EP2960002 - METHODS FOR DISSIMILAR MATERIAL WELDING [Right-click to bookmark this link] | |||
Former [2016/01] | SYSTEMS AND METHODS FOR DISSIMILAR MATERIAL WELDING | ||
[2020/11] | Status | No opposition filed within time limit Status updated on 03.04.2021 Database last updated on 21.03.2025 | |
Former | The patent has been granted Status updated on 24.04.2020 | ||
Former | Grant of patent is intended Status updated on 23.02.2020 | ||
Former | Examination is in progress Status updated on 30.11.2018 | ||
Former | Request for examination was made Status updated on 27.11.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Raytheon Technologies Corporation 10 Farm Springs Road Farmington, CT 06032 / US | [2021/12] |
Former [2016/43] | For all designated states United Technologies Corporation 10 Farm Springs Road Farmington, CT 06032 / US | ||
Former [2016/01] | For all designated states United Technologies Corporation One Financial Plaza Hartford, CT 06101 / US | Inventor(s) | 01 /
Pelletier, Carl E. 22 Berkshire Drive East Hampton, CT Connecticut 06424 / US | 02 /
Bogue, William 1 West Main Street Hebron, CT Connecticut 06248 / US | [2016/01] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2020/22] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | ||
Former [2016/01] | Leckey, David Herbert Dehns St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 15163894.7 | 16.04.2015 | [2016/01] | Priority number, date | US201462013381P | 17.06.2014 Original published format: US 201462013381 P | [2016/01] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2960002 | Date: | 30.12.2015 | Language: | EN | [2015/53] | Type: | A3 Search report | No.: | EP2960002 | Date: | 20.04.2016 | Language: | EN | [2016/16] | Type: | B1 Patent specification | No.: | EP2960002 | Date: | 27.05.2020 | Language: | EN | [2020/22] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.03.2016 | Classification | IPC: | B23K11/00, B23K20/12, B23K20/233, B23K9/20, B23K26/323, B23K35/02, B21K1/44, B21H7/00, B23K20/22, B23K11/26 | [2016/01] | CPC: |
B23K9/201 (EP,US);
B23K31/02 (US);
B23K11/0053 (EP,US);
B23K11/26 (EP,US);
B23K20/1295 (EP,US);
B23K20/22 (EP,US);
B23K26/323 (EP,US);
B23K35/02 (EP,US);
B23K35/0288 (EP,US);
B23K35/3033 (EP,US);
B23K35/304 (EP,US);
C22F1/10 (EP,US);
B23K2103/08 (EP,US);
B23K2103/18 (EP,US);
B23K2103/26 (EP,US);
F16B37/061 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/47] |
Former [2016/01] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUM SCHWEISSEN VON UNTERSCHIEDLICHEM MATERIAL | [2020/11] | English: | METHODS FOR DISSIMILAR MATERIAL WELDING | [2020/11] | French: | PROCÉDÉS DE SOUDAGE DE MATÉRIAUX DISSEMBLABLES | [2020/11] |
Former [2016/01] | SYSTEME UND VERFAHREN ZUM SCHWEISSEN VON UNTERSCHIEDLICHEM MATERIAL | ||
Former [2016/01] | SYSTEMS AND METHODS FOR DISSIMILAR MATERIAL WELDING | ||
Former [2016/01] | SYSTÈMES ET PROCÉDÉS DE SOUDAGE DE MATÉRIAUX DISSEMBLABLES | Examination procedure | 18.10.2016 | Examination requested [2016/47] | 28.11.2016 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 07.02.2017 | Amendment by applicant (claims and/or description) | 28.11.2018 | Despatch of a communication from the examining division (Time limit: M06) | 06.06.2019 | Reply to a communication from the examining division | 24.02.2020 | Communication of intention to grant the patent | 31.03.2020 | Fee for grant paid | 31.03.2020 | Fee for publishing/printing paid | 31.03.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20167338.1 / EP3693119 | EP24167082.7 / EP4450206 | Opposition(s) | 02.03.2021 | No opposition filed within time limit [2021/18] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 07.02.2017 | Request for further processing filed | 07.02.2017 | Full payment received (date of receipt of payment) Request granted | 24.02.2017 | Decision despatched | Fees paid | Renewal fee | 25.04.2017 | Renewal fee patent year 03 | 25.04.2018 | Renewal fee patent year 04 | 18.04.2019 | Renewal fee patent year 05 | 21.04.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.04.2015 | AL | 27.05.2020 | AT | 27.05.2020 | CY | 27.05.2020 | CZ | 27.05.2020 | DK | 27.05.2020 | EE | 27.05.2020 | ES | 27.05.2020 | FI | 27.05.2020 | HR | 27.05.2020 | IT | 27.05.2020 | LT | 27.05.2020 | LV | 27.05.2020 | MC | 27.05.2020 | MK | 27.05.2020 | MT | 27.05.2020 | NL | 27.05.2020 | PL | 27.05.2020 | RO | 27.05.2020 | RS | 27.05.2020 | SE | 27.05.2020 | SI | 27.05.2020 | SK | 27.05.2020 | SM | 27.05.2020 | BG | 27.08.2020 | NO | 27.08.2020 | GR | 28.08.2020 | PT | 28.09.2020 | [2024/41] |
Former [2024/22] | HU | 16.04.2015 | |
AL | 27.05.2020 | ||
AT | 27.05.2020 | ||
CY | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
MK | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
PT | 28.09.2020 | ||
Former [2023/30] | HU | 16.04.2015 | |
AL | 27.05.2020 | ||
AT | 27.05.2020 | ||
CY | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
PT | 28.09.2020 | ||
Former [2023/29] | HU | 16.04.2015 | |
AL | 27.05.2020 | ||
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
PT | 28.09.2020 | ||
Former [2022/10] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
PT | 28.09.2020 | ||
Former [2021/50] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/24] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/10] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/09] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/08] | AL | 27.05.2020 | |
DK | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/04] | AL | 27.05.2020 | |
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/01] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/51] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/50] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/48] | FI | 27.05.2020 | |
LT | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/47] | LT | 27.05.2020 | |
NO | 27.08.2020 | ||
IS | 27.09.2020 | ||
Former [2020/46] | IS | 27.09.2020 | Documents cited: | Search | [X]WO8805991 (SFS STADLER AG [CH]); | [XI]DE9319729U (MOEHLING GMBH & CO [DE]); | [X]DE19540848 (HETTICH LUDWIG & CO [DE]); | [A]DE19613919 (DAIMLER BENZ AG [DE]) |