EP3680536 - INSERT AND JOINT FOR FLEXIBLE PIPES AND METHOD FOR FIXING A JOINT TO A FLEXIBLE PIPE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.05.2023 Database last updated on 15.01.2025 | |
Former | The patent has been granted Status updated on 03.06.2022 | ||
Former | Grant of patent is intended Status updated on 06.04.2022 | ||
Former | Request for examination was made Status updated on 15.01.2021 | ||
Former | The application has been published Status updated on 12.06.2020 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Techinit Srl Via Leonino Da Zara 16/18 35020 Albignasego (Padova) / IT | [2020/29] | Inventor(s) | 01 /
LAMENTI, RICCARDO Via Europa 30 35020 Albignasego (Padova) / IT | [2020/29] | Representative(s) | Marri, Luca, et al Dragotti & Associati S.r.l. Via Paris Bordone, 9 31100 Treviso / IT | [2020/29] | Application number, filing date | 20151155.7 | 10.01.2020 | [2020/29] | Priority number, date | IT20190000523 | 11.01.2019 Original published format: IT201900000523 | [2020/29] | Filing language | IT | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3680536 | Date: | 15.07.2020 | Language: | EN | [2020/29] | Type: | B1 Patent specification | No.: | EP3680536 | Date: | 06.07.2022 | Language: | EN | [2022/27] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.06.2020 | Classification | IPC: | F16L33/207, F16L33/24 | [2020/29] | CPC: |
F16L33/24 (EP);
F16L33/2076 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/07] |
Former [2020/29] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ANSCHLUSSSTUTZEN UND VERBINDUNG FÜR FLEXIBLE LEITUNGEN, UND VERFAHREN, UM EINE VERBINDUNG AN EINER FLEXIBLEN LEITUNG ZU BEFESTIGEN | [2020/29] | English: | INSERT AND JOINT FOR FLEXIBLE PIPES AND METHOD FOR FIXING A JOINT TO A FLEXIBLE PIPE | [2020/29] | French: | EMBOUT ET RACCORD POUR TUYAUX FLÉXIBLES, ET PROCÉDÉ POUR ATTACHER UN RACCORD À UN TUYAU FLÉXIBLE | [2020/29] | Examination procedure | 13.01.2021 | Amendment by applicant (claims and/or description) | 13.01.2021 | Examination requested [2021/07] | 13.01.2021 | Date on which the examining division has become responsible | 07.04.2022 | Communication of intention to grant the patent | 27.05.2022 | Fee for grant paid | 27.05.2022 | Fee for publishing/printing paid | 27.05.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 11.04.2023 | No opposition filed within time limit [2023/24] | Fees paid | Renewal fee | 17.01.2022 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 06.07.2022 | AT | 06.07.2022 | BG | 06.07.2022 | CZ | 06.07.2022 | DK | 06.07.2022 | EE | 06.07.2022 | FI | 06.07.2022 | HR | 06.07.2022 | IT | 06.07.2022 | LT | 06.07.2022 | LV | 06.07.2022 | MC | 06.07.2022 | NL | 06.07.2022 | PL | 06.07.2022 | RO | 06.07.2022 | RS | 06.07.2022 | SE | 06.07.2022 | SI | 06.07.2022 | SK | 06.07.2022 | SM | 06.07.2022 | NO | 06.10.2022 | GR | 07.10.2022 | IS | 06.11.2022 | PT | 07.11.2022 | IE | 10.01.2023 | LU | 10.01.2023 | BE | 31.01.2023 | CH | 31.01.2023 | LI | 31.01.2023 | [2024/51] |
Former [2024/29] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
IT | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
IE | 10.01.2023 | ||
LU | 10.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2024/11] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
IT | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
IE | 10.01.2023 | ||
LU | 10.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2024/08] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
IE | 10.01.2023 | ||
LU | 10.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/49] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
LU | 10.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/47] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
LU | 10.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/43] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
LU | 10.01.2023 | ||
Former [2023/37] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/29] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/23] | AT | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/22] | AT | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/21] | DK | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/20] | FI | 06.07.2022 | |
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/12] | FI | 06.07.2022 | |
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/11] | FI | 06.07.2022 | |
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/10] | FI | 06.07.2022 | |
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/09] | FI | 06.07.2022 | |
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/08] | FI | 06.07.2022 | |
LT | 06.07.2022 | ||
NL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
Former [2023/06] | NL | 06.07.2022 | Documents cited: | Search | [X]FR1372180 (AEROQUIP AG) [X] 1,6,13* figures 1-6 *; | [XI]GB2088001 (AEROQUIP AG) [X] 1,2,9-12 * figures 1-3 * [I] 3-5; | [XI]DE10126429 (HSI SCHLAUCH UND ARMATURENTECH [DE]) [X] 1,2,9 * figure 1 * [I] 3-5; | [XI]WO2018071352 (PARKER HANNIFIN CORP [US]) [X] 1,2,6,7,9-12 * figure 4 * [I] 3-5,13 |