blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3654507

EP3654507 - MONITORABLE ELECTRICAL COMPONENT WITH AT LEAST ONE FUNCTIONAL PURPOSE AS CAPACITOR [Right-click to bookmark this link]
Former [2020/21]MONITORABLE ELECTRICAL COMPONENT WITH AT LEAST ONE FUNCTIONAL ALIGNMENT AS CAPACITOR
[2021/45]
StatusNo opposition filed within time limit
Status updated on  17.03.2023
Database last updated on 23.04.2024
FormerThe patent has been granted
Status updated on  08.04.2022
FormerGrant of patent is intended
Status updated on  16.12.2021
FormerExamination is in progress
Status updated on  16.04.2021
FormerRequest for examination was made
Status updated on  26.06.2020
FormerThe application has been published
Status updated on  17.04.2020
Most recent event   Tooltip19.04.2024Lapse of the patent in a contracting state
New state(s): CY
published on 22.05.2024 [2024/21]
Applicant(s)For all designated states
Siemens Aktiengesellschaft
Werner-von-Siemens-Straße 1
80333 München / DE
[2020/21]
Inventor(s)01 / Feil, Wolfgang
Münchshöf 1
92421 Schwandorf / DE
 [2020/21]
Representative(s)Siemens Patent Attorneys
Postfach 22 16 34
80506 München / DE
[N/P]
Application number, filing date18206768.616.11.2018
[2020/21]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3654507
Date:20.05.2020
Language:DE
[2020/21]
Type: B1 Patent specification 
No.:EP3654507
Date:11.05.2022
Language:DE
[2022/19]
Search report(s)(Supplementary) European search report - dispatched on:EP24.05.2019
ClassificationIPC:H02M1/32, H02M1/36, H02H9/00
[2020/21]
CPC:
H02M1/32 (EP); H02H9/001 (EP); H02M1/36 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/31]
Former [2020/21]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ÜBERWACHBARES ELEKTRISCHES BAUELEMENT MIT MINDESTENS EINER FUNKTIONALEN AUSRICHTUNG ALS KONDENSATOR[2020/21]
English:MONITORABLE ELECTRICAL COMPONENT WITH AT LEAST ONE FUNCTIONAL PURPOSE AS CAPACITOR[2021/45]
French:COMPOSANT ÉLECTRIQUE POUVANT ÊTRE SURVEILLÉ DOTÉ D'AU MOINS UN BUT FONCTIONNEL EN TANT QUE CONDENSATEUR[2021/45]
Former [2020/21]MONITORABLE ELECTRICAL COMPONENT WITH AT LEAST ONE FUNCTIONAL ALIGNMENT AS CAPACITOR
Former [2020/21]COMPOSANT ÉLECTRIQUE POUVANT ÊTRE SURVEILLÉ DOTÉ D'AU MOINS UN ALIGNEMENT FONCTIONNEL EN TANT QUE CONDENSATEUR
Examination procedure19.06.2020Examination requested  [2020/31]
19.06.2020Date on which the examining division has become responsible
20.11.2020Amendment by applicant (claims and/or description)
16.04.2021Despatch of a communication from the examining division (Time limit: M04)
23.07.2021Reply to a communication from the examining division
17.12.2021Communication of intention to grant the patent
04.04.2022Receipt of the translation of the claim(s)
05.04.2022Fee for grant paid
05.04.2022Fee for publishing/printing paid
Opposition(s)14.02.2023No opposition filed within time limit [2023/16]
Fees paidRenewal fee
18.11.2020Renewal fee patent year 03
19.11.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU16.11.2018
AL11.05.2022
CY11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
GB16.11.2022
IE16.11.2022
LU16.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
[2024/21]
Former [2024/18]HU16.11.2018
AL11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
GB16.11.2022
IE16.11.2022
LU16.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/49]AL11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
GB16.11.2022
IE16.11.2022
LU16.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/48]AL11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
GB16.11.2022
IE16.11.2022
LU16.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/47]AL11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
GB16.11.2022
LU16.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/37]AL11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
LU16.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/35]AL11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
CH30.11.2022
LI30.11.2022
Former [2023/31]AL11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/25]AL11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/17]AL11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/09]CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/07]DK11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
PL11.05.2022
RS11.05.2022
SE11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2022/51]ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
PL11.05.2022
RS11.05.2022
SE11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2022/50]ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
PL11.05.2022
RS11.05.2022
SE11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
PT12.09.2022
Former [2022/49]ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
SE11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
PT12.09.2022
Former [2022/48]ES11.05.2022
FI11.05.2022
LT11.05.2022
NL11.05.2022
SE11.05.2022
NO11.08.2022
PT12.09.2022
Former [2022/47]ES11.05.2022
FI11.05.2022
LT11.05.2022
SE11.05.2022
NO11.08.2022
PT12.09.2022
Documents cited:Search[XY]CN201069461Y  (ZHONGCHUAN ELECTRIC TECHNOLOGY [CN]) [X] 1 * abstract * [Y] 2-10,12-19,21-28,30-38;
 [XY]EP2400649  (SHIN KOBE ELECTRIC MACHINERY [JP]) [X] 1,11,20,29 * paragraphs [0017] , [0 23] , [0 26] , [0 33] , [0 36] , [0 42] , [0 46] , [0 54] , [0 56] , [0 57]; figures 1-6 * [Y] 2-10,12-19,21-28,30-38;
 [Y]US2012153973  (GUO DIANBO [SG]) [Y] 3,13,22,33* paragraphs [0022] , [0029]; figure 1 *;
 [Y]CN104578815  (FOSHAN MEICHUAN SCIENCE & TECHNOLOGY CO LTD) [Y] 2-10,12-19,21-28,30-38 * abstract *;
 [Y]CN206306853U  (SHENZHEN OPTIMUM BATTERY CO) [Y] 2-10,12-19,21-28,30-38 * abstract *;
 [XY]US2018134169  (LOFTUS MICHAEL EDWARD [US], et al) [X] 1,11,20,29 * paragraphs [0012] , [0 13] , [0 16] , [0 18] , [0 23] , [0 25] , [0 30]; figures 1-3 * [Y] 2-10,12-19,21-28,30-38;
 [Y]CN108068835  (SHIJIAZHUANG KING TRANSP EQUIPMENT CO LTD) [Y] 2-10,12-19,21-28,30-38 * abstract *;
 [XY]EP3379671  (SIEMENS AG [DE]) [X] 1 * paragraphs [0029] , [0 30] , [0 37] , [0 41]; figures 3-5 * [Y] 2-10,12-19,21-28,30-38
ExaminationEP2562937
 US2015180400
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.