EP3567760 - METHOD FOR CONTROLLING CROSS-LINK INTERFERENCE, AND APPARATUS THEREFOR [Right-click to bookmark this link] | Status | Examination is in progress Status updated on 04.02.2022 Database last updated on 22.04.2025 | |
Former | Request for examination was made Status updated on 11.10.2019 | ||
Former | The international publication has been made Status updated on 13.07.2018 | Most recent event Tooltip | 29.01.2025 | New entry: Renewal fee paid | Applicant(s) | For all designated states LG Electronics Inc. 128, Yeoui-daero Yeongdeungpo-gu Seoul 07336 / KR | [2019/46] | Inventor(s) | 01 /
KIM, Dongkyu IP Center LG Electronics Inc. 19 Yangjae-daero 11-gil Seocho-gu Seoul 06772 / KR | 02 /
YI, Yunjung IP Center LG Electronics Inc. 19 Yangjae-daero 11-gil Seocho-gu Seoul 06772 / KR | [2019/46] | Representative(s) | Frenkel, Matthias Alexander Wuesthoff & Wuesthoff Patentanwälte und Rechtsanwalt PartG mbB Schweigerstraße 2 81541 München / DE | [N/P] |
Former [2019/46] | Frenkel, Matthias Alexander Wuesthoff & Wuesthoff Patentanwälte PartG mbB Schweigerstrasse 2 81541 München / DE | Application number, filing date | 18736253.8 | 04.01.2018 | [2019/46] | WO2018KR00201 | Priority number, date | US201762443773P | 08.01.2017 Original published format: US 201762443773 P | [2019/46] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018128428 | Date: | 12.07.2018 | Language: | KO | [2018/28] | Type: | A1 Application with search report | No.: | EP3567760 | Date: | 13.11.2019 | Language: | EN | [2019/46] | Search report(s) | International search report - published on: | KR | 12.07.2018 | (Supplementary) European search report - dispatched on: | EP | 19.10.2020 | Classification | IPC: | H04J11/00, H04W56/00 | [2020/47] | CPC: |
H04W56/0005 (EP);
H04J11/0056 (KR);
H04B15/00 (US);
H04B17/345 (US);
H04J11/00 (EP);
H04J11/0053 (KR);
|
Former IPC [2019/46] | H04J11/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/46] | Title | German: | VERFAHREN ZUR STEUERUNG VON QUERVERBINDUNGSSTÖRUNGEN UND VORRICHTUNG DAFÜR | [2019/46] | English: | METHOD FOR CONTROLLING CROSS-LINK INTERFERENCE, AND APPARATUS THEREFOR | [2019/46] | French: | PROCÉDÉ DE COMMANDE D'INTERFÉRENCE DE LIAISON CROISÉE, ET APPAREIL ASSOCIÉ | [2019/46] | Entry into regional phase | 31.07.2019 | Translation filed | 31.07.2019 | National basic fee paid | 31.07.2019 | Search fee paid | 31.07.2019 | Designation fee(s) paid | 31.07.2019 | Examination fee paid | Examination procedure | 31.07.2019 | Examination requested [2019/46] | 16.04.2021 | Amendment by applicant (claims and/or description) | 04.02.2022 | Despatch of a communication from the examining division (Time limit: M04) | 27.05.2022 | Reply to a communication from the examining division | 15.02.2024 | Despatch of a communication from the examining division (Time limit: M04) | 07.06.2024 | Reply to a communication from the examining division | Fees paid | Renewal fee | 23.01.2020 | Renewal fee patent year 03 | 25.01.2021 | Renewal fee patent year 04 | 25.01.2022 | Renewal fee patent year 05 | 25.01.2023 | Renewal fee patent year 06 | 25.01.2024 | Renewal fee patent year 07 | 28.01.2025 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XA]US2012178482 (SEO HAN BYUL [KR], et al); | [YA]US2014160967 (GAO CHUNYAN [CN], et al); | International search | [Y]US2010254356 (TYNDERFELDT TOBIAS [SE], et al) [Y] 1, 3-8, 10-14 * See paragraphs [0001], [0003], [0040], [0067]-[0076]; and figures 5a-5b. *; | [Y]US2013301489 (SIROTKIN ALEXANDER [IL], et al) [Y] 7, 14 * See paragraphs [0046], [0101]-[0105]; claims 1-3: and figure 3. *; | [A]US2015333877 (RAHMAN IMADUR [SE], et al) [A] 1-14* See paragraphs [0008], [0031], [0044]-[0052]; and figures 1, 6a-6b. *; | [YA] - HUAWEI et al., "Discussion on TRP-to-TRP Interference Mitigation Schemes", 3GPP TSG RAN WG1 Meeting #86BIS R1-1608830, Lisbon, Portugal, (20161001), URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_86b/Docs/, XP051159157 [Y] 1, 3-8, 10-14 * See pages 1-2; and figures 1-2. * [A] 2, 9 | [Y] - HUAWEI et al., "Timing Alignment on Cross-link for Flexible Duplex", 3GPP TSG RAN WG1 Meeting #87 Rl -1611227, Reno, USA, (20161105), URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_87/Docs/, XP051189799 [Y] 3, 4, 10, 11 * See page 2. * | Examination | EP3010268 |