EP2890061 - An optical network terminal and a message processing method, a message processing apparatus and system thereof [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.04.2018 Database last updated on 26.03.2025 | |
Former | The patent has been granted Status updated on 12.05.2017 | ||
Former | Grant of patent is intended Status updated on 24.03.2017 | ||
Former | Examination is in progress Status updated on 15.03.2017 | ||
Former | Grant of patent is intended Status updated on 10.11.2016 | Most recent event Tooltip | 26.06.2020 | Lapse of the patent in a contracting state New state(s): CY | published on 29.07.2020 [2020/31] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. B1-3A Intellectual Property Department Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2015/27] | Inventor(s) | 01 /
Yang, Sulin Huawei Technologies Co., Ltd. Intellectual Property Department B1-3A, Bantian Longgang District Shenzhen / CN | 02 /
Niu, Lehong Huawei Technologies Co., Ltd. Intellectual Property Department B1-3A, Bantian Longgang District Shenzhen / CN | [2015/27] | Representative(s) | Kreuz, Georg Maria, et al Huawei Technologies Duesseldorf GmbH Riesstraße 25 80992 München / DE | [N/P] |
Former [2015/27] | Kreuz, Georg Maria, et al Huawei Technologies Duesseldorf GmbH Riesstrasse 8 80992 München / DE | Application number, filing date | 15151721.6 | 20.04.2007 | [2015/27] | Priority number, date | CN20061060583 | 29.04.2006 Original published format: CN200610060583 | CN200610125930 | 21.08.2006 Original published format: CN200610125930 | [2015/27] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2890061 | Date: | 01.07.2015 | Language: | EN | [2015/27] | Type: | B1 Patent specification | No.: | EP2890061 | Date: | 14.06.2017 | Language: | EN | [2017/24] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 29.04.2015 | Classification | IPC: | H04L12/46, H04Q11/00 | [2015/27] | CPC: |
H04L12/4666 (EP,US);
H04Q11/0067 (EP,US);
H04Q2011/0088 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2016/08] |
Former [2015/27] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | Endgerät eines optischen Netzwerks sowie Nachrichtenverarbeitungsverfahren, Nachrichtenverarbeitungsvorrichtung und System dafür | [2015/27] | English: | An optical network terminal and a message processing method, a message processing apparatus and system thereof | [2015/27] | French: | Terminal de réseau optique et procédé de traitement de message, appareil de traitement de message et système correspondant | [2015/27] | Examination procedure | 22.12.2015 | Amendment by applicant (claims and/or description) | 04.01.2016 | Examination requested [2016/08] | 19.04.2016 | Despatch of a communication from the examining division (Time limit: M04) | 25.08.2016 | Reply to a communication from the examining division | 11.11.2016 | Communication of intention to grant the patent | 14.03.2017 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 14.03.2017 | Fee for grant paid | 14.03.2017 | Fee for publishing/printing paid | 23.03.2017 | Information about intention to grant a patent | 23.03.2017 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP07720880.9 / EP2015520 | Divisional application(s) | EP17170026.3 / EP3236620 | Opposition(s) | 15.03.2018 | No opposition filed within time limit [2018/21] | Fees paid | Renewal fee | 20.05.2015 | Renewal fee patent year 03 | 20.05.2015 | Renewal fee patent year 04 | 20.05.2015 | Renewal fee patent year 05 | 20.05.2015 | Renewal fee patent year 06 | 20.05.2015 | Renewal fee patent year 07 | 20.05.2015 | Renewal fee patent year 08 | 20.05.2015 | Renewal fee patent year 09 | 02.05.2016 | Renewal fee patent year 10 | 02.05.2017 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.04.2007 | AT | 14.06.2017 | CY | 14.06.2017 | CZ | 14.06.2017 | DK | 14.06.2017 | EE | 14.06.2017 | ES | 14.06.2017 | FI | 14.06.2017 | IT | 14.06.2017 | LT | 14.06.2017 | LV | 14.06.2017 | MC | 14.06.2017 | NL | 14.06.2017 | PL | 14.06.2017 | PT | 14.06.2017 | RO | 14.06.2017 | SE | 14.06.2017 | SI | 14.06.2017 | SK | 14.06.2017 | TR | 14.06.2017 | BG | 14.09.2017 | GR | 15.09.2017 | IS | 14.10.2017 | [2020/31] |
Former [2020/30] | HU | 20.04.2007 | |
AT | 14.06.2017 | ||
CZ | 14.06.2017 | ||
DK | 14.06.2017 | ||
EE | 14.06.2017 | ||
ES | 14.06.2017 | ||
FI | 14.06.2017 | ||
IT | 14.06.2017 | ||
LT | 14.06.2017 | ||
LV | 14.06.2017 | ||
MC | 14.06.2017 | ||
NL | 14.06.2017 | ||
PL | 14.06.2017 | ||
PT | 14.06.2017 | ||
RO | 14.06.2017 | ||
SE | 14.06.2017 | ||
SI | 14.06.2017 | ||
SK | 14.06.2017 | ||
TR | 14.06.2017 | ||
BG | 14.09.2017 | ||
GR | 15.09.2017 | ||
IS | 14.10.2017 | ||
Former [2020/28] | AT | 14.06.2017 | |
CZ | 14.06.2017 | ||
DK | 14.06.2017 | ||
EE | 14.06.2017 | ||
ES | 14.06.2017 | ||
FI | 14.06.2017 | ||
IT | 14.06.2017 | ||
LT | 14.06.2017 | ||
LV | 14.06.2017 | ||
MC | 14.06.2017 | ||
NL | 14.06.2017 | ||
PL | 14.06.2017 | ||
PT | 14.06.2017 | ||
RO | 14.06.2017 | ||
SE | 14.06.2017 | ||
SI | 14.06.2017 | ||
SK | 14.06.2017 | ||
TR | 14.06.2017 | ||
BG | 14.09.2017 | ||
GR | 15.09.2017 | ||
IS | 14.10.2017 | ||
Former [2020/15] | AT | 14.06.2017 | |
CZ | 14.06.2017 | ||
DK | 14.06.2017 | ||
EE | 14.06.2017 | ||
ES | 14.06.2017 | ||
FI | 14.06.2017 | ||
IT | 14.06.2017 | ||
LT | 14.06.2017 | ||
LV | 14.06.2017 | ||
MC | 14.06.2017 | ||
NL | 14.06.2017 | ||
PL | 14.06.2017 | ||
RO | 14.06.2017 | ||
SE | 14.06.2017 | ||
SI | 14.06.2017 | ||
SK | 14.06.2017 | ||
TR | 14.06.2017 | ||
BG | 14.09.2017 | ||
GR | 15.09.2017 | ||
IS | 14.10.2017 | ||
Former [2018/52] | AT | 14.06.2017 | |
CZ | 14.06.2017 | ||
DK | 14.06.2017 | ||
EE | 14.06.2017 | ||
ES | 14.06.2017 | ||
FI | 14.06.2017 | ||
IT | 14.06.2017 | ||
LT | 14.06.2017 | ||
LV | 14.06.2017 | ||
MC | 14.06.2017 | ||
NL | 14.06.2017 | ||
PL | 14.06.2017 | ||
RO | 14.06.2017 | ||
SE | 14.06.2017 | ||
SI | 14.06.2017 | ||
SK | 14.06.2017 | ||
BG | 14.09.2017 | ||
GR | 15.09.2017 | ||
IS | 14.10.2017 | ||
Former [2018/40] | AT | 14.06.2017 | |
CZ | 14.06.2017 | ||
DK | 14.06.2017 | ||
EE | 14.06.2017 | ||
ES | 14.06.2017 | ||
FI | 14.06.2017 | ||
IT | 14.06.2017 | ||
LT | 14.06.2017 | ||
LV | 14.06.2017 | ||
NL | 14.06.2017 | ||
PL | 14.06.2017 | ||
RO | 14.06.2017 | ||
SE | 14.06.2017 | ||
SI | 14.06.2017 | ||
SK | 14.06.2017 | ||
BG | 14.09.2017 | ||
GR | 15.09.2017 | ||
IS | 14.10.2017 | ||
Former [2018/21] | AT | 14.06.2017 | |
CZ | 14.06.2017 | ||
DK | 14.06.2017 | ||
EE | 14.06.2017 | ||
ES | 14.06.2017 | ||
FI | 14.06.2017 | ||
IT | 14.06.2017 | ||
LT | 14.06.2017 | ||
LV | 14.06.2017 | ||
NL | 14.06.2017 | ||
PL | 14.06.2017 | ||
RO | 14.06.2017 | ||
SE | 14.06.2017 | ||
SK | 14.06.2017 | ||
BG | 14.09.2017 | ||
GR | 15.09.2017 | ||
IS | 14.10.2017 | ||
Former [2018/11] | AT | 14.06.2017 | |
CZ | 14.06.2017 | ||
EE | 14.06.2017 | ||
ES | 14.06.2017 | ||
FI | 14.06.2017 | ||
IT | 14.06.2017 | ||
LT | 14.06.2017 | ||
LV | 14.06.2017 | ||
NL | 14.06.2017 | ||
PL | 14.06.2017 | ||
RO | 14.06.2017 | ||
SE | 14.06.2017 | ||
SK | 14.06.2017 | ||
BG | 14.09.2017 | ||
GR | 15.09.2017 | ||
IS | 14.10.2017 | ||
Former [2018/10] | AT | 14.06.2017 | |
CZ | 14.06.2017 | ||
EE | 14.06.2017 | ||
FI | 14.06.2017 | ||
LT | 14.06.2017 | ||
LV | 14.06.2017 | ||
NL | 14.06.2017 | ||
RO | 14.06.2017 | ||
SE | 14.06.2017 | ||
SK | 14.06.2017 | ||
BG | 14.09.2017 | ||
GR | 15.09.2017 | ||
Former [2018/09] | EE | 14.06.2017 | |
FI | 14.06.2017 | ||
LT | 14.06.2017 | ||
LV | 14.06.2017 | ||
NL | 14.06.2017 | ||
SE | 14.06.2017 | ||
BG | 14.09.2017 | ||
GR | 15.09.2017 | ||
Former [2017/52] | FI | 14.06.2017 | |
LT | 14.06.2017 | ||
LV | 14.06.2017 | ||
NL | 14.06.2017 | ||
SE | 14.06.2017 | ||
BG | 14.09.2017 | ||
GR | 15.09.2017 | ||
Former [2017/50] | FI | 14.06.2017 | |
LT | 14.06.2017 | ||
LV | 14.06.2017 | ||
SE | 14.06.2017 | ||
BG | 14.09.2017 | ||
GR | 15.09.2017 | ||
Former [2017/49] | FI | 14.06.2017 | |
LT | 14.06.2017 | ||
GR | 15.09.2017 | Documents cited: | Search | [A]WO03052946 (BROADCOM CORP [US]) [A] 1-23 * abstract * * page 2, line 5 - page 4, line 20 * * page 12, line 18 - page 15, line 11 *; | [A]EP1244254 (CIT ALCATEL [FR]) [A] 1-23 * paragraphs [0008] , [0010] , [0030] - [0033] - [0036] - [0038] - [0043] - [0045] *; | [XP] - FRANK EFFENBERGER HUAWEI TECHNOLOGIES CHINA, "Proposal of VLAN configuration and management in G.983.2 (R2);PC03 D", ITU-T DRAFT ; STUDY PERIOD 2005-2008, INTERNATIONAL TELECOMMUNICATION UNION, GENEVA ; CH, (20060901), vol. 2, pages 1 - 7, XP017528457 [XP] 1-23 * the whole document * | [A] - NIU LEHONG HUAWEI TECHNOLOGIES CO ET AL, "Proposal of GPON in support of 802.1ad; D 578", ITU-T DRAFT STUDY PERIOD 2005-2008, INTERNATIONAL TELECOMMUNICATION UNION, GENEVA ; CH, (20060206), vol. STUDY GROUP 15, pages 1 - 3, XP017407693 [A] 1-23 * the whole document * | [A] - "B-PON OMCI support for IP, ISDN, video, VLAN tagging, VC cross-connections and other select functions; G.983.8 (03/03)", ITU-T STANDARD WITHDRAWN (W), INTERNATIONAL TELECOMMUNICATION UNION, GENEVA, CH, (20030316), no. G.983.8 (03/03), XP017404676 [A] 1-23 * section 7.4.1 and 7.4.2 * | [AP] - YANG SULIN HUAWEI TECH CO LTD CHINA, "Proposal of VLAN configuration and management in G.984.4;PU15", ITU-T DRAFT ; STUDY PERIOD 2005-2008, INTERNATIONAL TELECOMMUNICATION UNION, GENEVA ; CH, (20060522), vol. 2, pages 1 - 5, XP017528437 [AP] 1-23 * the whole document * |