EP3245112 - METHOD FOR OPERATING A LONGITUDINALLY GUIDING DRIVER ASSISTANCE SYSTEM OF A MOTOR VEHICLE AND MOTOR VEHICLE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.07.2019 Database last updated on 15.01.2025 | |
Former | The patent has been granted Status updated on 17.08.2018 | ||
Former | Grant of patent is intended Status updated on 02.07.2018 | ||
Former | Request for examination was made Status updated on 20.10.2017 | ||
Former | The international publication has been made Status updated on 03.04.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, HU, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states Audi AG 85045 Ingolstadt / DE | [2017/47] | Inventor(s) | 01 /
SCHUBERTH, Stefan Holbeinstr. 21 85080 Gaimersheim / DE | 02 /
HELD, Ralf Benedicta-von-Spiegel-Str. 78 85072 Eichstätt / DE | 03 /
BRÜCKLMAIER, Florian Feldbergweg 5 84048 Mainburg / DE | [2017/47] | Representative(s) | Herbst, Matthias Heinz Audi AG Friedrichshofener Straße 16 85045 Ingolstadt / DE | [N/P] |
Former [2017/47] | Herbst, Matthias Heinz Audi AG Patentabteilung I/EZ-14 85045 Ingolstadt / DE | Application number, filing date | 15819791.3 | 19.12.2015 | [2017/47] | WO2015EP02570 | Priority number, date | DE20151000539 | 17.01.2015 Original published format: DE102015000539 | [2017/47] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2016112945 | Date: | 21.07.2016 | Language: | DE | [2016/29] | Type: | A1 Application with search report | No.: | EP3245112 | Date: | 22.11.2017 | Language: | DE | The application published by WIPO in one of the EPO official languages on 21.07.2016 takes the place of the publication of the European patent application. | [2017/47] | Type: | B1 Patent specification | No.: | EP3245112 | Date: | 19.09.2018 | Language: | DE | [2018/38] | Search report(s) | International search report - published on: | EP | 21.07.2016 | Classification | IPC: | B60W30/14, B60W50/08, B60W50/00, B60W30/18 | [2018/27] | CPC: |
B60W30/143 (EP,CN,US);
B60W50/0097 (EP,CN,US);
B60W30/18072 (EP,CN,US);
B60W50/085 (EP,CN,US);
B60K2310/244 (EP,CN,US);
B60W2540/215 (EP,CN,US);
B60W2552/20 (EP,CN,US);
B60W2555/60 (EP,CN,US);
B60W2556/50 (EP,CN,US);
|
Former IPC [2017/47] | B60W30/14, B60W50/00, B60W30/18 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUM BETRIEB EINES LÄNGSFÜHRENDEN FAHRERASSISTENZSYSTEMS EINES KRAFTFAHRZEUGS UND KRAFTFAHRZEUG | [2017/47] | English: | METHOD FOR OPERATING A LONGITUDINALLY GUIDING DRIVER ASSISTANCE SYSTEM OF A MOTOR VEHICLE AND MOTOR VEHICLE | [2017/47] | French: | PROCÉDÉ PERMETTANT DE FAIRE FONCTIONNER UN SYSTÈME D'ASSISTANCE AU CONDUCTEUR LONGITUDINAL D'UN VÉHICULE AUTOMOBILE ET VÉHICULE AUTOMOBILE | [2017/47] | Entry into regional phase | 17.08.2017 | National basic fee paid | 17.08.2017 | Designation fee(s) paid | 17.08.2017 | Examination fee paid | Examination procedure | 10.06.2016 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 24.03.2017 | Date on which the examining division has become responsible | 17.08.2017 | Examination requested [2017/47] | 09.11.2017 | Amendment by applicant (claims and/or description) | 03.07.2018 | Communication of intention to grant the patent | 31.07.2018 | Fee for grant paid | 31.07.2018 | Fee for publishing/printing paid | 31.07.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 20.06.2019 | No opposition filed within time limit [2019/35] | Fees paid | Renewal fee | 02.01.2018 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.12.2015 | AL | 19.09.2018 | CY | 19.09.2018 | CZ | 19.09.2018 | DK | 19.09.2018 | EE | 19.09.2018 | ES | 19.09.2018 | FI | 19.09.2018 | HR | 19.09.2018 | IT | 19.09.2018 | LT | 19.09.2018 | LV | 19.09.2018 | MC | 19.09.2018 | MK | 19.09.2018 | MT | 19.09.2018 | NL | 19.09.2018 | PL | 19.09.2018 | RO | 19.09.2018 | RS | 19.09.2018 | SE | 19.09.2018 | SI | 19.09.2018 | SK | 19.09.2018 | SM | 19.09.2018 | TR | 19.09.2018 | BG | 19.12.2018 | IE | 19.12.2018 | LU | 19.12.2018 | NO | 19.12.2018 | GR | 20.12.2018 | BE | 31.12.2018 | CH | 31.12.2018 | LI | 31.12.2018 | IS | 19.01.2019 | PT | 19.01.2019 | [2020/31] |
Former [2020/17] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
MT | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
TR | 19.09.2018 | ||
BG | 19.12.2018 | ||
IE | 19.12.2018 | ||
LU | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2020/08] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
MT | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
IE | 19.12.2018 | ||
LU | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2020/04] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
IE | 19.12.2018 | ||
LU | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/50] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
IE | 19.12.2018 | ||
LU | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
BE | 31.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/48] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
IE | 19.12.2018 | ||
LU | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/40] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
LU | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/39] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
LU | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/34] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/26] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/23] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
Former [2019/22] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
Former [2019/21] | AL | 19.09.2018 | |
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
Former [2019/20] | AL | 19.09.2018 | |
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/12] | AL | 19.09.2018 | |
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/11] | FI | 19.09.2018 | |
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/10] | FI | 19.09.2018 | |
LT | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/08] | FI | 19.09.2018 | |
LT | 19.09.2018 | ||
NO | 19.12.2018 | ||
Former [2019/07] | LT | 19.09.2018 | Cited in | International search | [XY]DE102007018733 (VOLKSWAGEN AG [DE]) [X] 1,4,8 * figures 1a,1b,2a,2b * * claims 1,2, 4, 7 * * paragraphs [0003] - [0008] - [ 0016] , [ 0025] - [0028] - [ 0032] - [0033] * [Y] 6,7; | [I]EP2527222 (AUDI AG [DE]) [I] 1-5,8 * figure 4 * * paragraphs [0015] - [0019] - [ 0041] , [ 0054] *; | [YA]DE102013205609 (BOSCH GMBH ROBERT [DE]) [Y] 6 * abstract * * the whole document * [A] 1-5,7,8; | [YA]WO2010139383 (DAIMLER AG [DE], et al) [Y] 7 * the whole document * [A] 1-6,8; | [A]DE102013216705 (GM GLOBAL TECH OPERATIONS INC [US]) [A] 1-8 * the whole document * | Examination | DE102010018097 |