blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3450088

EP3450088 - WHEEL LIGHTWEIGHT MACHINING FIXTURE AND METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.05.2023
Database last updated on 15.01.2025
FormerThe patent has been granted
Status updated on  03.06.2022
FormerGrant of patent is intended
Status updated on  28.04.2022
FormerRequest for examination was made
Status updated on  01.02.2019
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Citic Dicastal Co., Ltd.
185 Longhai Ave.
Economic and Technological Development Zone
066011 Quinhuangdao, Heibei / CN
[2019/10]
Inventor(s)01 / Liu, Huiying
CITIC Dicastal Co.,Ltd
185 Longhai Ave. Qinhuangdao Economic &
Technological Development Zone
Qinhuangdao, Heibei 066011 / CN
02 / Li, Changhai
CITIC Dicastal Co.,Ltd
185 Longhai Ave. Qinhuangdao Economic &
Technological Development Zone
Qinhuangdao, Heibei 066011 / CN
03 / Cai, Weimin
CITIC Dicastal Co.,Ltd
185 Longhai Ave. Qinhuangdao Economic &
Technological Development Zone
Qinhuangdao, Heibei 066011 / CN
04 / Wang, Yajun
CITIC Dicastal Co.,Ltd
185 Longhai Ave. Qinhuangdao Economic &
Technological Development Zone
Qinhuangdao, Heibei 066011 / CN
 [2019/10]
Representative(s)Gong, Jinping
CocreateIP
Eggenfeldenerstraße 56
81929 München / DE
[2019/10]
Application number, filing date18190689.224.08.2018
[2019/10]
Priority number, dateCN20171074687627.08.2017         Original published format: CN201710746876
[2019/10]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3450088
Date:06.03.2019
Language:EN
[2019/10]
Type: B1 Patent specification 
No.:EP3450088
Date:06.07.2022
Language:EN
[2022/27]
Search report(s)(Supplementary) European search report - dispatched on:EP21.01.2019
ClassificationIPC:B23P13/02, B23B5/28
[2019/10]
CPC:
B23B5/28 (EP,US); B23B1/00 (CN); B23B3/10 (US);
B23B5/00 (CN); B23P13/02 (EP,US); B60B30/06 (US);
G01B17/02 (US); B23B13/02 (US); B23B2215/08 (EP,CN,US);
B23B2260/128 (EP,US); B23B2270/10 (EP,US); B60B2310/231 (US);
B60B2900/111 (US); B60B2900/112 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/10]
Validation statesMA14.12.2018
TitleGerman:LEICHTGEWICHTIGE RADBEARBEITUNGSBEFESTIGUNG UND -VERFAHREN[2019/10]
English:WHEEL LIGHTWEIGHT MACHINING FIXTURE AND METHOD[2019/10]
French:ACCESSOIRE ET PROCÉDÉ D'USINAGE LÉGER DE ROUE[2019/10]
Examination proceduredeletedDate on which the examining division has become responsible
24.08.2018Examination requested  [2019/10]
02.08.2019Amendment by applicant (claims and/or description)
06.12.2019Despatch of communication that the application is deemed to be withdrawn, reason: reply to the invitation to file a copy of earlier search results or a statement of non-availability not received in time
13.12.2019Request for decision received: Application is deemed to be withdrawn
03.01.2020Result of request for decision (Application is deemed to be withdrawn): Request accepted
29.04.2022Communication of intention to grant the patent
30.05.2022Fee for grant paid
30.05.2022Fee for publishing/printing paid
30.05.2022Receipt of the translation of the claim(s)
Opposition(s)11.04.2023No opposition filed within time limit [2023/24]
Fees paidRenewal fee
18.08.2020Renewal fee patent year 03
24.06.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU24.08.2018
AL06.07.2022
AT06.07.2022
BG06.07.2022
CY06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
IT06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
MK06.07.2022
MT06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
TR06.07.2022
IE24.08.2022
LU24.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
GB06.10.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
[2024/42]
Former [2024/34]HU24.08.2018
AL06.07.2022
AT06.07.2022
BG06.07.2022
CY06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
IT06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
MK06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
TR06.07.2022
IE24.08.2022
LU24.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
GB06.10.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2024/29]HU24.08.2018
AL06.07.2022
AT06.07.2022
CY06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
IT06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
MK06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
TR06.07.2022
IE24.08.2022
LU24.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
GB06.10.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2024/27]HU24.08.2018
AL06.07.2022
AT06.07.2022
CY06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
IT06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
MK06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
IE24.08.2022
LU24.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
GB06.10.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2024/21]HU24.08.2018
AL06.07.2022
AT06.07.2022
CY06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
IT06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
IE24.08.2022
LU24.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
GB06.10.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2024/18]HU24.08.2018
AL06.07.2022
AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
IT06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
IE24.08.2022
LU24.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
GB06.10.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2024/11]AL06.07.2022
AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
IT06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
IE24.08.2022
LU24.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
GB06.10.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/47]AL06.07.2022
AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
IE24.08.2022
LU24.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
GB06.10.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/42]AL06.07.2022
AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
IE24.08.2022
LU24.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/37]AL06.07.2022
AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
IE24.08.2022
LU24.08.2022
CH31.08.2022
LI31.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/33]AL06.07.2022
AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SK06.07.2022
SM06.07.2022
IE24.08.2022
LU24.08.2022
CH31.08.2022
LI31.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/29]AL06.07.2022
AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SK06.07.2022
SM06.07.2022
LU24.08.2022
CH31.08.2022
LI31.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/23]AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SK06.07.2022
SM06.07.2022
LU24.08.2022
CH31.08.2022
LI31.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/22]AT06.07.2022
CZ06.07.2022
DK06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SM06.07.2022
LU24.08.2022
CH31.08.2022
LI31.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/21]DK06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
PL06.07.2022
RS06.07.2022
SE06.07.2022
SM06.07.2022
LU24.08.2022
CH31.08.2022
LI31.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/20]ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
PL06.07.2022
RS06.07.2022
SE06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/12]ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
PL06.07.2022
RS06.07.2022
SE06.07.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/11]ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
PL06.07.2022
RS06.07.2022
SE06.07.2022
NO06.10.2022
GR07.10.2022
PT07.11.2022
Former [2023/10]ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
RS06.07.2022
SE06.07.2022
NO06.10.2022
GR07.10.2022
PT07.11.2022
Former [2023/09]ES06.07.2022
FI06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
RS06.07.2022
SE06.07.2022
NO06.10.2022
PT07.11.2022
Former [2023/08]ES06.07.2022
FI06.07.2022
LT06.07.2022
NL06.07.2022
RS06.07.2022
SE06.07.2022
NO06.10.2022
Former [2023/06]NL06.07.2022
Documents cited:Search[A]WO2006137088  (MAUS SPA [IT], et al) [A] 1,4 * page 9, lines 9-20; figure 3 *;
 [A]JP2007030069  (CHUO MOTOR WHEEL CO LTD, et al) [A] 1-4 * paragraphs [0037] - [0038]; figure - *;
 [A]WO2014087332  (MAMCZUR MAREK [GB], et al) [A] 1,4 * abstract *;
 [A]WO2017085491  (MCBRIDE PAUL [GB]) [A] 1,4* abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.