | 25.08.2015 | Amendment by applicant (claims and/or description) | 11.12.2017 | Despatch of a communication from the examining division (Time limit: M04) | 08.03.2018 | Reply to a communication from the examining division | 22.03.2018 | Despatch of a communication from the examining division (Time limit: M04) | 04.06.2018 | Reply to a communication from the examining division | 20.05.2019 | Despatch of a communication from the examining division (Time limit: M06) | 29.11.2019 | Reply to a communication from the examining division | 08.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 14.09.2020 | Reply to a communication from the examining division | 21.04.2022 | Communication of intention to grant the patent | 14.07.2022 | Fee for grant paid | 14.07.2022 | Fee for publishing/printing paid | 14.07.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 25.05.2023 | No opposition filed within time limit [2023/31] | Fees paid | Renewal fee | 20.10.2016 | Renewal fee patent year 03 | 13.10.2017 | Renewal fee patent year 04 | 24.10.2018 | Renewal fee patent year 05 | 30.12.2019 | Renewal fee patent year 06 | 14.12.2020 | Renewal fee patent year 07 | 26.11.2021 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.12.2014 | AL | 24.08.2022 | AT | 24.08.2022 | BG | 24.08.2022 | CY | 24.08.2022 | CZ | 24.08.2022 | DK | 24.08.2022 | EE | 24.08.2022 | ES | 24.08.2022 | FI | 24.08.2022 | HR | 24.08.2022 | IT | 24.08.2022 | LT | 24.08.2022 | LV | 24.08.2022 | MC | 24.08.2022 | MK | 24.08.2022 | MT | 24.08.2022 | NL | 24.08.2022 | PL | 24.08.2022 | RO | 24.08.2022 | RS | 24.08.2022 | SE | 24.08.2022 | SI | 24.08.2022 | SK | 24.08.2022 | SM | 24.08.2022 | NO | 24.11.2022 | GR | 25.11.2022 | IE | 23.12.2022 | LU | 23.12.2022 | IS | 24.12.2022 | PT | 26.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | LI | 31.12.2022 | [2024/41] |
Former [2024/34] | HU | 23.12.2014 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
BG | 24.08.2022 | ||
CY | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
IT | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
MK | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/29] | HU | 23.12.2014 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
CY | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
IT | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
MK | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/27] | HU | 23.12.2014 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
CY | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
IT | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MK | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/26] | HU | 23.12.2014 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
CY | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
IT | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/21] | HU | 23.12.2014 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
CY | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/18] | HU | 23.12.2014 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/49] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/48] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/47] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
LU | 23.12.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/38] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
LU | 23.12.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/37] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/29] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/23] | AT | 24.08.2022 | |
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/22] | AT | 24.08.2022 | |
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/21] | DK | 24.08.2022 | |
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/20] | ES | 24.08.2022 | |
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/12] | ES | 24.08.2022 | |
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/11] | ES | 24.08.2022 | |
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
PT | 26.12.2022 | ||
Former [2023/10] | ES | 24.08.2022 | |
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
PT | 26.12.2022 | ||
Former [2023/09] | ES | 24.08.2022 | |
FI | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
NO | 24.11.2022 | ||
PT | 26.12.2022 | ||
Former [2023/08] | ES | 24.08.2022 | |
FI | 24.08.2022 | ||
LT | 24.08.2022 | ||
NL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
NO | 24.11.2022 | Documents cited: | Search | [Y]KR100840777B ; | [Y]US6380113 (KIM DAE JOON [KR], et al) [Y] 1-8* examples 1-8; claim 1; table 1 *; | [Y]US2010012484 (CITTI OLIVIER [US], et al) [Y] 1-8 * Table 1; Abstract;; claims 1-15 *; | [Y]US7700508 (ZHU DONGMING [US], et al) [Y] 1-8 * examples 1-3; claim 1 *; | [Y] - DATABASE WPI, 0, Derwent World Patents Index, vol. 2009, no. 03, Database accession no. 2009-A65234, XP002737081 & KR100840777B B1 20080623 (ACUCERA INC) [Y] 1-8 * Abstract; Claim 2; figure 4; table 1, example 1 * |