EP3276802 - RARE-EARTH MAGNET AND LINEAR MOTOR USING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.07.2023 Database last updated on 25.03.2025 | |
Former | The patent has been granted Status updated on 05.08.2022 | ||
Former | Grant of patent is intended Status updated on 07.04.2022 | ||
Former | Examination is in progress Status updated on 08.10.2021 | ||
Former | Request for examination was made Status updated on 29.12.2017 | ||
Former | The international publication has been made Status updated on 16.10.2017 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Nitto Denko Corporation 1-2 Shimohozumi 1-chome Ibaraki-shi, Osaka 567-8680 / JP | [2018/05] | Inventor(s) | 01 /
FUJIHARA Makoto c/o NITTO DENKO CORPORATION 1-2 Shimohozumi 1-chome Ibaraki-shi Osaka 567-8680 / JP | 02 /
HOSHINO Toshinobu c/o NITTO DENKO CORPORATION 1-2 Shimohozumi 1-chome Ibaraki-shi Osaka 567-8680 / JP | 03 /
SAITO Shoichiro c/o NITTO DENKO CORPORATION 1-2 Shimohozumi 1-chome Ibaraki-shi Osaka 567-8680 / JP | 04 /
FUJIKAWA Kenichi c/o NITTO DENKO CORPORATION 1-2 Shimohozumi 1-chome Ibaraki-shi Osaka 567-8680 / JP | [2018/05] | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2018/05] | Application number, filing date | 16768878.7 | 24.03.2016 | [2018/05] | WO2016JP59390 | Priority number, date | JP20150061081 | 24.03.2015 Original published format: JP 2015061081 | JP20160022770 | 09.02.2016 Original published format: JP 2016022770 | [2018/05] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016152975 | Date: | 29.09.2016 | Language: | JA | [2016/39] | Type: | A1 Application with search report | No.: | EP3276802 | Date: | 31.01.2018 | Language: | EN | [2018/05] | Type: | B1 Patent specification | No.: | EP3276802 | Date: | 07.09.2022 | Language: | EN | [2022/36] | Search report(s) | International search report - published on: | JP | 29.09.2016 | (Supplementary) European search report - dispatched on: | EP | 29.11.2018 | Classification | IPC: | H01F41/02, H01F1/057, H02K41/03, H01F7/02, H02K15/03 | [2022/14] | CPC: |
H01F1/0577 (EP,KR,US);
H01F7/02 (EP,KR,US);
H01F13/003 (US);
H01F41/0273 (EP,US);
H02K1/02 (KR);
H02K15/03 (EP,US);
H02K41/02 (US);
H02K41/03 (EP,US);
H02K41/031 (KR);
H01F41/028 (US)
(-)
|
Former IPC [2019/01] | H02K41/03, H01F1/057, H01F7/02, H02K15/03, H01F41/02 | ||
Former IPC [2018/05] | H02K41/03, H01F1/057, H01F7/02, H02K15/03 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/05] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SELTENERDMAGNET UND LINEARMOTOR DAMIT | [2018/05] | English: | RARE-EARTH MAGNET AND LINEAR MOTOR USING SAME | [2018/05] | French: | AIMANT DE TERRES RARES ET MOTEUR LINÉAIRE L'UTILISANT | [2018/05] | Entry into regional phase | 16.10.2017 | Translation filed | 16.10.2017 | National basic fee paid | 16.10.2017 | Search fee paid | 16.10.2017 | Designation fee(s) paid | 16.10.2017 | Examination fee paid | Examination procedure | 16.10.2017 | Examination requested [2018/05] | 16.10.2017 | Date on which the examining division has become responsible | 18.06.2019 | Amendment by applicant (claims and/or description) | 07.10.2021 | Despatch of a communication from the examining division (Time limit: M02) | 02.12.2021 | Reply to a communication from the examining division | 08.04.2022 | Communication of intention to grant the patent | 01.08.2022 | Fee for grant paid | 01.08.2022 | Fee for publishing/printing paid | 01.08.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 08.06.2023 | No opposition filed within time limit [2023/33] | Fees paid | Renewal fee | 13.03.2018 | Renewal fee patent year 03 | 13.03.2019 | Renewal fee patent year 04 | 12.03.2020 | Renewal fee patent year 05 | 23.03.2021 | Renewal fee patent year 06 | 25.03.2022 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 07.09.2022 | AT | 07.09.2022 | BG | 07.09.2022 | CZ | 07.09.2022 | DK | 07.09.2022 | EE | 07.09.2022 | ES | 07.09.2022 | FI | 07.09.2022 | HR | 07.09.2022 | IT | 07.09.2022 | LT | 07.09.2022 | LV | 07.09.2022 | MC | 07.09.2022 | NL | 07.09.2022 | PL | 07.09.2022 | RO | 07.09.2022 | RS | 07.09.2022 | SE | 07.09.2022 | SI | 07.09.2022 | SK | 07.09.2022 | SM | 07.09.2022 | NO | 07.12.2022 | GR | 08.12.2022 | IS | 07.01.2023 | PT | 09.01.2023 | GB | 24.03.2023 | IE | 24.03.2023 | LU | 24.03.2023 | BE | 31.03.2023 | CH | 31.03.2023 | FR | 31.03.2023 | LI | 31.03.2023 | [2024/51] |
Former [2024/26] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
IT | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
MC | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
GB | 24.03.2023 | ||
IE | 24.03.2023 | ||
LU | 24.03.2023 | ||
BE | 31.03.2023 | ||
CH | 31.03.2023 | ||
FR | 31.03.2023 | ||
LI | 31.03.2023 | ||
Former [2024/11] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
MC | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
GB | 24.03.2023 | ||
IE | 24.03.2023 | ||
LU | 24.03.2023 | ||
BE | 31.03.2023 | ||
CH | 31.03.2023 | ||
FR | 31.03.2023 | ||
LI | 31.03.2023 | ||
Former [2024/09] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
MC | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
GB | 24.03.2023 | ||
IE | 24.03.2023 | ||
LU | 24.03.2023 | ||
CH | 31.03.2023 | ||
LI | 31.03.2023 | ||
Former [2024/08] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
MC | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
GB | 24.03.2023 | ||
IE | 24.03.2023 | ||
LU | 24.03.2023 | ||
Former [2024/02] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
MC | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
LU | 24.03.2023 | ||
Former [2023/48] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
MC | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/37] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/34] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/30] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/29] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/26] | AT | 07.09.2022 | |
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/23] | AT | 07.09.2022 | |
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
PT | 09.01.2023 | ||
Former [2023/22] | AT | 07.09.2022 | |
CZ | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
PT | 09.01.2023 | ||
Former [2023/20] | ES | 07.09.2022 | |
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
Former [2023/10] | ES | 07.09.2022 | |
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
Former [2023/09] | ES | 07.09.2022 | |
FI | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
NO | 07.12.2022 | ||
Former [2023/08] | ES | 07.09.2022 | |
FI | 07.09.2022 | ||
LT | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
NO | 07.12.2022 | Documents cited: | Search | [X]WO9414175 (COOKSON GROUP PLC [GB], et al) [X] 1-11 * page 6, paragraph 2 * * page 12, paragraph 4; figure 7B *; | [X]JP2001076925 (HITACHI METALS LTD) [X] 1-11 * paragraph [0021]; figures 1,5; example 1 *; | [I]WO2013175730 (PANASONIC CORP [JP]) [I] 1-11* figure 4; claims 1,6,7 * | International search | [A]DE3913276 (SIEMENS AG [DE]) [A] 1-11* , entire text; all drawings (Family: none) *; | [Y]JPH08107665 (HITACHI METALS LTD) [Y] 10-11 * , paragraph [0011]; fig. 1 & US 5808381 A column 3, lines 12 to 35; fig. 1 *; | [XYA]JP2001006924 (TODA KOGYO CORP) [X] 1, 4-5, 8-9 * , paragraphs [0014] to [0018]; fig. 6, 9 & US 6304162 B1 & EP 1063659 A2 paragraphs [0028] to [0036]; fig. 17/33, 21/33 * [Y] 10-11 [A] 2-3, 6-7; | [Y]JP2005044820 (NEOMAX CO LTD) [Y] 6, 10-11 * , paragraphs [0019] to [0020], [0028] to [0031]; fig. 1 to 3 & US 2005/0076973 A1 paragraphs [0018] to [0019], [0027], [0050] to [0052]; fig. 1 to 3 *; | [XYA]JP3864986B (Aichi Steel Works Ltd.) [X] 1-3, 7-9 * , paragraphs [0012] to [0015], [0022], [0048] to [0049]; fig. 1, 5, 8 (Family: none) * [Y] 6, 10-11 [A] 4-5; | [Y]US2013328453 (DUNCAN GERALD DAVID [NZ], et al) [Y] 6, 10-11 * , paragraphs [0140], [0142], [0191]; fig. 4b & US 2011/0012463 A1 & WO 2009/017430 A1 & CN 101816117 A * | Examination | EP1063659 |