EP3373666 - UPLINK TRANSMISSION POWER CONTROL METHOD AND USER EQUIPMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.01.2023 Database last updated on 21.03.2025 | |
Former | The patent has been granted Status updated on 11.02.2022 | ||
Former | Grant of patent is intended Status updated on 05.10.2021 | ||
Former | Examination is in progress Status updated on 06.03.2019 | ||
Former | Request for examination was made Status updated on 10.08.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2018/37] | Inventor(s) | 01 /
ZHANG, Xingwei c/o Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | 02 /
CHANG, Junren c/o Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | 03 /
CHEN, Yuhua c/o Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | 04 /
FAN, Xiaoan c/o Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | 05 /
LI, Bo c/o Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | 06 /
CHENG, Yan c/o Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | 07 /
LI, Yuanjie c/o Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2018/37] | Representative(s) | Körber, Martin Hans Mitscherlich PartmbB Patent- und Rechtsanwälte Sonnenstrasse 33 80331 München / DE | [2018/37] | Application number, filing date | 17210614.8 | 28.11.2012 | [2018/37] | Priority number, date | CN201110426330 | 19.12.2011 Original published format: CN201110426330 | [2018/37] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3373666 | Date: | 12.09.2018 | Language: | EN | [2018/37] | Type: | B1 Patent specification | No.: | EP3373666 | Date: | 16.03.2022 | Language: | EN | [2022/11] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 05.07.2018 | Classification | IPC: | H04W52/36, H04W52/14, H04W52/34, // H04W52/24 | [2018/37] | CPC: |
H04W52/367 (EP,CN,US);
H04W52/146 (EP,CN,US);
H04W52/30 (US);
H04W52/241 (CN);
H04W52/267 (CN);
H04W52/346 (EP,CN,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/37] | Title | German: | UPLINK-SENDELEISTUNGSSTEUERUNGSVERFAHREN UND BENUTZERAUSRÜSTUNG | [2018/37] | English: | UPLINK TRANSMISSION POWER CONTROL METHOD AND USER EQUIPMENT | [2018/37] | French: | PROCÉDÉ DE COMMANDE DE PUISSANCE DE TRANSMISSION EN LIAISON MONTANTE ET ÉQUIPEMENT UTILISATEUR | [2018/37] | Examination procedure | 27.12.2017 | Examination requested [2018/37] | 27.12.2017 | Date on which the examining division has become responsible | 13.02.2019 | Amendment by applicant (claims and/or description) | 11.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 15.07.2019 | Reply to a communication from the examining division | 15.06.2021 | Despatch of a communication from the examining division (Time limit: M01) | 22.07.2021 | Reply to a communication from the examining division | 06.10.2021 | Communication of intention to grant the patent | 13.01.2022 | Fee for grant paid | 13.01.2022 | Fee for publishing/printing paid | 02.02.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP12860733.0 / EP2785119 | Opposition(s) | 19.12.2022 | No opposition filed within time limit [2023/08] | Fees paid | Renewal fee | 27.12.2017 | Renewal fee patent year 03 | 27.12.2017 | Renewal fee patent year 04 | 27.12.2017 | Renewal fee patent year 05 | 27.12.2017 | Renewal fee patent year 06 | 28.11.2018 | Renewal fee patent year 07 | 27.11.2019 | Renewal fee patent year 08 | 27.11.2020 | Renewal fee patent year 09 | 29.11.2021 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.11.2012 | AL | 16.03.2022 | AT | 16.03.2022 | CY | 16.03.2022 | CZ | 16.03.2022 | DK | 16.03.2022 | EE | 16.03.2022 | ES | 16.03.2022 | FI | 16.03.2022 | HR | 16.03.2022 | IT | 16.03.2022 | LT | 16.03.2022 | LV | 16.03.2022 | MC | 16.03.2022 | MK | 16.03.2022 | MT | 16.03.2022 | PL | 16.03.2022 | RO | 16.03.2022 | RS | 16.03.2022 | SE | 16.03.2022 | SI | 16.03.2022 | SK | 16.03.2022 | SM | 16.03.2022 | TR | 16.03.2022 | BG | 16.06.2022 | NO | 16.06.2022 | GR | 17.06.2022 | IS | 16.07.2022 | PT | 18.07.2022 | IE | 28.11.2022 | LU | 28.11.2022 | BE | 30.11.2022 | CH | 30.11.2022 | LI | 30.11.2022 | [2024/42] |
Former [2024/29] | HU | 28.11.2012 | |
AL | 16.03.2022 | ||
AT | 16.03.2022 | ||
CY | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
IT | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
MK | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
TR | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
IE | 28.11.2022 | ||
LU | 28.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/27] | HU | 28.11.2012 | |
AL | 16.03.2022 | ||
AT | 16.03.2022 | ||
CY | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
IT | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
MK | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
IE | 28.11.2022 | ||
LU | 28.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/21] | HU | 28.11.2012 | |
AL | 16.03.2022 | ||
AT | 16.03.2022 | ||
CY | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
IT | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
IE | 28.11.2022 | ||
LU | 28.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/18] | HU | 28.11.2012 | |
AL | 16.03.2022 | ||
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
IT | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
IE | 28.11.2022 | ||
LU | 28.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/49] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
IT | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
IE | 28.11.2022 | ||
LU | 28.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/48] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
IT | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
IE | 28.11.2022 | ||
LU | 28.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/37] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
IT | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
LU | 28.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/35] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
IT | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/31] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2023/10] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2023/07] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2023/01] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2022/51] | AT | 16.03.2022 | |
CZ | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2022/50] | AT | 16.03.2022 | |
CZ | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
PT | 18.07.2022 | ||
Former [2022/49] | AT | 16.03.2022 | |
CZ | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
PT | 18.07.2022 | ||
Former [2022/48] | AT | 16.03.2022 | |
CZ | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
PT | 18.07.2022 | ||
Former [2022/47] | AT | 16.03.2022 | |
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
PT | 18.07.2022 | ||
Former [2022/39] | FI | 16.03.2022 | |
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
Former [2022/36] | HR | 16.03.2022 | |
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
Former [2022/35] | HR | 16.03.2022 | |
LT | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
Former [2022/33] | LT | 16.03.2022 | |
NO | 16.06.2022 | Documents cited: | Search | [A]WO2011120716 (PANASONIC CORP [JP], et al) [A] 1-10 * claims 1-40 * * figure 13 * * page 24 - page 25 * * page 58 - page 59 *; | [A] - NTT DOCOMO, "Issues on UL Simultaneous Transmission for Multiple TA", 3GPP DRAFT; R1-114070 UL CA FOR MULTIPLE TA, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111110), vol. RAN WG1, no. San Francisco, USA; 20111114 - 20111118, XP050562404 [A] 1-10 * the whole document * | [A] - LG ELECTRONICS, "Aspect on Simultaneous Transmission of PRACH and UL Channels considering Multiple Timing Advance", 3GPP DRAFT; R1-113910_SIMULTANEOUS TRANSMISSION OF PRACH AND UL CHANNELS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111109), vol. RAN WG1, no. San Francisco, USA; 20111114 - 20111118, XP050562268 [A] 1-10 * the whole document * |