blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3127183

EP3127183 - METHOD FOR PASSIVE METAL ACTIVATION AND USES THEREOF [Right-click to bookmark this link]
Former [2017/06]A METHOD FOR PASSIVE METAL ACTIVATION AND USES THEREOF
[2020/40]
StatusNo opposition filed within time limit
Status updated on  06.08.2021
Database last updated on 23.04.2024
FormerThe patent has been granted
Status updated on  28.08.2020
FormerGrant of patent is intended
Status updated on  07.05.2020
FormerExamination is in progress
Status updated on  23.03.2018
FormerRequest for examination was made
Status updated on  06.01.2017
FormerThe international publication has been made
Status updated on  04.11.2016
Most recent event   Tooltip23.06.2023Lapse of the patent in a contracting state
New state(s): CY
published on 26.07.2023  [2023/30]
Applicant(s)For all designated states
Technion Research & Development Foundation Ltd.
Senate House
Technion City
3200004 Haifa / IL
[2020/40]
Former [2017/06]For all designated states
Technion Research & Development Foundation Ltd.
Senate House
Technion City
3200004 Haifa / IL
Inventor(s)01 / EIN-ELI, Yair
9 Amnon Vetamar Street
3479157 Haifa / IL
02 / GELMAN, Danny
Kfar Meshtalmim 134/4
Technion City
3200004 Haifa / IL
03 / SHVRATSEV, Boris
Kfar Meshtalmim 132/1
Technion City
3200004 Haifa / IL
04 / KRAYTSBERG, Alexander
11/1 Bental Street
2068611 Yokneam / IL
 [2017/06]
Representative(s)Boult Wade Tennant LLP
Salisbury Square House
8 Salisbury Square
London EC4Y 8AP / GB
[2020/40]
Former [2017/06]Office Kirkpatrick
Avenue Wolfers, 32
1310 La Hulpe / BE
Application number, filing date15773010.231.03.2015
[2017/06]
WO2015IL50350
Priority number, dateUS201461972481P31.03.2014         Original published format: US 201461972481 P
[2017/06]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015151099
Date:08.10.2015
Language:EN
[2015/40]
Type: A1 Application with search report 
No.:EP3127183
Date:08.02.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 08.10.2015 takes the place of the publication of the European patent application.
[2017/06]
Type: B1 Patent specification 
No.:EP3127183
Date:30.09.2020
Language:EN
[2020/40]
Search report(s)International search report - published on:IL08.10.2015
(Supplementary) European search report - dispatched on:EP10.08.2017
ClassificationIPC:H01M12/06, C25D3/66, C25D5/34, C25D5/24, H01M6/14, H01M10/054, B23K1/20, B23K35/36, H01M10/0569, H01M12/08, C25D5/54, H01M4/134, H01M4/36, H01M4/46, H01M4/62, // H01M4/02
[2017/36]
CPC:
H01M4/044 (EP,US); B23K35/3605 (EP,US); B23K35/383 (EP,US);
B23K9/23 (US); C25D3/665 (EP,US); C25D5/34 (EP,US);
C25D5/38 (US); C25D5/54 (EP,US); C25D5/56 (EP,US);
H01M10/054 (EP,US); H01M10/0569 (EP,US); H01M12/08 (EP,US);
H01M4/134 (EP,US); H01M4/1395 (EP,US); H01M4/366 (EP,US);
H01M4/463 (EP,US); H01M4/628 (EP,US); H01M4/661 (EP,US);
B23K2103/04 (US); B23K2103/10 (US); H01M2004/027 (EP,US);
H01M2300/0045 (EP,US); H01M4/502 (EP,US); Y02E60/10 (EP,US) (-)
Former IPC [2017/06]H01M12/06, C25D3/66, C25D5/34, C25D5/24, H01M6/14, H01M10/054, B23K1/20, B23K35/36
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/06]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:VERFAHREN ZUR PASSIVEN METALLAKTIVIERUNG UND VERWENDUNGEN DAVON[2017/06]
English:METHOD FOR PASSIVE METAL ACTIVATION AND USES THEREOF[2020/40]
French:PROCÉDÉ D'ACTIVATION DE MÉTAL PASSIF ET SES UTILISATIONS[2017/06]
Former [2017/06]A METHOD FOR PASSIVE METAL ACTIVATION AND USES THEREOF
Entry into regional phase13.10.2016National basic fee paid 
13.10.2016Search fee paid 
13.10.2016Designation fee(s) paid 
13.10.2016Examination fee paid 
Examination procedure13.10.2016Examination requested  [2017/06]
13.10.2016Date on which the examining division has become responsible
21.02.2018Amendment by applicant (claims and/or description)
21.03.2018Despatch of a communication from the examining division (Time limit: M04)
20.07.2018Reply to a communication from the examining division
17.08.2018Despatch of a communication from the examining division (Time limit: M04)
02.01.2019Reply to a communication from the examining division
12.02.2019Despatch of a communication from the examining division (Time limit: M04)
13.06.2019Reply to a communication from the examining division
20.04.2020Cancellation of oral proceeding that was planned for 13.05.2020
08.05.2020Communication of intention to grant the patent
13.05.2020Date of oral proceedings (cancelled)
19.08.2020Fee for grant paid
19.08.2020Fee for publishing/printing paid
19.08.2020Receipt of the translation of the claim(s)
Opposition(s)01.07.2021No opposition filed within time limit [2021/36]
Fees paidRenewal fee
30.03.2017Renewal fee patent year 03
25.05.2018Renewal fee patent year 04
26.03.2019Renewal fee patent year 05
24.03.2020Renewal fee patent year 06
Penalty fee
Additional fee for renewal fee
31.03.201804   M06   Fee paid on   25.05.2018
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU31.03.2015
AL30.09.2020
AT30.09.2020
CY30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
GB31.03.2021
IE31.03.2021
LI31.03.2021
LU31.03.2021
[2023/30]
Former [2023/27]HU31.03.2015
AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
GB31.03.2021
IE31.03.2021
LI31.03.2021
LU31.03.2021
Former [2022/34]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
GB31.03.2021
IE31.03.2021
LI31.03.2021
LU31.03.2021
Former [2022/23]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
CH31.03.2021
FR31.03.2021
GB31.03.2021
IE31.03.2021
LI31.03.2021
LU31.03.2021
Former [2022/10]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
CH31.03.2021
FR31.03.2021
GB31.03.2021
IE31.03.2021
LI31.03.2021
LU31.03.2021
Former [2022/08]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
FR31.03.2021
GB31.03.2021
IE31.03.2021
LU31.03.2021
Former [2022/07]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
IE31.03.2021
Former [2021/50]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/48]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/45]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/37]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/28]AL30.09.2020
AT30.09.2020
CZ30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/25]AL30.09.2020
AT30.09.2020
CZ30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/23]AT30.09.2020
CZ30.09.2020
EE30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/22]CZ30.09.2020
EE30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/21]FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
RS30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/20]FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
RS30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
Former [2021/10]FI30.09.2020
HR30.09.2020
LV30.09.2020
RS30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
Former [2021/08]FI30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
Former [2021/07]FI30.09.2020
NO30.12.2020
Documents cited:Search[XAI]JP2010146800  (EQUOS RES CO LTD) [X] 1-8,10,11,13,15 * paragraphs [0006] - [0009] - [0015] , [0029] * [A] 12 [I] 14;
 [X]JP2014032914  (TOYOTA MOTOR CORP, et al) [X] 1-4,6-11,13,15 * paragraphs [0020] , [0039] *;
 [A]  - TSUDA T ET AL, "A highly conductive composite electrolyte consisting of polymer and room temperature molten fluorohydrogenates", SOLID STATE IO, NORTH HOLLAND PUB. COMPANY. AMSTERDAM; NL, NL, (20020802), vol. 149, no. 3-4, doi:10.1016/S0167-2738(02)00399-5, ISSN 0167-2738, pages 295 - 298, XP004370988 [A] 1-15 * the whole document *

DOI:   http://dx.doi.org/10.1016/S0167-2738(02)00399-5
International search[XY]US1922847  (GRENAGLE JAMES B) [X] 39, 41-43, 46-49, 51, 52, 63, 64, 67, 68 * page 1 lines 1-5 ; page 1 lines 69-73 ; page 1 line 104-page 2 line 35 * [Y] 40, 44, 45, 65, 71-73;
 [XY]US4619716  (SUZUKI KENICHI [JP], et al) [X] 25, 27, 32-36, 38, 47-49, 51, 52, 63, 67, 68, 72 * abstract; col. 1 lines 26-30 ; col. 3 lines 2-38 , 54-60 ; col. 5 lines 17-44 ; col. 13 lines 23-56; col. 15 lines 11-25 * [Y] 26, 28-31, 37, 64, 65, 73;
 [XY]US4643241  (YONEKURA KOJI [JP], et al) [X] 1-11, 47-49, 51, 52, 67, 68, 72 * abstract; col. 1 lines 34-39 ; col. 2 lines 25-35 ; col. 3 lines 3-6 ; 35-40 ; 51-55 ; Example 1 * [Y] 12, 73;
 [XY]EP1983078  (TNO [NL]) [X] 39, 41-44, 46, 51, 55-57, 59, 60, 63, 64, 71 * abstract; para. [0023],[0046],[0074],[0078],[0079],[0085],[0093],[0095] * [Y] 40, 45, 53, 54, 58, 61, 65, 66, 72, 73;
 [XY]US2011262816  (AMATUCCI GLENN [US]) [X] 13-19, 47-51, 55, 56, 59 * para. [0013], [0098]-[0105],[0119]-[0127] * [Y] 53, 54, 57, 58, 60-73;
 [XY]  - CHEN P.-Y. et al., "Electrochemical study of copper in a basic 1-ethyl-3-ethylimidazolium tetrafluoroborate room temperature molten salt", Electrochimica Acta, (19990000), vol. 45, no. 3, pages 441 - 450, XP055229196 [X] 39, 41, 46, 51, 55, 56, 60, 61 * abstract; section 3.5 - pages 448-449 * [Y] 40, 42-45, 57-59, 63-66, 71-73

DOI:   http://dx.doi.org/10.1016/S0013-4686(99)00275-3
 [PX]  - GELMAN D. et al., "Aluminum-air battery based on an ionic liquid Electrolyte", J. Mater. Chem. A, (20140000), pages 20237 - 20242, XP055229200 [PX] 1-10, 13-20, 23, 24, 47-51, 56, 60-62 * The whole document *

DOI:   http://dx.doi.org/10.1039/C4TA04721D
by applicantUS5082812
 US5411583
 US5587142
 DE19731349
 JP2010146800
 JP2014032914
    - KURT R. et al., J. Am. Ceram. Soc., (19990000), vol. 82, no. 12, pages 3561 - 66
    - NOCKEMANN P. et al., J. Phys. Chem. B, (20060000), vol. 110, pages 20978 - 20992
    - TSUDA, T. et al., Solid State Ionics, (20020000), vol. 149, pages 295 - 298
    - SHVARTSEV, B. et al., Phys. Chem. Chem. Phys., (20130000), vol. 15, no. 41, pages 17837 - 45
    - DOCHE, M.L. et al., Corros. Sci., (19990000), vol. 41, page 805
    - EGAN, D.R. et al., Journal of Power Sources, (20130000), vol. 236
    - HAGIWARA, R. et al., Journal of the Electrochemical Society, (20020000), vol. 149, no. 1, pages D1 - D6
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.