blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3643847

EP3643847 - FASTENING SYSTEM AND RAIL FOR A FASTENING SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.04.2024
Database last updated on 23.04.2024
FormerThe patent has been granted
Status updated on  05.05.2023
FormerGrant of patent is intended
Status updated on  02.01.2023
FormerExamination is in progress
Status updated on  09.12.2022
FormerGrant of patent is intended
Status updated on  09.08.2022
FormerExamination is in progress
Status updated on  13.05.2021
FormerRequest for examination was made
Status updated on  30.10.2020
FormerThe application has been published
Status updated on  27.03.2020
Most recent event   Tooltip12.04.2024No opposition filed within time limitpublished on 15.05.2024 [2024/20]
Applicant(s)For all designated states
Leviat GmbH
Liebigstraße 14
40764 Langenfeld / DE
For all designated states
Mannstaedt GmbH
Mendener Straße 51
53840 Troisdorf / DE
For all designated states
Fuchs Schraubenwerk GmbH
Bismarckstrasse 24
57076 Siegen / DE
[2022/08]
Former [2020/18]For all designated states
HALFEN GmbH
Liebigstrasse 14
40764 Langenfeld / DE
For all designated states
Mannstaedt GmbH
Mendener Straße 51
53840 Troisdorf / DE
For all designated states
Fuchs Schraubenwerk GmbH
Bismarckstrasse 24
57076 Siegen / DE
Inventor(s)01 / JUSCHKAT, Bastian
Elsterweg 15
40789 Monheim / DE
02 / HÄUSLER, Frank
Friedrichstr. 102
40217 Düsseldorf / DE
03 / PHILIPP, Franz-Dieter
Fröbelweg 15
53773 Hennef / DE
04 / DÜNKEL, Volker
Am Ellenberg 20
57074 Siegen / DE
05 / FUCHS, Tillmann
Im Neuenhof 21
57072 Siegen / DE
 [2020/18]
Representative(s)Reinhardt, Annette
Patentanwälte
Dipl.Ing. W. Jackisch & Partner mbB
Menzelstraße 40
70192 Stuttgart / DE
[2020/18]
Application number, filing date18202230.124.10.2018
[2020/18]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3643847
Date:29.04.2020
Language:DE
[2020/18]
Type: B1 Patent specification 
No.:EP3643847
Date:07.06.2023
Language:DE
[2023/23]
Search report(s)(Supplementary) European search report - dispatched on:EP12.04.2019
ClassificationIPC:E04B1/41, F16B37/04
[2020/18]
CPC:
E04B1/4107 (EP); F16B37/045 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/49]
Former [2020/18]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:BEFESTIGUNGSSYSTEM UND SCHIENE FÜR EIN BEFESTIGUNGSSYSTEM[2020/18]
English:FASTENING SYSTEM AND RAIL FOR A FASTENING SYSTEM[2020/18]
French:SYSTÈME DE FIXATION ET RAIL POUR UN SYSTÈME DE FIXATION[2020/18]
Examination procedure22.10.2020Amendment by applicant (claims and/or description)
22.10.2020Examination requested  [2020/49]
22.10.2020Date on which the examining division has become responsible
12.05.2021Despatch of a communication from the examining division (Time limit: M06)
15.11.2021Reply to a communication from the examining division
10.08.2022Communication of intention to grant the patent
08.12.2022Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
03.01.2023Communication of intention to grant the patent
25.04.2023Fee for grant paid
25.04.2023Fee for publishing/printing paid
25.04.2023Receipt of the translation of the claim(s)
Opposition(s)08.03.2024No opposition filed within time limit [2024/20]
Fees paidRenewal fee
23.10.2020Renewal fee patent year 03
25.10.2021Renewal fee patent year 04
25.10.2022Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ07.06.2023
EE07.06.2023
ES07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
GR08.09.2023
IS07.10.2023
PT09.10.2023
[2024/10]
Former [2024/08]ES07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
RS07.06.2023
SE07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
GR08.09.2023
Former [2024/03]ES07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
RS07.06.2023
SE07.06.2023
NO07.09.2023
GR08.09.2023
Former [2024/01]ES07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
RS07.06.2023
SE07.06.2023
NO07.09.2023
GR08.09.2023
Former [2023/51]ES07.06.2023
HR07.06.2023
RS07.06.2023
SE07.06.2023
NO07.09.2023
GR08.09.2023
Former [2023/50]ES07.06.2023
SE07.06.2023
NO07.09.2023
GR08.09.2023
Former [2023/48]ES07.06.2023
SE07.06.2023
NO07.09.2023
Former [2023/46]ES07.06.2023
Documents cited:Search[X]US1667533  (H. G. CARLSON) [X] 15 * page 1, line 59 - page 2, line 37 * * figure - *;
 [XAY]US1936223  (AWBREY SAMUEL C) [X] 15 * page 1, line 58 - page 2, paragraph 62 * * figure - * [A] 11-13 [Y] 1-10,14;
 [A]CA1181921  (NIGHTINGALE INTERLOC LIMITED) [A] 1-15 * page 5, line 1 - page 13, line 9 ** figure - *;
 [Y]US2016265213  (ZHANG ZHIHUI [US], et al) [Y] 1-10,14 * paragraph [0023] - paragraph [0039] * * figure - *;
 [A]CN108086484  (LUOYANG GUYUE RAILWAY TECH CO LTD) [A] 1-15 * figure - *
ExaminationCN201778398U
by applicantUS2010101175
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.