EP3046151 - Method and apparatus of fabricating an interconnector assembly [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.02.2020 Database last updated on 11.11.2024 | |
Former | The patent has been granted Status updated on 01.03.2019 | ||
Former | Grant of patent is intended Status updated on 24.10.2018 | ||
Former | Examination is in progress Status updated on 23.02.2018 | ||
Former | Request for examination was made Status updated on 27.01.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Somont GmbH Im Brunnenfeld 8 79224 Umkirch / DE | [2016/29] | Inventor(s) | 01 /
Blaszczack, Wlodzimierz Alice Salomon Strasse 37a/14 79111 Freiburg / DE | 02 /
Hoes, Thorsten Lilienweg 11D 79183 Waldkirch / DE | 03 /
Rambach, Daniel Hans-Sachsstraße 9 79331 Teningen / DE | 04 /
Ufheil, Joachim Schulstraße 7 79241 Wasenweiler / DE | [2019/14] |
Former [2016/29] | 01 /
Blaszczack, Wlodzimierz Alice Salomon Strasse 37a/14 79111 Freiburg / DE | Representative(s) | PPR AG BGZ 9497 Triesenberg / LI | [N/P] |
Former [2016/29] | Patentbüro Paul Rosenich AG BGZ 9497 Triesenberg / LI | Application number, filing date | 15151553.3 | 16.01.2015 | [2016/29] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3046151 | Date: | 20.07.2016 | Language: | EN | [2016/29] | Type: | B1 Patent specification | No.: | EP3046151 | Date: | 03.04.2019 | Language: | EN | [2019/14] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 20.07.2015 | Classification | IPC: | H01L31/05, H01L31/18, B32B15/04, H05B3/00 | [2018/45] | CPC: |
H01L31/188 (EP,CN,KR,US);
B32B15/04 (EP,US);
H01L31/0504 (EP,CN,KR,US);
H01L31/0516 (EP,CN,US);
H01L31/186 (KR);
H01L31/1876 (US);
|
Former IPC [2016/29] | H01L31/05, H01L31/18, B32B15/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/09] |
Former [2016/29] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | 20.01.2017 | ME | 20.01.2017 | Title | German: | Verfahren und Vorrichtung zur Herstellung einer Zwischenverbinderanordnung | [2016/29] | English: | Method and apparatus of fabricating an interconnector assembly | [2016/29] | French: | Procédé et appareil de fabrication d'un ensemble d'interconnexion | [2016/29] | Examination procedure | 16.01.2015 | Date on which the examining division has become responsible | 19.01.2017 | Amendment by applicant (claims and/or description) | 20.01.2017 | Examination requested [2017/09] | 21.02.2018 | Despatch of a communication from the examining division (Time limit: M06) | 21.08.2018 | Reply to a communication from the examining division | 25.10.2018 | Communication of intention to grant the patent | 20.02.2019 | Fee for grant paid | 20.02.2019 | Fee for publishing/printing paid | 20.02.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 06.01.2020 | No opposition filed within time limit [2020/11] | Fees paid | Renewal fee | 31.01.2017 | Renewal fee patent year 03 | 30.01.2018 | Renewal fee patent year 04 | 30.01.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.01.2015 | AL | 03.04.2019 | AT | 03.04.2019 | CY | 03.04.2019 | CZ | 03.04.2019 | DK | 03.04.2019 | EE | 03.04.2019 | ES | 03.04.2019 | FI | 03.04.2019 | HR | 03.04.2019 | IT | 03.04.2019 | LT | 03.04.2019 | LV | 03.04.2019 | MC | 03.04.2019 | MK | 03.04.2019 | MT | 03.04.2019 | NL | 03.04.2019 | PL | 03.04.2019 | RO | 03.04.2019 | RS | 03.04.2019 | SE | 03.04.2019 | SI | 03.04.2019 | SK | 03.04.2019 | SM | 03.04.2019 | TR | 03.04.2019 | BG | 03.07.2019 | NO | 03.07.2019 | GR | 04.07.2019 | IS | 03.08.2019 | PT | 03.08.2019 | [2022/32] |
Former [2022/28] | HU | 16.01.2015 | |
AL | 03.04.2019 | ||
AT | 03.04.2019 | ||
CY | 03.04.2019 | ||
CZ | 03.04.2019 | ||
DK | 03.04.2019 | ||
EE | 03.04.2019 | ||
ES | 03.04.2019 | ||
FI | 03.04.2019 | ||
HR | 03.04.2019 | ||
IT | 03.04.2019 | ||
LT | 03.04.2019 | ||
LV | 03.04.2019 | ||
MC | 03.04.2019 | ||
MT | 03.04.2019 | ||
NL | 03.04.2019 | ||
PL | 03.04.2019 | ||
RO | 03.04.2019 | ||
RS | 03.04.2019 | ||
SE | 03.04.2019 | ||
SI | 03.04.2019 | ||
SK | 03.04.2019 | ||
SM | 03.04.2019 | ||
TR | 03.04.2019 | ||
BG | 03.07.2019 | ||
NO | 03.07.2019 | ||
GR | 04.07.2019 | ||
IS | 03.08.2019 | ||
PT | 03.08.2019 | ||
Former [2020/39] | AL | 03.04.2019 | |
AT | 03.04.2019 | ||
CZ | 03.04.2019 | ||
DK | 03.04.2019 | ||
EE | 03.04.2019 | ||
ES | 03.04.2019 | ||
FI | 03.04.2019 | ||
HR | 03.04.2019 | ||
IT | 03.04.2019 | ||
LT | 03.04.2019 | ||
LV | 03.04.2019 | ||
MC | 03.04.2019 | ||
NL | 03.04.2019 | ||
PL | 03.04.2019 | ||
RO | 03.04.2019 | ||
RS | 03.04.2019 | ||
SE | 03.04.2019 | ||
SI | 03.04.2019 | ||
SK | 03.04.2019 | ||
SM | 03.04.2019 | ||
TR | 03.04.2019 | ||
BG | 03.07.2019 | ||
NO | 03.07.2019 | ||
GR | 04.07.2019 | ||
IS | 03.08.2019 | ||
PT | 03.08.2019 | ||
Former [2020/26] | AL | 03.04.2019 | |
AT | 03.04.2019 | ||
CZ | 03.04.2019 | ||
DK | 03.04.2019 | ||
EE | 03.04.2019 | ||
ES | 03.04.2019 | ||
FI | 03.04.2019 | ||
HR | 03.04.2019 | ||
IT | 03.04.2019 | ||
LT | 03.04.2019 | ||
LV | 03.04.2019 | ||
NL | 03.04.2019 | ||
PL | 03.04.2019 | ||
RO | 03.04.2019 | ||
RS | 03.04.2019 | ||
SE | 03.04.2019 | ||
SI | 03.04.2019 | ||
SK | 03.04.2019 | ||
SM | 03.04.2019 | ||
TR | 03.04.2019 | ||
BG | 03.07.2019 | ||
NO | 03.07.2019 | ||
GR | 04.07.2019 | ||
IS | 03.08.2019 | ||
PT | 03.08.2019 | ||
Former [2020/17] | AL | 03.04.2019 | |
AT | 03.04.2019 | ||
CZ | 03.04.2019 | ||
DK | 03.04.2019 | ||
EE | 03.04.2019 | ||
ES | 03.04.2019 | ||
FI | 03.04.2019 | ||
HR | 03.04.2019 | ||
IT | 03.04.2019 | ||
LT | 03.04.2019 | ||
LV | 03.04.2019 | ||
NL | 03.04.2019 | ||
PL | 03.04.2019 | ||
RO | 03.04.2019 | ||
RS | 03.04.2019 | ||
SE | 03.04.2019 | ||
SK | 03.04.2019 | ||
SM | 03.04.2019 | ||
TR | 03.04.2019 | ||
BG | 03.07.2019 | ||
NO | 03.07.2019 | ||
GR | 04.07.2019 | ||
IS | 03.08.2019 | ||
PT | 03.08.2019 | ||
Former [2020/14] | AL | 03.04.2019 | |
AT | 03.04.2019 | ||
CZ | 03.04.2019 | ||
DK | 03.04.2019 | ||
EE | 03.04.2019 | ||
ES | 03.04.2019 | ||
FI | 03.04.2019 | ||
HR | 03.04.2019 | ||
IT | 03.04.2019 | ||
LT | 03.04.2019 | ||
LV | 03.04.2019 | ||
NL | 03.04.2019 | ||
PL | 03.04.2019 | ||
RO | 03.04.2019 | ||
RS | 03.04.2019 | ||
SE | 03.04.2019 | ||
SK | 03.04.2019 | ||
SM | 03.04.2019 | ||
BG | 03.07.2019 | ||
NO | 03.07.2019 | ||
GR | 04.07.2019 | ||
IS | 03.08.2019 | ||
PT | 03.08.2019 | ||
Former [2020/12] | AL | 03.04.2019 | |
AT | 03.04.2019 | ||
CZ | 03.04.2019 | ||
DK | 03.04.2019 | ||
EE | 03.04.2019 | ||
ES | 03.04.2019 | ||
FI | 03.04.2019 | ||
HR | 03.04.2019 | ||
IT | 03.04.2019 | ||
LT | 03.04.2019 | ||
LV | 03.04.2019 | ||
NL | 03.04.2019 | ||
PL | 03.04.2019 | ||
RO | 03.04.2019 | ||
RS | 03.04.2019 | ||
SE | 03.04.2019 | ||
SK | 03.04.2019 | ||
BG | 03.07.2019 | ||
NO | 03.07.2019 | ||
GR | 04.07.2019 | ||
IS | 03.08.2019 | ||
PT | 03.08.2019 | ||
Former [2020/11] | AL | 03.04.2019 | |
AT | 03.04.2019 | ||
CZ | 03.04.2019 | ||
DK | 03.04.2019 | ||
EE | 03.04.2019 | ||
ES | 03.04.2019 | ||
FI | 03.04.2019 | ||
HR | 03.04.2019 | ||
LT | 03.04.2019 | ||
LV | 03.04.2019 | ||
NL | 03.04.2019 | ||
PL | 03.04.2019 | ||
RO | 03.04.2019 | ||
RS | 03.04.2019 | ||
SE | 03.04.2019 | ||
SK | 03.04.2019 | ||
BG | 03.07.2019 | ||
NO | 03.07.2019 | ||
GR | 04.07.2019 | ||
IS | 03.08.2019 | ||
PT | 03.08.2019 | ||
Former [2020/10] | AL | 03.04.2019 | |
AT | 03.04.2019 | ||
CZ | 03.04.2019 | ||
DK | 03.04.2019 | ||
ES | 03.04.2019 | ||
FI | 03.04.2019 | ||
HR | 03.04.2019 | ||
LT | 03.04.2019 | ||
LV | 03.04.2019 | ||
NL | 03.04.2019 | ||
PL | 03.04.2019 | ||
RO | 03.04.2019 | ||
RS | 03.04.2019 | ||
SE | 03.04.2019 | ||
BG | 03.07.2019 | ||
NO | 03.07.2019 | ||
GR | 04.07.2019 | ||
IS | 03.08.2019 | ||
PT | 03.08.2019 | ||
Former [2020/09] | AL | 03.04.2019 | |
AT | 03.04.2019 | ||
CZ | 03.04.2019 | ||
DK | 03.04.2019 | ||
ES | 03.04.2019 | ||
FI | 03.04.2019 | ||
HR | 03.04.2019 | ||
LT | 03.04.2019 | ||
LV | 03.04.2019 | ||
NL | 03.04.2019 | ||
PL | 03.04.2019 | ||
RS | 03.04.2019 | ||
SE | 03.04.2019 | ||
BG | 03.07.2019 | ||
NO | 03.07.2019 | ||
GR | 04.07.2019 | ||
IS | 03.08.2019 | ||
PT | 03.08.2019 | ||
Former [2020/04] | AL | 03.04.2019 | |
AT | 03.04.2019 | ||
CZ | 03.04.2019 | ||
ES | 03.04.2019 | ||
FI | 03.04.2019 | ||
HR | 03.04.2019 | ||
LT | 03.04.2019 | ||
LV | 03.04.2019 | ||
NL | 03.04.2019 | ||
PL | 03.04.2019 | ||
RS | 03.04.2019 | ||
SE | 03.04.2019 | ||
BG | 03.07.2019 | ||
NO | 03.07.2019 | ||
GR | 04.07.2019 | ||
IS | 03.08.2019 | ||
PT | 03.08.2019 | ||
Former [2020/03] | AL | 03.04.2019 | |
AT | 03.04.2019 | ||
CZ | 03.04.2019 | ||
ES | 03.04.2019 | ||
FI | 03.04.2019 | ||
HR | 03.04.2019 | ||
LT | 03.04.2019 | ||
LV | 03.04.2019 | ||
NL | 03.04.2019 | ||
PL | 03.04.2019 | ||
RS | 03.04.2019 | ||
SE | 03.04.2019 | ||
BG | 03.07.2019 | ||
NO | 03.07.2019 | ||
GR | 04.07.2019 | ||
PT | 03.08.2019 | ||
Former [2019/52] | AL | 03.04.2019 | |
CZ | 03.04.2019 | ||
ES | 03.04.2019 | ||
FI | 03.04.2019 | ||
HR | 03.04.2019 | ||
LT | 03.04.2019 | ||
LV | 03.04.2019 | ||
NL | 03.04.2019 | ||
PL | 03.04.2019 | ||
RS | 03.04.2019 | ||
SE | 03.04.2019 | ||
BG | 03.07.2019 | ||
NO | 03.07.2019 | ||
GR | 04.07.2019 | ||
PT | 03.08.2019 | ||
Former [2019/51] | AL | 03.04.2019 | |
CZ | 03.04.2019 | ||
ES | 03.04.2019 | ||
FI | 03.04.2019 | ||
HR | 03.04.2019 | ||
LT | 03.04.2019 | ||
LV | 03.04.2019 | ||
NL | 03.04.2019 | ||
RS | 03.04.2019 | ||
SE | 03.04.2019 | ||
BG | 03.07.2019 | ||
NO | 03.07.2019 | ||
GR | 04.07.2019 | ||
PT | 03.08.2019 | ||
Former [2019/50] | AL | 03.04.2019 | |
CZ | 03.04.2019 | ||
ES | 03.04.2019 | ||
FI | 03.04.2019 | ||
HR | 03.04.2019 | ||
LT | 03.04.2019 | ||
LV | 03.04.2019 | ||
NL | 03.04.2019 | ||
RS | 03.04.2019 | ||
SE | 03.04.2019 | ||
NO | 03.07.2019 | ||
GR | 04.07.2019 | ||
PT | 03.08.2019 | ||
Former [2019/49] | AL | 03.04.2019 | |
CZ | 03.04.2019 | ||
ES | 03.04.2019 | ||
FI | 03.04.2019 | ||
HR | 03.04.2019 | ||
LT | 03.04.2019 | ||
NL | 03.04.2019 | ||
SE | 03.04.2019 | ||
NO | 03.07.2019 | ||
PT | 03.08.2019 | ||
Former [2019/48] | ES | 03.04.2019 | |
FI | 03.04.2019 | ||
LT | 03.04.2019 | ||
NL | 03.04.2019 | ||
SE | 03.04.2019 | ||
NO | 03.07.2019 | ||
PT | 03.08.2019 | ||
Former [2019/47] | ES | 03.04.2019 | |
FI | 03.04.2019 | ||
LT | 03.04.2019 | ||
NL | 03.04.2019 | ||
NO | 03.07.2019 | ||
Former [2019/44] | NL | 03.04.2019 | Documents cited: | Search | [A]WO8603623 (MOBIL SOLAR ENERGY CORP [US]) [A] 1-15* abstract *; | [X]US6105651 (LEANNA ANTHONY J [US]) [X] 15 * abstract * * column 3, line 35 - column 6, line l *; | [X]JP2001206798 (SHARP KK) [X] 15 * abstract * * paragraph [0005] - paragraph [0008] *; | [X]JP2003109690 (NITTO DENKO CORP) [X] 1,8 * abstract * * paragraph [0035] - paragraph [0036] *; | [X]US2009025788 (RUBIN LEONID B [CA], et al) [X] 1-3,6-8,10,14 * abstract * * paragraph [0009] - paragraph [0028] * * paragraph [0064] - paragraph [0072] *; | [X]EP2234181 (SANYO ELECTRIC CO [JP]) [X] 1-14 * abstract * * paragraph [0062] - paragraph [0068] *; | [X]EP2525395 (DELSOLAR CO LTD [TW]) [X] 1,8 * abstract * * paragraph [0037] - paragraph [0059] * | by applicant | DE10130005 | US2011197947 | US8569096 |