EP3575764 - SENSOR ARRANGEMENT AND METHOD OF OPERATING A SENSOR ARRANGEMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.05.2023 Database last updated on 15.01.2025 | |
Former | The patent has been granted Status updated on 03.06.2022 | ||
Former | Grant of patent is intended Status updated on 20.02.2022 | ||
Former | Request for examination was made Status updated on 29.05.2020 | ||
Former | The application has been published Status updated on 01.11.2019 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Sciosense B.V. High Tech Campus 10 5656 AE Eindhoven / NL | [2020/51] |
Former [2019/49] | For all designated states AMS Sensors UK Limited Deanland House 160 Cowley Road Cambridge, Cambridgeshire CB4 0DL / GB | Inventor(s) | 01 /
Maccioni, Alberto Via Genova 488F 19123 La Spezia / IT | 02 /
Besling, Willem Frederik Adrianus Van Meursstraat 9 5615 JN Eindhoven / NL | 03 /
Wunnicke, Olaf Laagstraat 334 5654PR Eindhoven / NL | 04 /
Van der Avoort, Casper Ekenrooisestraat 14 5583 TG Waalre / NL | 05 /
Pijnenburg, Remco Henricus Wilhelmus Heuvelseweg 18 5528AE Hoogeloon / NL | 06 /
Singulani, Anderson Argenotstr. 50a/2 8047 Graz / AT | [2019/49] | Representative(s) | Epping - Hermann - Fischer Patentanwaltsgesellschaft mbH Schloßschmidstraße 5 80639 München / DE | [2019/49] | Application number, filing date | 18174624.9 | 28.05.2018 | [2019/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3575764 | Date: | 04.12.2019 | Language: | EN | [2019/49] | Type: | B1 Patent specification | No.: | EP3575764 | Date: | 06.07.2022 | Language: | EN | [2022/27] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 12.12.2018 | Classification | IPC: | G01L9/00, G01L27/00 | [2019/49] | CPC: |
G01L27/002 (EP);
G01L9/0072 (EP,US);
G01D5/24 (US);
G01L27/005 (US);
G01L27/007 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/27] |
Former [2019/49] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SENSORANORDNUNG UND VERFAHREN ZUM BETRIEB EINER SENSORANORDNUNG | [2019/49] | English: | SENSOR ARRANGEMENT AND METHOD OF OPERATING A SENSOR ARRANGEMENT | [2019/49] | French: | AGENCEMENT DE CAPTEUR ET PROCÉDÉ DE FONCTIONNEMENT | [2019/49] | Examination procedure | 27.05.2020 | Amendment by applicant (claims and/or description) | 27.05.2020 | Examination requested [2020/27] | 27.05.2020 | Date on which the examining division has become responsible | 21.02.2022 | Communication of intention to grant the patent | 24.05.2022 | Fee for grant paid | 24.05.2022 | Fee for publishing/printing paid | 24.05.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 11.04.2023 | No opposition filed within time limit [2023/24] | Fees paid | Renewal fee | 12.03.2020 | Renewal fee patent year 03 | 27.05.2021 | Renewal fee patent year 04 | 22.03.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 06.07.2022 | AT | 06.07.2022 | BG | 06.07.2022 | CZ | 06.07.2022 | DK | 06.07.2022 | EE | 06.07.2022 | ES | 06.07.2022 | FI | 06.07.2022 | HR | 06.07.2022 | IT | 06.07.2022 | LT | 06.07.2022 | LV | 06.07.2022 | MC | 06.07.2022 | NL | 06.07.2022 | PL | 06.07.2022 | RO | 06.07.2022 | RS | 06.07.2022 | SE | 06.07.2022 | SI | 06.07.2022 | SK | 06.07.2022 | SM | 06.07.2022 | NO | 06.10.2022 | GR | 07.10.2022 | IS | 06.11.2022 | PT | 07.11.2022 | [2024/51] |
Former [2024/11] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
IT | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2024/08] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/37] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/29] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/23] | AT | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/22] | AT | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/21] | DK | 06.07.2022 | |
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/20] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/12] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/11] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/10] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/09] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/08] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
NL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
Former [2023/06] | NL | 06.07.2022 | Documents cited: | Search | [XI]US2016131550 (BESLING WILLEM FREDERIK ADRIANUS [NL], et al) [X] 1-7,11-15 * the whole document *[I] 8-10 |