EP2941025 - Apparatus, method, and system for desynchronizing notifications across multiple devices [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.07.2019 Database last updated on 06.12.2019 | |
Former | The patent has been granted Status updated on 17.08.2018 | ||
Former | Grant of patent is intended Status updated on 10.04.2018 | Most recent event Tooltip | 15.11.2019 | Lapse of the patent in a contracting state New state(s): BE, SI | published on 18.12.2019 [2019/51] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si Gyeonggi-do 443-742 / KR | [2018/38] |
Former [2015/45] | For all designated states Samsung Electronics Co., Ltd 129, Samsung-ro Yeongtong-gu Suwon-si Gyeonggi-do 443-742 / KR | Inventor(s) | 01 /
Mast, Andrew 21225 SE 42nd PL Issaquah, WA Washington 98029 / US | 02 /
Yengisetty, Rajesh 14020 SE 13th Place Apt No 103 Bellevue, WA Washington 98007 / US | 03 /
Li, Zhiyun 8105 NE 150th St Kenmore, WA Washington 98028 / US | [2015/45] | Representative(s) | HGF Limited Saviour House 9 St. Saviourgate York YO1 8NQ / GB | [2018/38] |
Former [2015/45] | Jenkins, Richard Gavin HGF Limited Saviour House 9 St Saviourgate York YO1 8NQ / GB | Application number, filing date | 15153200.9 | 30.01.2015 | [2015/45] | Priority number, date | US201414265817 | 30.04.2014 Original published format: US201414265817 | [2015/45] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2941025 | Date: | 04.11.2015 | Language: | EN | [2015/45] | Type: | B1 Patent specification | No.: | EP2941025 | Date: | 19.09.2018 | Language: | EN | [2018/38] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 14.09.2015 | Classification | International: | H04W4/12, H04M1/725, H04W4/14, H04W88/18 | [2018/17] |
Former International [2015/45] | H04W4/12 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/24] |
Former [2015/45] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Vorrichtung, Verfahren und System zum Entsynchronisieren von Benachrichtigungen über mehrere Vorrichtungen hinweg | [2015/45] | English: | Apparatus, method, and system for desynchronizing notifications across multiple devices | [2015/45] | French: | Appareil, procédé et système de notifications de désynchronisation sur de multiples dispositifs | [2015/45] | Examination procedure | 04.05.2016 | Amendment by applicant (claims and/or description) | 04.05.2016 | Examination requested [2016/24] | 11.04.2018 | Communication of intention to grant the patent | 08.08.2018 | Fee for grant paid | 08.08.2018 | Fee for publishing/printing paid | 08.08.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | EP18182056.4 / EP3402229 | EP19200761.5 | Opposition(s) | 20.06.2019 | No opposition filed within time limit [2019/35] | Fees paid | Renewal fee | 04.01.2017 | Renewal fee patent year 03 | 05.01.2018 | Renewal fee patent year 04 | Lapses during opposition Tooltip | AL | 19.09.2018 | AT | 19.09.2018 | CZ | 19.09.2018 | DK | 19.09.2018 | EE | 19.09.2018 | ES | 19.09.2018 | FI | 19.09.2018 | HR | 19.09.2018 | LT | 19.09.2018 | LV | 19.09.2018 | MC | 19.09.2018 | PL | 19.09.2018 | RO | 19.09.2018 | RS | 19.09.2018 | SE | 19.09.2018 | SI | 19.09.2018 | SK | 19.09.2018 | SM | 19.09.2018 | BG | 19.12.2018 | NO | 19.12.2018 | GR | 20.12.2018 | IS | 19.01.2019 | PT | 19.01.2019 | LU | 30.01.2019 | BE | 31.01.2019 | [2019/50] |
Former [2019/44] | AL | 19.09.2018 | |
AT | 19.09.2018 | ||
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
LU | 30.01.2019 | ||
Former [2019/40] | AL | 19.09.2018 | |
AT | 19.09.2018 | ||
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/34] | AL | 19.09.2018 | |
AT | 19.09.2018 | ||
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/26] | AL | 19.09.2018 | |
AT | 19.09.2018 | ||
CZ | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/23] | AL | 19.09.2018 | |
AT | 19.09.2018 | ||
CZ | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
Former [2019/22] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
Former [2019/21] | AL | 19.09.2018 | |
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
Former [2019/12] | AL | 19.09.2018 | |
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/11] | FI | 19.09.2018 | |
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/10] | FI | 19.09.2018 | |
LT | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/08] | FI | 19.09.2018 | |
LT | 19.09.2018 | ||
NO | 19.12.2018 | ||
Former [2019/07] | LT | 19.09.2018 | Documents cited: | Search | [X]US2012278475 (PAPAKIPOS MATTHEW NICHOLAS [US], et al) [X] 1-15 * abstract * * paragraphs [0005] , [0 48] - [0051] *; | [X]EP2669854 (APPLE INC [US]) [X] 1-15 * abstract * * paragraphs [0004] - [0006] - [0 40] - [0042] *; | [X]US2006150175 (ETELAPERA ESA [FI]) [X] 1-15 * abstract * * paragraphs [0021] - [0024] * |