EP4009419 - ENERGY STORAGE SYSTEM AND THERMAL MANAGEMENT METHOD FOR THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.12.2023 Database last updated on 04.12.2024 | |
Former | The patent has been granted Status updated on 06.01.2023 | ||
Former | Grant of patent is intended Status updated on 16.08.2022 | ||
Former | Request for examination was made Status updated on 06.05.2022 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Sungrow Power Supply Co., Ltd. No.1699 Xiyou Rd. New & High Technology Industrial Development Zone Hefei, Anhui 230088 / CN | [2023/06] |
Former [2022/23] | For all designated states Sungrow Power Supply Co., Ltd. No.1699 Xiyou Rd., New & High Technology Industrial Development Zone Hefei, Anhui 230088 / CN | Inventor(s) | 01 /
ZHOU, Jianjie Hefei, Anhui, 230088 / CN | [2022/23] | Representative(s) | Biallo, Dario, et al Barzanò & Zanardo S.p.A. Via Borgonuovo, 10 20121 Milano / IT | [N/P] |
Former [2022/23] | Biallo, Dario, et al Barzanò & Zanardo Milano S.p.A. Via Borgonuovo, 10 20121 Milano / IT | Application number, filing date | 21189434.0 | 03.08.2021 | [2022/23] | Priority number, date | CN202011385234 | 01.12.2020 Original published format: CN202011385234 | [2022/23] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP4009419 | Date: | 08.06.2022 | Language: | EN | [2022/23] | Type: | B1 Patent specification | No.: | EP4009419 | Date: | 08.02.2023 | Language: | EN | [2023/06] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 15.02.2022 | Classification | IPC: | H01M10/613, H01M10/615, H01M10/627, H01M10/63, H01M10/635, H01M10/655, H01M10/6556, H01M10/6567, H01M10/6561 | [2022/23] | CPC: |
H01M10/613 (EP,CN,US);
H01M10/6561 (EP,US);
H01M10/615 (EP,CN,US);
H01M10/627 (EP,CN);
H01M10/63 (EP,CN,US);
H01M10/633 (US);
H01M10/635 (EP,CN,US);
H01M10/655 (EP,CN);
H01M10/6556 (EP,CN,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/23] | Title | German: | ENERGIESPEICHERSYSTEM UND VERFAHREN ZUR THERMISCHES VERWALTUNG DAFÜR | [2022/23] | English: | ENERGY STORAGE SYSTEM AND THERMAL MANAGEMENT METHOD FOR THE SAME | [2022/23] | French: | SYSTÈME DE STOCKAGE D'ÉNERGIE ET SON PROCÉDÉ DE GESTION THERMIQUE | [2022/23] | Examination procedure | 20.04.2022 | Examination requested [2022/23] | 20.04.2022 | Date on which the examining division has become responsible | 17.08.2022 | Communication of intention to grant the patent | 22.12.2022 | Fee for grant paid | 22.12.2022 | Fee for publishing/printing paid | 22.12.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 09.11.2023 | No opposition filed within time limit [2024/03] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 08.02.2023 | BG | 08.02.2023 | CZ | 08.02.2023 | DK | 08.02.2023 | EE | 08.02.2023 | ES | 08.02.2023 | FI | 08.02.2023 | HR | 08.02.2023 | IT | 08.02.2023 | LT | 08.02.2023 | LV | 08.02.2023 | MC | 08.02.2023 | NL | 08.02.2023 | PL | 08.02.2023 | RO | 08.02.2023 | RS | 08.02.2023 | SE | 08.02.2023 | SI | 08.02.2023 | SK | 08.02.2023 | SM | 08.02.2023 | NO | 08.05.2023 | GR | 09.05.2023 | IS | 08.06.2023 | PT | 09.06.2023 | IE | 03.08.2023 | LU | 03.08.2023 | BE | 31.08.2023 | FR | 31.08.2023 | [2024/51] |
Former [2024/36] | AT | 08.02.2023 | |
CZ | 08.02.2023 | ||
DK | 08.02.2023 | ||
EE | 08.02.2023 | ||
ES | 08.02.2023 | ||
FI | 08.02.2023 | ||
HR | 08.02.2023 | ||
IT | 08.02.2023 | ||
LT | 08.02.2023 | ||
LV | 08.02.2023 | ||
MC | 08.02.2023 | ||
NL | 08.02.2023 | ||
PL | 08.02.2023 | ||
RO | 08.02.2023 | ||
RS | 08.02.2023 | ||
SE | 08.02.2023 | ||
SI | 08.02.2023 | ||
SK | 08.02.2023 | ||
SM | 08.02.2023 | ||
NO | 08.05.2023 | ||
GR | 09.05.2023 | ||
IS | 08.06.2023 | ||
PT | 09.06.2023 | ||
IE | 03.08.2023 | ||
LU | 03.08.2023 | ||
BE | 31.08.2023 | ||
FR | 31.08.2023 | ||
Former [2024/35] | AT | 08.02.2023 | |
CZ | 08.02.2023 | ||
DK | 08.02.2023 | ||
EE | 08.02.2023 | ||
ES | 08.02.2023 | ||
FI | 08.02.2023 | ||
HR | 08.02.2023 | ||
IT | 08.02.2023 | ||
LT | 08.02.2023 | ||
LV | 08.02.2023 | ||
MC | 08.02.2023 | ||
NL | 08.02.2023 | ||
PL | 08.02.2023 | ||
RO | 08.02.2023 | ||
RS | 08.02.2023 | ||
SE | 08.02.2023 | ||
SI | 08.02.2023 | ||
SK | 08.02.2023 | ||
SM | 08.02.2023 | ||
NO | 08.05.2023 | ||
GR | 09.05.2023 | ||
IS | 08.06.2023 | ||
PT | 09.06.2023 | ||
IE | 03.08.2023 | ||
LU | 03.08.2023 | ||
FR | 31.08.2023 | ||
Former [2024/33] | AT | 08.02.2023 | |
CZ | 08.02.2023 | ||
DK | 08.02.2023 | ||
EE | 08.02.2023 | ||
ES | 08.02.2023 | ||
FI | 08.02.2023 | ||
HR | 08.02.2023 | ||
IT | 08.02.2023 | ||
LT | 08.02.2023 | ||
LV | 08.02.2023 | ||
MC | 08.02.2023 | ||
NL | 08.02.2023 | ||
PL | 08.02.2023 | ||
RO | 08.02.2023 | ||
RS | 08.02.2023 | ||
SE | 08.02.2023 | ||
SI | 08.02.2023 | ||
SK | 08.02.2023 | ||
SM | 08.02.2023 | ||
NO | 08.05.2023 | ||
GR | 09.05.2023 | ||
IS | 08.06.2023 | ||
PT | 09.06.2023 | ||
IE | 03.08.2023 | ||
LU | 03.08.2023 | ||
Former [2024/27] | AT | 08.02.2023 | |
CZ | 08.02.2023 | ||
DK | 08.02.2023 | ||
EE | 08.02.2023 | ||
ES | 08.02.2023 | ||
FI | 08.02.2023 | ||
HR | 08.02.2023 | ||
IT | 08.02.2023 | ||
LT | 08.02.2023 | ||
LV | 08.02.2023 | ||
MC | 08.02.2023 | ||
NL | 08.02.2023 | ||
PL | 08.02.2023 | ||
RO | 08.02.2023 | ||
RS | 08.02.2023 | ||
SE | 08.02.2023 | ||
SI | 08.02.2023 | ||
SK | 08.02.2023 | ||
SM | 08.02.2023 | ||
NO | 08.05.2023 | ||
GR | 09.05.2023 | ||
IS | 08.06.2023 | ||
PT | 09.06.2023 | ||
LU | 03.08.2023 | ||
Former [2024/21] | AT | 08.02.2023 | |
CZ | 08.02.2023 | ||
DK | 08.02.2023 | ||
EE | 08.02.2023 | ||
ES | 08.02.2023 | ||
FI | 08.02.2023 | ||
HR | 08.02.2023 | ||
LT | 08.02.2023 | ||
LV | 08.02.2023 | ||
MC | 08.02.2023 | ||
NL | 08.02.2023 | ||
PL | 08.02.2023 | ||
RO | 08.02.2023 | ||
RS | 08.02.2023 | ||
SE | 08.02.2023 | ||
SI | 08.02.2023 | ||
SK | 08.02.2023 | ||
SM | 08.02.2023 | ||
NO | 08.05.2023 | ||
GR | 09.05.2023 | ||
IS | 08.06.2023 | ||
PT | 09.06.2023 | ||
LU | 03.08.2023 | ||
Former [2024/16] | AT | 08.02.2023 | |
CZ | 08.02.2023 | ||
DK | 08.02.2023 | ||
EE | 08.02.2023 | ||
ES | 08.02.2023 | ||
FI | 08.02.2023 | ||
HR | 08.02.2023 | ||
LT | 08.02.2023 | ||
LV | 08.02.2023 | ||
MC | 08.02.2023 | ||
NL | 08.02.2023 | ||
PL | 08.02.2023 | ||
RO | 08.02.2023 | ||
RS | 08.02.2023 | ||
SE | 08.02.2023 | ||
SI | 08.02.2023 | ||
SK | 08.02.2023 | ||
SM | 08.02.2023 | ||
NO | 08.05.2023 | ||
GR | 09.05.2023 | ||
IS | 08.06.2023 | ||
PT | 09.06.2023 | ||
Former [2024/11] | AT | 08.02.2023 | |
CZ | 08.02.2023 | ||
DK | 08.02.2023 | ||
EE | 08.02.2023 | ||
ES | 08.02.2023 | ||
FI | 08.02.2023 | ||
HR | 08.02.2023 | ||
LT | 08.02.2023 | ||
LV | 08.02.2023 | ||
NL | 08.02.2023 | ||
PL | 08.02.2023 | ||
RO | 08.02.2023 | ||
RS | 08.02.2023 | ||
SE | 08.02.2023 | ||
SI | 08.02.2023 | ||
SK | 08.02.2023 | ||
SM | 08.02.2023 | ||
NO | 08.05.2023 | ||
GR | 09.05.2023 | ||
IS | 08.06.2023 | ||
PT | 09.06.2023 | ||
Former [2023/50] | AT | 08.02.2023 | |
CZ | 08.02.2023 | ||
DK | 08.02.2023 | ||
EE | 08.02.2023 | ||
ES | 08.02.2023 | ||
FI | 08.02.2023 | ||
HR | 08.02.2023 | ||
LT | 08.02.2023 | ||
LV | 08.02.2023 | ||
NL | 08.02.2023 | ||
PL | 08.02.2023 | ||
RO | 08.02.2023 | ||
RS | 08.02.2023 | ||
SE | 08.02.2023 | ||
SK | 08.02.2023 | ||
SM | 08.02.2023 | ||
NO | 08.05.2023 | ||
GR | 09.05.2023 | ||
IS | 08.06.2023 | ||
PT | 09.06.2023 | ||
Former [2023/49] | AT | 08.02.2023 | |
CZ | 08.02.2023 | ||
DK | 08.02.2023 | ||
EE | 08.02.2023 | ||
ES | 08.02.2023 | ||
FI | 08.02.2023 | ||
HR | 08.02.2023 | ||
LT | 08.02.2023 | ||
LV | 08.02.2023 | ||
NL | 08.02.2023 | ||
PL | 08.02.2023 | ||
RO | 08.02.2023 | ||
RS | 08.02.2023 | ||
SE | 08.02.2023 | ||
SM | 08.02.2023 | ||
NO | 08.05.2023 | ||
GR | 09.05.2023 | ||
IS | 08.06.2023 | ||
PT | 09.06.2023 | ||
Former [2023/48] | AT | 08.02.2023 | |
DK | 08.02.2023 | ||
EE | 08.02.2023 | ||
ES | 08.02.2023 | ||
FI | 08.02.2023 | ||
HR | 08.02.2023 | ||
LT | 08.02.2023 | ||
LV | 08.02.2023 | ||
NL | 08.02.2023 | ||
PL | 08.02.2023 | ||
RS | 08.02.2023 | ||
SE | 08.02.2023 | ||
SM | 08.02.2023 | ||
NO | 08.05.2023 | ||
GR | 09.05.2023 | ||
IS | 08.06.2023 | ||
PT | 09.06.2023 | ||
Former [2023/46] | AT | 08.02.2023 | |
DK | 08.02.2023 | ||
ES | 08.02.2023 | ||
FI | 08.02.2023 | ||
HR | 08.02.2023 | ||
LT | 08.02.2023 | ||
LV | 08.02.2023 | ||
NL | 08.02.2023 | ||
PL | 08.02.2023 | ||
RS | 08.02.2023 | ||
SE | 08.02.2023 | ||
SM | 08.02.2023 | ||
NO | 08.05.2023 | ||
GR | 09.05.2023 | ||
IS | 08.06.2023 | ||
PT | 09.06.2023 | ||
Former [2023/39] | AT | 08.02.2023 | |
ES | 08.02.2023 | ||
FI | 08.02.2023 | ||
HR | 08.02.2023 | ||
LT | 08.02.2023 | ||
LV | 08.02.2023 | ||
NL | 08.02.2023 | ||
PL | 08.02.2023 | ||
RS | 08.02.2023 | ||
SE | 08.02.2023 | ||
NO | 08.05.2023 | ||
GR | 09.05.2023 | ||
IS | 08.06.2023 | ||
PT | 09.06.2023 | ||
Former [2023/38] | AT | 08.02.2023 | |
ES | 08.02.2023 | ||
FI | 08.02.2023 | ||
HR | 08.02.2023 | ||
LT | 08.02.2023 | ||
LV | 08.02.2023 | ||
NL | 08.02.2023 | ||
PL | 08.02.2023 | ||
RS | 08.02.2023 | ||
SE | 08.02.2023 | ||
NO | 08.05.2023 | ||
GR | 09.05.2023 | ||
PT | 09.06.2023 | ||
Former [2023/37] | AT | 08.02.2023 | |
ES | 08.02.2023 | ||
FI | 08.02.2023 | ||
HR | 08.02.2023 | ||
LT | 08.02.2023 | ||
LV | 08.02.2023 | ||
NL | 08.02.2023 | ||
RS | 08.02.2023 | ||
SE | 08.02.2023 | ||
NO | 08.05.2023 | ||
GR | 09.05.2023 | ||
PT | 09.06.2023 | ||
Former [2023/36] | AT | 08.02.2023 | |
ES | 08.02.2023 | ||
FI | 08.02.2023 | ||
HR | 08.02.2023 | ||
LT | 08.02.2023 | ||
LV | 08.02.2023 | ||
NL | 08.02.2023 | ||
RS | 08.02.2023 | ||
SE | 08.02.2023 | ||
NO | 08.05.2023 | ||
PT | 09.06.2023 | ||
Former [2023/35] | AT | 08.02.2023 | |
ES | 08.02.2023 | ||
HR | 08.02.2023 | ||
LT | 08.02.2023 | ||
NL | 08.02.2023 | ||
RS | 08.02.2023 | ||
NO | 08.05.2023 | ||
PT | 09.06.2023 | ||
Former [2023/34] | ES | 08.02.2023 | |
LT | 08.02.2023 | ||
RS | 08.02.2023 | ||
PT | 09.06.2023 | ||
Former [2023/33] | ES | 08.02.2023 | |
LT | 08.02.2023 | Documents cited: | Search | [A]JP6071344B (KANSAI ELECTRIC POWER CO; KAWASAKI HEAVY IND LTD) [A] 1-15 * the whole document *; | [A]CN106972220 (YANGZHOU SAFE NEW ENERGY TECH CO LTD) [A] 1-15 * the whole document *; | [A]US2020313257 (NARUKE TOSHIAKI [JP], et al) [A] 1-15* the whole document * |