EP3059347 - TRANSITION SLAB BETWEEN THE ABUTMENT AND THE DECK OF A BRIDGE WITH EXPANSION AND CONTRACTION JOINTS HAVING A LONG SERVICE LIFE, AND METHODS FOR ABSORBING THE EXPANSION AND CONTRACTION MOVEMENTS OF THE DECK OF A BRIDGE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.12.2018 Database last updated on 21.03.2025 | |
Former | The patent has been granted Status updated on 29.12.2017 | ||
Former | Grant of patent is intended Status updated on 23.08.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, HU, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states Ingeturarte, S.l. C/ Felipe Moratilla 5 1º Izda 28008 Madrid / ES | [2016/34] | Inventor(s) | 01 /
GARCÍA, Jorge Aparicio c/ Felipe Moratilla, 5 - 1º Izda E-28008 Madrid / ES | [2016/34] | Representative(s) | Espiell Volart, Eduardo Maria R. Volart Pons y Cia. S.L. Pau Claris, 77, 2.o, 1.a 08010 Barcelona / ES | [2016/34] | Application number, filing date | 14816347.0 | 13.10.2014 | [2016/34] | WO2014ES70747 | Priority number, date | ES20130000915 | 18.10.2013 Original published format: ES 201300915 | [2016/34] | Filing language | ES | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015055876 | Date: | 23.04.2015 | Language: | ES | [2015/16] | Type: | A1 Application with search report | No.: | EP3059347 | Date: | 24.08.2016 | Language: | EN | [2016/34] | Type: | B1 Patent specification | No.: | EP3059347 | Date: | 31.01.2018 | Language: | EN | [2018/05] | Search report(s) | International search report - published on: | EP | 23.04.2015 | Classification | IPC: | E01D19/06 | [2016/34] | CPC: |
E01D19/06 (EP,US);
E01D19/02 (US);
E01D19/067 (EP,US);
E01D2101/10 (US);
E01D2101/26 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/34] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ÜBERGANGSBRAMME ZWISCHEN DEM WIDERLAGER UND DEM DECK EINER BRÜCKE MIT KONTRAKTIONS- UND EXPANSIONSVERBINDUNGEN MIT LANGER LEBENSDAUER SOWIE VERFAHREN ZUR DÄMPFUNG DER KONTRAKTIONS- UND EXPANSIONSBEWEGUNGEN DES DECKS EINER BRÜCKE | [2016/34] | English: | TRANSITION SLAB BETWEEN THE ABUTMENT AND THE DECK OF A BRIDGE WITH EXPANSION AND CONTRACTION JOINTS HAVING A LONG SERVICE LIFE, AND METHODS FOR ABSORBING THE EXPANSION AND CONTRACTION MOVEMENTS OF THE DECK OF A BRIDGE | [2016/34] | French: | DALLE DE TRANSITION ENTRE LA CULÉE ET LE TABLIER D'UN PONT AVEC DES JOINTS D'EXPANSION ET DE CONTRACTION À LONGUE DURÉE DE VIE, ET PROCÉDÉS D'ABSORPTION DES MOUVEMENTS D'EXPANSION ET DE CONTRACTION DU TABLIER D'UN PONT | [2016/34] | Entry into regional phase | 29.04.2016 | Translation filed | 02.05.2016 | National basic fee paid | 02.05.2016 | Designation fee(s) paid | 02.05.2016 | Examination fee paid | Examination procedure | 02.05.2016 | Examination requested [2016/34] | 19.12.2016 | Amendment by applicant (claims and/or description) | 24.08.2017 | Communication of intention to grant the patent | 12.12.2017 | Receipt of the translation of the claim(s) | 13.12.2017 | Fee for grant paid | 13.12.2017 | Fee for publishing/printing paid | Opposition(s) | 02.11.2018 | No opposition filed within time limit [2019/02] | Fees paid | Renewal fee | 26.09.2016 | Renewal fee patent year 03 | 23.08.2017 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.10.2014 | AL | 31.01.2018 | AT | 31.01.2018 | CY | 31.01.2018 | CZ | 31.01.2018 | DK | 31.01.2018 | EE | 31.01.2018 | FI | 31.01.2018 | HR | 31.01.2018 | LT | 31.01.2018 | LV | 31.01.2018 | MC | 31.01.2018 | MK | 31.01.2018 | NL | 31.01.2018 | PL | 31.01.2018 | PT | 31.01.2018 | RO | 31.01.2018 | RS | 31.01.2018 | SI | 31.01.2018 | SK | 31.01.2018 | SM | 31.01.2018 | TR | 31.01.2018 | BG | 30.04.2018 | NO | 30.04.2018 | GR | 01.05.2018 | IS | 31.05.2018 | IE | 13.10.2018 | LU | 13.10.2018 | MT | 13.10.2018 | BE | 31.10.2018 | [2020/31] |
Former [2020/28] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
PT | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SI | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
TR | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
IE | 13.10.2018 | ||
LU | 13.10.2018 | ||
MT | 13.10.2018 | ||
BE | 31.10.2018 | ||
Former [2020/16] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SI | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
TR | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
IE | 13.10.2018 | ||
LU | 13.10.2018 | ||
MT | 13.10.2018 | ||
BE | 31.10.2018 | ||
Former [2020/08] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SI | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
IE | 13.10.2018 | ||
LU | 13.10.2018 | ||
MT | 13.10.2018 | ||
BE | 31.10.2018 | ||
Former [2019/48] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SI | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
IE | 13.10.2018 | ||
LU | 13.10.2018 | ||
BE | 31.10.2018 | ||
Former [2019/38] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SI | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
LU | 13.10.2018 | ||
BE | 31.10.2018 | ||
Former [2019/30] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SI | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
LU | 13.10.2018 | ||
Former [2019/28] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SI | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2019/13] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SI | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/52] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/51] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SK | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/50] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
EE | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SK | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/46] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RS | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/40] | AT | 31.01.2018 | |
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RS | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/39] | AT | 31.01.2018 | |
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RS | 31.01.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/37] | FI | 31.01.2018 | |
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
Former [2018/36] | FI | 31.01.2018 | |
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
NO | 30.04.2018 | ||
Former [2018/35] | FI | 31.01.2018 | |
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
NL | 31.01.2018 | ||
NO | 30.04.2018 | Cited in | International search | [A]AT414135B (RAUSCH PETER [AT]) [A] 1-8 * the whole document *; | [A]FR2717512 (CHAPUIS PHILIPPE [FR]) [A] 1-8 * the whole document *; | [AD]JP2006328867 (GAEART TK KK; GEOSTR CORP) [AD] 1-8 * the whole document *; | [AD]WO2009139536 (KOREA EXPRESSWAY CORP [KR]; PARK YOUNG HO [KR]; KIM SUNG HWAN [KR]; KI) [AD] 1-8 * the whole document * | by applicant | JP2006328867 |