EP3505387 - COMPACT AND DISTRIBUTED STATION FOR CHARGING, BATTERY REPLACEMENT AND ENERGY STORAGE [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 29.03.2024 Database last updated on 04.12.2024 | |
Former | Grant of patent is intended Status updated on 14.02.2024 | ||
Former | Examination is in progress Status updated on 18.10.2021 | ||
Former | Request for examination was made Status updated on 31.05.2019 | ||
Former | The international publication has been made Status updated on 03.03.2018 | Most recent event Tooltip | 01.11.2024 | Lapse of the patent in a contracting state New state(s): LV, PL, RS | published on 04.12.2024 [2024/49] | Applicant(s) | For all designated states Nio Co., Ltd. Suite 115, No. 569 Anchi Road Anting Town Jiading District Shanghai 201804 / CN | [2019/27] | Inventor(s) | 01 /
ZHANG, Jianxing 20 Building No. 56 Antuo Road Anting Town Jiading Shanghai 201804 / CN | 02 /
CHEN, Jiong 20 Building No. 56 Antuo Road Anting Town Jiading Shanghai 201804 / CN | 03 /
XU, Honggang 20 Building No. 56 Antuo Road Anting Town Jiading Shanghai 201804 / CN | 04 /
LAI, Jianwen 20 Building No. 56 Antuo Road Anting Town Jiading Shanghai 201804 / CN | 05 /
ZHAO, Zhiling 20 Building No. 56 Antuo Road Anting Town Jiading Shanghai 201804 / CN | [2019/27] | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstrasse 3 81675 München / DE | [2019/27] | Application number, filing date | 17842942.9 | 23.08.2017 | [2019/27] | WO2017CN98659 | Priority number, date | CN201620946673U | 25.08.2016 Original published format: CN 201620946673 U | [2019/27] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018036520 | Date: | 01.03.2018 | Language: | ZH | [2018/09] | Type: | A1 Application with search report | No.: | EP3505387 | Date: | 03.07.2019 | Language: | EN | [2019/27] | Type: | B1 Patent specification | No.: | EP3505387 | Date: | 01.05.2024 | Language: | EN | [2024/18] | Search report(s) | International search report - published on: | CN | 01.03.2018 | (Supplementary) European search report - dispatched on: | EP | 19.03.2020 | Classification | IPC: | B60L53/30, H02J9/00, B60L50/60, B60L58/12, B60L55/00, B60L53/80, B60L53/53, H02J7/00 | [2024/07] | CPC: |
B60L50/60 (EP,US);
B60L53/80 (EP,KR,US);
B60K35/00 (KR);
B60L50/50 (KR);
B60L53/30 (EP,US);
B60L53/53 (EP,US);
B60L55/00 (EP);
B60L58/10 (KR);
B60L58/12 (EP,US);
B60L2250/16 (EP,KR);
B60Y2200/91 (KR);
H02J2310/48 (EP);
H02J7/00034 (EP);
H02J7/0047 (EP,KR);
H02J7/0048 (EP,KR);
Y02E60/00 (EP);
Y02T10/70 (EP,KR);
Y02T10/7072 (EP,KR);
|
Former IPC [2020/17] | B60L53/30, B60L53/53, B60L53/80, B60L55/00, B60L58/12, B60L50/60, H02J9/00 | ||
Former IPC [2019/27] | B60L11/18 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/27] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | KOMPAKTE UND VERTEILTE BASISSTATION ZUM AUFLADEN, ERSETZEN EINER BATTERIE UND ENERGIESPEICHERN | [2019/27] | English: | COMPACT AND DISTRIBUTED STATION FOR CHARGING, BATTERY REPLACEMENT AND ENERGY STORAGE | [2019/27] | French: | POSTE COMPACT ET RÉPARTI POUR CHARGE, REMPLACEMENT DE BATTERIE ET STOCKAGE D'ÉNERGIE | [2019/27] | Entry into regional phase | 25.03.2019 | Translation filed | 25.03.2019 | National basic fee paid | 25.03.2019 | Search fee paid | 25.03.2019 | Designation fee(s) paid | 25.03.2019 | Examination fee paid | Examination procedure | 25.03.2019 | Examination requested [2019/27] | 16.10.2020 | Amendment by applicant (claims and/or description) | 18.10.2021 | Despatch of a communication from the examining division (Time limit: M04) | 23.02.2022 | Reply to a communication from the examining division | 08.01.2024 | Cancellation of oral proceeding that was planned for 23.01.2024 | 23.01.2024 | Date of oral proceedings (cancelled) | 15.02.2024 | Communication of intention to grant the patent | 27.03.2024 | Fee for grant paid | 27.03.2024 | Fee for publishing/printing paid | 27.03.2024 | Receipt of the translation of the claim(s) | Fees paid | Renewal fee | 26.08.2019 | Renewal fee patent year 03 | 25.08.2020 | Renewal fee patent year 04 | 23.08.2021 | Renewal fee patent year 05 | 25.08.2022 | Renewal fee patent year 06 | 25.08.2023 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 01.05.2024 | BG | 01.05.2024 | ES | 01.05.2024 | FI | 01.05.2024 | HR | 01.05.2024 | LV | 01.05.2024 | NL | 01.05.2024 | PL | 01.05.2024 | NO | 01.08.2024 | RS | 01.08.2024 | GR | 02.08.2024 | IS | 01.09.2024 | PT | 02.09.2024 | [2024/49] |
Former [2024/48] | AT | 01.05.2024 | |
BG | 01.05.2024 | ||
ES | 01.05.2024 | ||
FI | 01.05.2024 | ||
HR | 01.05.2024 | ||
NL | 01.05.2024 | ||
NO | 01.08.2024 | ||
GR | 02.08.2024 | ||
IS | 01.09.2024 | ||
PT | 02.09.2024 | ||
Former [2024/47] | BG | 01.05.2024 | |
FI | 01.05.2024 | ||
HR | 01.05.2024 | ||
NL | 01.05.2024 | ||
NO | 01.08.2024 | ||
GR | 02.08.2024 | ||
IS | 01.09.2024 | ||
PT | 02.09.2024 | ||
Former [2024/46] | BG | 01.05.2024 | |
FI | 01.05.2024 | ||
HR | 01.05.2024 | ||
NO | 01.08.2024 | ||
IS | 01.09.2024 | Documents cited: | Search | [XI]US2008068782 (MUCHOW DAVID J [US], et al) [X] 1 * abstract * * figures 1-15 * * paragraph [0070] - paragraph [0088] * [I] 2-10; | [XI]US2010060016 (HUNTER JEFFEREY ALLEN [US]) [X] 1,2 * abstract * * figures 1-6 * * paragraphs [0023] , [0 33] , [0040] , [0067] - [0073] - [0 45] * [I] 3-10; | [A]CN102390440 (CHONGXI LIU, et al) [A] 1-10 * the whole document *; | [XI]US2012299531 (PROSSER RONALD D [US], et al) [X] 1 * the whole document * [I] 2-10; | [XI]EP2889176 (DOOSAN HEAVY IND & CONSTR [KR]) [X] 1 * the whole document * [I] 2-10; | [A]CN105109466 (XIE ZICONG) [A] 1-10* the whole document *; | [XI]US2016036097 (LOPES DE SOUSA SILVA DAMASO [PT], et al) [X] 1 * the whole document * [I] 2-10 | International search | [A]CN101951008 (UNIV SOUTHEAST) [A] 1-10 * , entire document *; | [Y]CN102832662 (CHINA ELECTRIC POWER RES INST, et al) [Y] 1-10 * , description, paragraphs [0067]-[0086], and figures 1-7 *; | [A]CN202978395U (JIANGXI ELEC POWER RES INST, et al) [A] 1-10 * , entire document *; | [Y]CN203289114U (POTEVIO NEW ENERGY CO LTD, et al) [Y] 1-10 * , description, paragraphs [0021]-[0043], and figures 1-5 *; | [A]US2015328999 (DUREAU GUILLAUME [FR], et al) [A] 1-10* , entire document *; | [PX]CN205970910U (SHANGHAI NEXTEV AUTOMOBILE CO LTD) [PX] 1-10 * , description, paragraphs [0021]-[0030], and figures 1-2 * |