EP3293027 - ROOF OF A PLANNING STRUCTURE WITH A RAIL STRUCTURE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.09.2023 Database last updated on 21.03.2025 | |
Former | The patent has been granted Status updated on 30.09.2022 | ||
Former | Grant of patent is intended Status updated on 12.04.2022 | ||
Former | Examination is in progress Status updated on 15.02.2022 | ||
Former | Grant of patent is intended Status updated on 02.11.2021 | ||
Former | Examination is in progress Status updated on 20.01.2020 | ||
Former | Request for examination was made Status updated on 14.09.2018 | ||
Former | The application has been published Status updated on 09.02.2018 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Schmitz Cargobull AG Siemensstraße 50 48341 Altenberge / DE | [2018/11] | Inventor(s) | 01 /
Schouwink, Christian Flamenstrasse 34 48161 Münster / DE | 02 /
Hornig, Stefan Breulstrasse 29 48565 Steinfurt / DE | [2018/11] | Representative(s) | Cohausz & Florack Patent- & Rechtsanwälte Partnerschaftsgesellschaft mbB Bleichstraße 14 40211 Düsseldorf / DE | [2018/11] | Application number, filing date | 16188597.5 | 13.09.2016 | [2018/11] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3293027 | Date: | 14.03.2018 | Language: | DE | [2018/11] | Type: | B1 Patent specification | No.: | EP3293027 | Date: | 02.11.2022 | Language: | DE | [2022/44] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 03.04.2017 | Classification | IPC: | B60J5/06, B60J7/06 | [2018/11] | CPC: |
B60J5/065 (EP);
B60J7/062 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/42] |
Former [2018/11] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | DACH EINES PLANENAUFBAUS MIT EINER HOLMSTRUKTUR | [2018/11] | English: | ROOF OF A PLANNING STRUCTURE WITH A RAIL STRUCTURE | [2018/11] | French: | TOIT D'UNE STRUCTURE BACHEE COMPRENANT UNE STRUCTURE DE LONGERON | [2022/15] |
Former [2018/11] | TOIT D'UNE STRUCTURE BACHEE COMPRENANT UNE STRUCTURE DE LONGERON | Examination procedure | 13.09.2016 | Date on which the examining division has become responsible | 07.09.2018 | Amendment by applicant (claims and/or description) | 07.09.2018 | Examination requested [2018/42] | 23.01.2020 | Despatch of a communication from the examining division (Time limit: M04) | 08.04.2020 | Reply to a communication from the examining division | 21.07.2020 | Despatch of a communication from the examining division (Time limit: M04) | 10.11.2020 | Reply to a communication from the examining division | 28.09.2021 | Date of oral proceedings | 15.10.2021 | Minutes of oral proceedings despatched | 03.11.2021 | Communication of intention to grant the patent | 11.02.2022 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 13.04.2022 | Communication of intention to grant the patent | 23.08.2022 | Fee for grant paid | 23.08.2022 | Fee for publishing/printing paid | 23.08.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 03.08.2023 | No opposition filed within time limit [2023/41] | Fees paid | Renewal fee | 20.09.2018 | Renewal fee patent year 03 | 19.09.2019 | Renewal fee patent year 04 | 21.09.2020 | Renewal fee patent year 05 | 20.09.2021 | Renewal fee patent year 06 | 22.09.2022 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 02.11.2022 | BG | 02.11.2022 | CZ | 02.11.2022 | DK | 02.11.2022 | EE | 02.11.2022 | ES | 02.11.2022 | FI | 02.11.2022 | HR | 02.11.2022 | IT | 02.11.2022 | LT | 02.11.2022 | LV | 02.11.2022 | MC | 02.11.2022 | NL | 02.11.2022 | PL | 02.11.2022 | RO | 02.11.2022 | RS | 02.11.2022 | SE | 02.11.2022 | SI | 02.11.2022 | SK | 02.11.2022 | SM | 02.11.2022 | NO | 02.02.2023 | GR | 03.02.2023 | IS | 02.03.2023 | PT | 02.03.2023 | [2024/51] |
Former [2024/28] | AL | 02.11.2022 | |
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
IT | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
MC | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SI | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2024/26] | AL | 02.11.2022 | |
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
IT | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SI | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/51] | AL | 02.11.2022 | |
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SI | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/38] | AL | 02.11.2022 | |
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/37] | AL | 02.11.2022 | |
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/35] | CZ | 02.11.2022 | |
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/34] | DK | 02.11.2022 | |
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/33] | DK | 02.11.2022 | |
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/29] | ES | 02.11.2022 | |
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/26] | ES | 02.11.2022 | |
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
PL | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/24] | ES | 02.11.2022 | |
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
SE | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
PT | 02.03.2023 | ||
Former [2023/23] | ES | 02.11.2022 | |
FI | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
SE | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
PT | 02.03.2023 | ||
Former [2023/22] | ES | 02.11.2022 | |
FI | 02.11.2022 | ||
LT | 02.11.2022 | ||
SE | 02.11.2022 | ||
NO | 02.02.2023 | ||
PT | 02.03.2023 | ||
Former [2023/20] | LT | 02.11.2022 | |
NO | 02.02.2023 | Documents cited: | Search | [A]FR2595304 (LIBNER JOSEPH [FR]) [A] 1,11 * figure 1 *; | [A]DE29700177U (SCHARWAECHTER GMBH CO KG [DE]) [A] 1 * figures 3,5,7 *; | [A]EP1008476 (ASCA CARROSSIER CONSTRUCTEUR [FR]) [A] 1,15* figures 2,3 *; | [A]EP1867509 (FAHRZEUGWERK BERNARD KRONE [DE]) [A] 1,15 * figure 3 *; | [A]EP1918145 (TSE TRAILER SYSTEM ENGINEERING [DE]) [A] 1,7 * figures 2-6 *; | [XI]EP2902228 (VERSUS INVEST BVBA [BE]) [X] 1,3,4,15 * figure 2 * [I] 5-7; | [XI]DE102014013725 (EUROP TRAILER SYSTEMS GMBH [DE]) [X] 1-8,12-15 * figure 2 * [I] 9-11 | Examination | DE202014000805U | EP2759428 |