blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

Latvia joins the Federated Register
Click here for more information on the Federated Register.

2025-04-16

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3159127

EP3159127 - METHOD FOR MANUFACTURING A PLASTIC COMPOSITION COMPRISING THERMOPLASTIC AND THERMOSET MATERIAL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.05.2021
Database last updated on 19.04.2025
FormerThe patent has been granted
Status updated on  12.06.2020
FormerGrant of patent is intended
Status updated on  14.05.2020
FormerExamination is in progress
Status updated on  08.06.2018
FormerRequest for examination was made
Status updated on  03.11.2017
FormerThe application has been published
Status updated on  24.03.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
Conenor Oy
Poukamankatu 12
15240 Lahti / FI
For all designated states
Vilkki, Markku
Poukamankatu 12
15240 Lahti / FI
[2020/29]
Former [2017/17]For all designated states
Conenor Oy
Teollisuustie 13
33330 Tampere / FI
For all designated states
Vilkki, Markku
Poukamankatu 12
15240 Lahti / FI
Inventor(s)01 / Vilkki, Markku
Poukamankatu 12
15240 Lahti / FI
 [2017/17]
Representative(s)Kolster Oy Ab
(Salmisaarenaukio 1)
P.O. Box 204
00181 Helsinki / FI
[2020/29]
Former [2017/17]Kolster Oy Ab
Salmisaarenaukio 1
P.O. Box 204
00180 Helsinki / FI
Application number, filing date17155520.410.02.2017
[2017/17]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP3159127
Date:26.04.2017
Language:EN
[2017/17]
Type: A3 Search report 
No.:EP3159127
Date:03.05.2017
Language:EN
[2017/18]
Type: B1 Patent specification 
No.:EP3159127
Date:15.07.2020
Language:EN
[2020/29]
Search report(s)(Supplementary) European search report - dispatched on:EP05.04.2017
ClassificationIPC:B29B7/00, B29B7/10, B29B7/90, B29B9/08, // B29K105/24, B29K101/12, B29K105/06, B29B9/16
[2019/10]
CPC:
B29B7/005 (EP,US); B29B17/0026 (CN); B29B13/022 (US);
B29B13/045 (US); B29B7/10 (EP,US); B29B7/90 (EP,US);
B29B9/08 (EP,US); C08K3/04 (US); C08K3/26 (US);
C08K3/346 (US); C08K3/36 (US); C08K3/38 (US);
C08K3/40 (US); C08K5/09 (US); C08K5/14 (US);
C08L23/06 (US); C08L23/12 (US); C08L23/20 (US);
C08L25/06 (US); C08L27/06 (US); C08L55/02 (US);
C08L63/00 (US); C08L67/00 (US); C08L75/04 (US);
B29B9/16 (EP,US); B29K2101/12 (EP,CN,US); B29K2105/06 (EP,CN,US);
B29K2105/065 (EP,CN,US); B29K2105/106 (US); B29K2105/24 (EP,CN,US);
C08K2003/265 (US); C08L2207/04 (US); Y02W30/62 (US) (-)
Former IPC [2017/18]B29B17/00, // B29K105/06, B29K105/24, B29K101/12
Former IPC [2017/17]B29B17/00, // B29K105/06, B29K105/24
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/49]
Former [2017/17]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINER KUNSTSTOFFMISCHUNG ENTHALTEND THERMOPLASTISCHES UND DUROPLASTISCHES MATERIAL[2017/17]
English:METHOD FOR MANUFACTURING A PLASTIC COMPOSITION COMPRISING THERMOPLASTIC AND THERMOSET MATERIAL[2017/17]
French:PROCÉDÉ DE FABRICATION D'UN MÉLANGE PLASTIQUE COMPORTANT UN MATÉRIAU THERMOPLASTIQUE ET UN MATÉRIAU THERMODURCISSABLE[2019/10]
Former [2017/17]PROCÉDÉ DER FABRICATION D'UN MELANGE PLASTIQUE COMPORTANT UN MATERIAU THERMOPLASTIQUE ET UN MATERIAU THERMODURCISSABLE
Examination procedure10.02.2017Date on which the examining division has become responsible
30.10.2017Examination requested  [2017/49]
13.04.2018Amendment by applicant (claims and/or description)
11.06.2018Despatch of a communication from the examining division (Time limit: M04)
11.10.2018Reply to a communication from the examining division
17.01.2019Despatch of a communication from the examining division (Time limit: M04)
21.01.2019Reply to a communication from the examining division
04.03.2019Despatch of a communication from the examining division (Time limit: M04)
02.05.2019Reply to a communication from the examining division
08.07.2019Despatch of a communication from the examining division (Time limit: M04)
05.09.2019Reply to a communication from the examining division
28.04.2020Cancellation of oral proceeding that was planned for 12.05.2020
12.05.2020Date of oral proceedings (cancelled)
15.05.2020Communication of intention to grant the patent
03.06.2020Fee for grant paid
03.06.2020Fee for publishing/printing paid
03.06.2020Receipt of the translation of the claim(s)
Opposition(s)16.04.2021No opposition filed within time limit [2021/25]
Fees paidRenewal fee
11.02.2019Renewal fee patent year 03
11.02.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.02.2017
AL15.07.2020
AT15.07.2020
CY15.07.2020
CZ15.07.2020
EE15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
MK15.07.2020
MT15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
BG15.10.2020
GR16.10.2020
IS15.11.2020
LU10.02.2021
CH28.02.2021
LI28.02.2021
[2024/41]
Former [2024/22]HU10.02.2017
AL15.07.2020
AT15.07.2020
CY15.07.2020
CZ15.07.2020
EE15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
MK15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
BG15.10.2020
GR16.10.2020
IS15.11.2020
LU10.02.2021
CH28.02.2021
LI28.02.2021
Former [2023/30]HU10.02.2017
AL15.07.2020
AT15.07.2020
CY15.07.2020
CZ15.07.2020
EE15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
BG15.10.2020
GR16.10.2020
IS15.11.2020
LU10.02.2021
CH28.02.2021
LI28.02.2021
Former [2023/27]HU10.02.2017
AL15.07.2020
AT15.07.2020
CZ15.07.2020
EE15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
BG15.10.2020
GR16.10.2020
IS15.11.2020
LU10.02.2021
CH28.02.2021
LI28.02.2021
Former [2021/47]AL15.07.2020
AT15.07.2020
CZ15.07.2020
EE15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
BG15.10.2020
GR16.10.2020
IS15.11.2020
LU10.02.2021
CH28.02.2021
LI28.02.2021
Former [2021/41]AL15.07.2020
AT15.07.2020
CZ15.07.2020
EE15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
BG15.10.2020
GR16.10.2020
IS15.11.2020
Former [2021/36]AL15.07.2020
AT15.07.2020
CZ15.07.2020
EE15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
BG15.10.2020
GR16.10.2020
IS15.11.2020
Former [2021/28]AL15.07.2020
AT15.07.2020
CZ15.07.2020
EE15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SK15.07.2020
SM15.07.2020
BG15.10.2020
GR16.10.2020
IS15.11.2020
Former [2021/25]AL15.07.2020
AT15.07.2020
CZ15.07.2020
EE15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SM15.07.2020
BG15.10.2020
GR16.10.2020
IS15.11.2020
Former [2021/22]AT15.07.2020
CZ15.07.2020
EE15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SM15.07.2020
BG15.10.2020
GR16.10.2020
IS15.11.2020
Former [2021/10]AT15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
PL15.07.2020
RS15.07.2020
BG15.10.2020
GR16.10.2020
IS15.11.2020
Former [2021/07]LT15.07.2020
Documents cited:Search[XAI]EP0401885  (MASTER SRL [IT]) [X] 1-3,11-13 * column 1, line 38 - line 53; claims 1-3 * [A] 4-8,15 [I] 9,10,14;
 [XA]US5861117  (ROSENBAUM JAMES E [US]) [X] 1-14 * column 4, line 49 - line 59 * * column 5, line 58 - column 6, line 60 * * column 8, line 15 - line 23 * [A] 15;
 [XI]US2003125399  (ZHANG CHENGJIE [CA], et al) [X] 1,2,4,11-13,15 * paragraphs [0023] , [0025] , [0033] , [0046]; claims 1,6-8,16,17 * [I] 3,7,10;
 [XA]US6497956  (PHILLIPS THOMAS E [US], et al) [X] 1-14 * column 2, line 10 - line 53 * * column 3, line 3 - line 32 * * column 4, line 6 - line 16 * [A] 15
ExaminationWO0108862
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.