blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3536132

EP3536132 - A COMPACT SYSTEM FOR COUPLING RF POWER DIRECTLY INTO AN ACCELERATOR [Right-click to bookmark this link]
Former [2019/37]A COMPACT SYSTEM FOR COUPLING RF POWER DIRECTLY INTO RF LINACS
[2021/44]
StatusNo opposition filed within time limit
Status updated on  20.01.2023
Database last updated on 21.03.2025
FormerThe patent has been granted
Status updated on  11.02.2022
FormerGrant of patent is intended
Status updated on  21.10.2021
FormerRequest for examination was made
Status updated on  09.08.2019
FormerThe international publication has been made
Status updated on  11.05.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Starfire Industries LLC
2109 South Oak Street
Champaign, IL 61820 / US
[2019/37]
Inventor(s)01 / STUBBERS, Robert A.
309 East Tomaras Avenue
Savoy, Illinois 61874 / US
02 / JURCZYK, Brian E.
3108 Glenhill Place
Champaign, Illinois 61822 / US
03 / HOULAHAN, JR., Thomas J.
2008 East Amber Lane 201
Urbana, Illinois 61802 / US
04 / POTTER, James M.
2245 47th Street
Los Alamos, New Mexico 87544 / US
 [2019/37]
Representative(s)V.O.
P.O. Box 87930
2508 DH Den Haag / NL
[2019/37]
Application number, filing date17867132.703.11.2017
[2019/37]
WO2017US59968
Priority number, dateUS201662416900P03.11.2016         Original published format: US 201662416900 P
[2019/37]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018085680
Date:11.05.2018
Language:EN
[2018/19]
Type: A1 Application with search report 
No.:EP3536132
Date:11.09.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 11.05.2018 takes the place of the publication of the European patent application.
[2019/37]
Type: B1 Patent specification 
No.:EP3536132
Date:16.03.2022
Language:EN
[2022/11]
Search report(s)International search report - published on:US11.05.2018
(Supplementary) European search report - dispatched on:EP27.05.2020
ClassificationIPC:H05H7/02, H05H7/18, H05H7/22
[2020/26]
CPC:
H05H7/02 (EP,US); H05H7/18 (US); H05H7/22 (EP);
H01J3/027 (US); H01J3/028 (US); H05H2007/025 (EP,US);
H05H2007/227 (EP) (-)
Former IPC [2019/37]H05H7/02, H05H7/18
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/37]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:KOMPAKTES SYSTEM ZUR DIREKT EINKOPPLUNG VON HF-LEISTUNG IN EINEN BESCHLEUNIGER[2021/44]
English:A COMPACT SYSTEM FOR COUPLING RF POWER DIRECTLY INTO AN ACCELERATOR[2021/44]
French:SYSTÈME COMPACT DE COUPLAGE DIRECT DE PUISSANCE RADIOÉLECTRIQUE DANS UN ACCÉLÉRATEUR[2021/44]
Former [2019/37]KOMPAKTES SYSTEM ZUR DIREKTEN KOPPLUNG VON HF-LEISTUNG IN HF-LINACS
Former [2019/37]A COMPACT SYSTEM FOR COUPLING RF POWER DIRECTLY INTO RF LINACS
Former [2019/37]SYSTÈME COMPACT DE COUPLAGE DIRECT DE PUISSANCE RADIOÉLECTRIQUE DANS DES ACCÉLÉRATEURS LINÉAIRES RF
Entry into regional phase28.05.2019National basic fee paid 
28.05.2019Search fee paid 
28.05.2019Designation fee(s) paid 
28.05.2019Examination fee paid 
Examination procedure28.05.2019Examination requested  [2019/37]
17.12.2020Amendment by applicant (claims and/or description)
22.10.2021Communication of intention to grant the patent
04.02.2022Fee for grant paid
04.02.2022Fee for publishing/printing paid
04.02.2022Receipt of the translation of the claim(s)
Opposition(s)19.12.2022No opposition filed within time limit [2023/08]
Fees paidRenewal fee
26.11.2019Renewal fee patent year 03
20.11.2020Renewal fee patent year 04
24.11.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU03.11.2017
AL16.03.2022
AT16.03.2022
CY16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
MK16.03.2022
MT16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
TR16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
IE03.11.2022
LU03.11.2022
BE30.11.2022
[2024/42]
Former [2024/29]HU03.11.2017
AL16.03.2022
AT16.03.2022
CY16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
MK16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
TR16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
IE03.11.2022
LU03.11.2022
BE30.11.2022
Former [2024/27]HU03.11.2017
AL16.03.2022
AT16.03.2022
CY16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
MK16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
IE03.11.2022
LU03.11.2022
BE30.11.2022
Former [2024/21]HU03.11.2017
AL16.03.2022
AT16.03.2022
CY16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
IE03.11.2022
LU03.11.2022
BE30.11.2022
Former [2024/18]HU03.11.2017
AL16.03.2022
AT16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
IE03.11.2022
LU03.11.2022
BE30.11.2022
Former [2023/49]AL16.03.2022
AT16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
IE03.11.2022
LU03.11.2022
BE30.11.2022
Former [2023/48]AL16.03.2022
AT16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
IE03.11.2022
LU03.11.2022
Former [2023/37]AL16.03.2022
AT16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
LU03.11.2022
Former [2023/31]AL16.03.2022
AT16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2023/10]AL16.03.2022
AT16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2023/07]AL16.03.2022
AT16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2023/01]AL16.03.2022
AT16.03.2022
CZ16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2022/51]AT16.03.2022
CZ16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2022/50]AT16.03.2022
CZ16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
PT18.07.2022
Former [2022/49]AT16.03.2022
CZ16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
PT18.07.2022
Former [2022/48]AT16.03.2022
CZ16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
PT18.07.2022
Former [2022/47]AT16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
PT18.07.2022
Former [2022/39]FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
RS16.03.2022
SE16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
Former [2022/36]HR16.03.2022
LT16.03.2022
LV16.03.2022
RS16.03.2022
SE16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
Former [2022/35]HR16.03.2022
LT16.03.2022
RS16.03.2022
SE16.03.2022
BG16.06.2022
NO16.06.2022
Former [2022/33]LT16.03.2022
NO16.06.2022
Documents cited:Search[AD]US5084682  (SWENSON DONALD A [US], et al) [AD] 1-21 * figures 3,4a, 5b,6,7,10-13c * * column 1, line 50 - column 16, line 32 *;
 [A]JP2016110698  (TOSHIBA CORP, et al) [A] 1-21 * paragraph [0022] - paragraph [0023] * * page 1 *;
 [A]CN204259269U  (INST MODERN PHYSICS CAS) [A] 1-21 * abstract * * figure 2 *;
 [A]  - D.A SWENSON ET AL, "Close-coupled rf power systems for linacs", PROCEEDINGS OF THE LINEAR ACCELERATOR CONFERENCE 1990, United States, (19900912), XP055695969 [A] 1-21 * abstract * * figures 2-4 *
International search[A]US5084682  (SWENSON DONALD A [US], et al) [A] 1-21 * , Fig 3, 6, abstract, col 8, In 50-col 9, In 3, col 11, In 10-46 *;
 [A]US7242158  (WHITHAM KENNETH [US], et al) [A] 1-21 * , Fig 2. abstract. col 3. ln 57-67 *;
 [A]US8779697  (BAURICHTER ARND [DK], et al) [A] 1-21 * , Fig 1, abstract, col 1, In 16-21, col 4, In 54-col 5, In 24 *;
 [A]  - PETERS, J. et al., "Internal Versus External RF Coupling into a Volume Source", Proceedings of EPAC 2002, Paris, France, (20020000), pages 1727 - 1729, URL: https://accelconf.web.cern.ch/accelconf/e02/PAPERS/THPRI025.pdf, (20180117), XP055501817 [A] 1-21
by applicantUS5084682
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.