EP3536132 - A COMPACT SYSTEM FOR COUPLING RF POWER DIRECTLY INTO AN ACCELERATOR [Right-click to bookmark this link] | |||
Former [2019/37] | A COMPACT SYSTEM FOR COUPLING RF POWER DIRECTLY INTO RF LINACS | ||
[2021/44] | Status | No opposition filed within time limit Status updated on 20.01.2023 Database last updated on 21.03.2025 | |
Former | The patent has been granted Status updated on 11.02.2022 | ||
Former | Grant of patent is intended Status updated on 21.10.2021 | ||
Former | Request for examination was made Status updated on 09.08.2019 | ||
Former | The international publication has been made Status updated on 11.05.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Starfire Industries LLC 2109 South Oak Street Champaign, IL 61820 / US | [2019/37] | Inventor(s) | 01 /
STUBBERS, Robert A. 309 East Tomaras Avenue Savoy, Illinois 61874 / US | 02 /
JURCZYK, Brian E. 3108 Glenhill Place Champaign, Illinois 61822 / US | 03 /
HOULAHAN, JR., Thomas J. 2008 East Amber Lane 201 Urbana, Illinois 61802 / US | 04 /
POTTER, James M. 2245 47th Street Los Alamos, New Mexico 87544 / US | [2019/37] | Representative(s) | V.O. P.O. Box 87930 2508 DH Den Haag / NL | [2019/37] | Application number, filing date | 17867132.7 | 03.11.2017 | [2019/37] | WO2017US59968 | Priority number, date | US201662416900P | 03.11.2016 Original published format: US 201662416900 P | [2019/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018085680 | Date: | 11.05.2018 | Language: | EN | [2018/19] | Type: | A1 Application with search report | No.: | EP3536132 | Date: | 11.09.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.05.2018 takes the place of the publication of the European patent application. | [2019/37] | Type: | B1 Patent specification | No.: | EP3536132 | Date: | 16.03.2022 | Language: | EN | [2022/11] | Search report(s) | International search report - published on: | US | 11.05.2018 | (Supplementary) European search report - dispatched on: | EP | 27.05.2020 | Classification | IPC: | H05H7/02, H05H7/18, H05H7/22 | [2020/26] | CPC: |
H05H7/02 (EP,US);
H05H7/18 (US);
H05H7/22 (EP);
H01J3/027 (US);
H01J3/028 (US);
H05H2007/025 (EP,US);
H05H2007/227 (EP)
(-)
|
Former IPC [2019/37] | H05H7/02, H05H7/18 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/37] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | KOMPAKTES SYSTEM ZUR DIREKT EINKOPPLUNG VON HF-LEISTUNG IN EINEN BESCHLEUNIGER | [2021/44] | English: | A COMPACT SYSTEM FOR COUPLING RF POWER DIRECTLY INTO AN ACCELERATOR | [2021/44] | French: | SYSTÈME COMPACT DE COUPLAGE DIRECT DE PUISSANCE RADIOÉLECTRIQUE DANS UN ACCÉLÉRATEUR | [2021/44] |
Former [2019/37] | KOMPAKTES SYSTEM ZUR DIREKTEN KOPPLUNG VON HF-LEISTUNG IN HF-LINACS | ||
Former [2019/37] | A COMPACT SYSTEM FOR COUPLING RF POWER DIRECTLY INTO RF LINACS | ||
Former [2019/37] | SYSTÈME COMPACT DE COUPLAGE DIRECT DE PUISSANCE RADIOÉLECTRIQUE DANS DES ACCÉLÉRATEURS LINÉAIRES RF | Entry into regional phase | 28.05.2019 | National basic fee paid | 28.05.2019 | Search fee paid | 28.05.2019 | Designation fee(s) paid | 28.05.2019 | Examination fee paid | Examination procedure | 28.05.2019 | Examination requested [2019/37] | 17.12.2020 | Amendment by applicant (claims and/or description) | 22.10.2021 | Communication of intention to grant the patent | 04.02.2022 | Fee for grant paid | 04.02.2022 | Fee for publishing/printing paid | 04.02.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 19.12.2022 | No opposition filed within time limit [2023/08] | Fees paid | Renewal fee | 26.11.2019 | Renewal fee patent year 03 | 20.11.2020 | Renewal fee patent year 04 | 24.11.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.11.2017 | AL | 16.03.2022 | AT | 16.03.2022 | CY | 16.03.2022 | CZ | 16.03.2022 | DK | 16.03.2022 | EE | 16.03.2022 | ES | 16.03.2022 | FI | 16.03.2022 | HR | 16.03.2022 | LT | 16.03.2022 | LV | 16.03.2022 | MC | 16.03.2022 | MK | 16.03.2022 | MT | 16.03.2022 | PL | 16.03.2022 | RO | 16.03.2022 | RS | 16.03.2022 | SE | 16.03.2022 | SI | 16.03.2022 | SK | 16.03.2022 | SM | 16.03.2022 | TR | 16.03.2022 | BG | 16.06.2022 | NO | 16.06.2022 | GR | 17.06.2022 | IS | 16.07.2022 | PT | 18.07.2022 | IE | 03.11.2022 | LU | 03.11.2022 | BE | 30.11.2022 | [2024/42] |
Former [2024/29] | HU | 03.11.2017 | |
AL | 16.03.2022 | ||
AT | 16.03.2022 | ||
CY | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
MK | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
TR | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
IE | 03.11.2022 | ||
LU | 03.11.2022 | ||
BE | 30.11.2022 | ||
Former [2024/27] | HU | 03.11.2017 | |
AL | 16.03.2022 | ||
AT | 16.03.2022 | ||
CY | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
MK | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
IE | 03.11.2022 | ||
LU | 03.11.2022 | ||
BE | 30.11.2022 | ||
Former [2024/21] | HU | 03.11.2017 | |
AL | 16.03.2022 | ||
AT | 16.03.2022 | ||
CY | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
IE | 03.11.2022 | ||
LU | 03.11.2022 | ||
BE | 30.11.2022 | ||
Former [2024/18] | HU | 03.11.2017 | |
AL | 16.03.2022 | ||
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
IE | 03.11.2022 | ||
LU | 03.11.2022 | ||
BE | 30.11.2022 | ||
Former [2023/49] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
IE | 03.11.2022 | ||
LU | 03.11.2022 | ||
BE | 30.11.2022 | ||
Former [2023/48] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
IE | 03.11.2022 | ||
LU | 03.11.2022 | ||
Former [2023/37] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
LU | 03.11.2022 | ||
Former [2023/31] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2023/10] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2023/07] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2023/01] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2022/51] | AT | 16.03.2022 | |
CZ | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2022/50] | AT | 16.03.2022 | |
CZ | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
PT | 18.07.2022 | ||
Former [2022/49] | AT | 16.03.2022 | |
CZ | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
PT | 18.07.2022 | ||
Former [2022/48] | AT | 16.03.2022 | |
CZ | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
PT | 18.07.2022 | ||
Former [2022/47] | AT | 16.03.2022 | |
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
PT | 18.07.2022 | ||
Former [2022/39] | FI | 16.03.2022 | |
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
Former [2022/36] | HR | 16.03.2022 | |
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
Former [2022/35] | HR | 16.03.2022 | |
LT | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
Former [2022/33] | LT | 16.03.2022 | |
NO | 16.06.2022 | Documents cited: | Search | [AD]US5084682 (SWENSON DONALD A [US], et al) [AD] 1-21 * figures 3,4a, 5b,6,7,10-13c * * column 1, line 50 - column 16, line 32 *; | [A]JP2016110698 (TOSHIBA CORP, et al) [A] 1-21 * paragraph [0022] - paragraph [0023] * * page 1 *; | [A]CN204259269U (INST MODERN PHYSICS CAS) [A] 1-21 * abstract * * figure 2 *; | [A] - D.A SWENSON ET AL, "Close-coupled rf power systems for linacs", PROCEEDINGS OF THE LINEAR ACCELERATOR CONFERENCE 1990, United States, (19900912), XP055695969 [A] 1-21 * abstract * * figures 2-4 * | International search | [A]US5084682 (SWENSON DONALD A [US], et al) [A] 1-21 * , Fig 3, 6, abstract, col 8, In 50-col 9, In 3, col 11, In 10-46 *; | [A]US7242158 (WHITHAM KENNETH [US], et al) [A] 1-21 * , Fig 2. abstract. col 3. ln 57-67 *; | [A]US8779697 (BAURICHTER ARND [DK], et al) [A] 1-21 * , Fig 1, abstract, col 1, In 16-21, col 4, In 54-col 5, In 24 *; | [A] - PETERS, J. et al., "Internal Versus External RF Coupling into a Volume Source", Proceedings of EPAC 2002, Paris, France, (20020000), pages 1727 - 1729, URL: https://accelconf.web.cern.ch/accelconf/e02/PAPERS/THPRI025.pdf, (20180117), XP055501817 [A] 1-21 | by applicant | US5084682 |