EP3926873 - WIRELESS COMMUNICATION METHOD, TERMINAL DEVICE AND NETWORK DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.05.2024 Database last updated on 15.01.2025 | |
Former | The patent has been granted Status updated on 09.06.2023 | ||
Former | Grant of patent is intended Status updated on 06.03.2023 | ||
Former | Request for examination was made Status updated on 17.06.2022 | ||
Former | The application has been published Status updated on 19.11.2021 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. No. 18 Haibin Road Wusha, Chang'an Dongguan, Guangdong 523860 / CN | [2021/51] | Inventor(s) | 01 /
TANG, Hai Guangdong, 523860 / CN | [2021/51] | Representative(s) | Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB Martin-Greif-Strasse 1 80336 München / DE | [2021/51] | Application number, filing date | 21190787.8 | 27.07.2017 | [2021/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3926873 | Date: | 22.12.2021 | Language: | EN | [2021/51] | Type: | B1 Patent specification | No.: | EP3926873 | Date: | 12.07.2023 | Language: | EN | [2023/28] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.11.2021 | Classification | IPC: | H04L1/18, H04W28/10, H04L1/08, H04L1/22 | [2021/51] | CPC: |
H04L1/08 (EP,IL,RU);
H04L1/18 (IL);
H04W28/10 (EP,CN,IL,KR);
H04L1/1812 (CN,IL,KR,RU,US);
H04W28/12 (IL,US);
H04L1/22 (EP,IL,RU);
H04L5/0082 (IL,US);
H04W28/04 (IL,KR);
H04W76/30 (IL,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/29] |
Former [2021/51] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | DRAHTLOSKOMMUNIKATIONSVERFAHREN, ENDGERÄTEVORRICHTUNG UND NETZWERKVORRICHTUNG | [2021/51] | English: | WIRELESS COMMUNICATION METHOD, TERMINAL DEVICE AND NETWORK DEVICE | [2021/51] | French: | PROCÉDÉ DE COMMUNICATION SANS FIL, DISPOSITIF TERMINAL ET DISPOSITIF DE RÉSEAU | [2021/51] | Examination procedure | 14.06.2022 | Amendment by applicant (claims and/or description) | 14.06.2022 | Examination requested [2022/29] | 14.06.2022 | Date on which the examining division has become responsible | 07.03.2023 | Communication of intention to grant the patent | 02.06.2023 | Fee for grant paid | 02.06.2023 | Fee for publishing/printing paid | 02.06.2023 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP17919586.2 / EP3637658 | Opposition(s) | 15.04.2024 | No opposition filed within time limit [2024/25] | Fees paid | Renewal fee | 11.08.2021 | Renewal fee patent year 03 | 11.08.2021 | Renewal fee patent year 04 | 11.08.2021 | Renewal fee patent year 05 | 21.07.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 12.07.2023 | BG | 12.07.2023 | CZ | 12.07.2023 | DK | 12.07.2023 | EE | 12.07.2023 | ES | 12.07.2023 | FI | 12.07.2023 | HR | 12.07.2023 | IT | 12.07.2023 | LT | 12.07.2023 | LV | 12.07.2023 | MC | 12.07.2023 | NL | 12.07.2023 | PL | 12.07.2023 | RO | 12.07.2023 | RS | 12.07.2023 | SE | 12.07.2023 | SI | 12.07.2023 | SK | 12.07.2023 | SM | 12.07.2023 | IE | 27.07.2023 | LU | 27.07.2023 | BE | 31.07.2023 | CH | 31.07.2023 | NO | 12.10.2023 | GR | 13.10.2023 | IS | 12.11.2023 | PT | 13.11.2023 | [2024/51] |
Former [2024/36] | AT | 12.07.2023 | |
CZ | 12.07.2023 | ||
DK | 12.07.2023 | ||
EE | 12.07.2023 | ||
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
IT | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
MC | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RO | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SI | 12.07.2023 | ||
SK | 12.07.2023 | ||
SM | 12.07.2023 | ||
IE | 27.07.2023 | ||
LU | 27.07.2023 | ||
BE | 31.07.2023 | ||
CH | 31.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/33] | AT | 12.07.2023 | |
CZ | 12.07.2023 | ||
DK | 12.07.2023 | ||
EE | 12.07.2023 | ||
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
IT | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
MC | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RO | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SK | 12.07.2023 | ||
SM | 12.07.2023 | ||
IE | 27.07.2023 | ||
LU | 27.07.2023 | ||
BE | 31.07.2023 | ||
CH | 31.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/27] | AT | 12.07.2023 | |
CZ | 12.07.2023 | ||
DK | 12.07.2023 | ||
EE | 12.07.2023 | ||
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
IT | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
MC | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RO | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SK | 12.07.2023 | ||
SM | 12.07.2023 | ||
LU | 27.07.2023 | ||
BE | 31.07.2023 | ||
CH | 31.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/23] | AT | 12.07.2023 | |
CZ | 12.07.2023 | ||
DK | 12.07.2023 | ||
EE | 12.07.2023 | ||
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
MC | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RO | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SK | 12.07.2023 | ||
SM | 12.07.2023 | ||
LU | 27.07.2023 | ||
BE | 31.07.2023 | ||
CH | 31.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/22] | AT | 12.07.2023 | |
CZ | 12.07.2023 | ||
DK | 12.07.2023 | ||
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RO | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SM | 12.07.2023 | ||
LU | 27.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/20] | AT | 12.07.2023 | |
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SM | 12.07.2023 | ||
LU | 27.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/18] | AT | 12.07.2023 | |
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
LU | 27.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/10] | AT | 12.07.2023 | |
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/09] | AT | 12.07.2023 | |
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
LT | 12.07.2023 | ||
NL | 12.07.2023 | ||
SE | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
Former [2024/08] | LT | 12.07.2023 | |
NL | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
Former [2024/05] | NL | 12.07.2023 | Documents cited: | Search | [A] - SHARP, "PDCP Duplication in CA", vol. RAN WG2, no. Qingdao, China; 20170627 - 20170629, (20170616), 3GPP DRAFT; R2-1706791 PDCP DUPLICATION IN CA, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_AHs/2017_06_NR/Docs/, (20170616), XP051306598 [A] 1-15 * pages 3-5 * | [A] - NOKIA ET AL, "Duplication Impacts to MAC", vol. RAN WG2, no. Hangzhou, China; 20170515 - 20170519, (20170514), 3GPP DRAFT; R2-1704272 DUPLICATION IMPACTS TO MAC, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20170514), XP051274850 [A] 1-15 * pages 1-2 * | [A] - ERICSSON, "Controlling of duplication in case of CA", vol. RAN WG2, no. Spokane, USA; 20170403 - 20170407, (20170403), 3GPP DRAFT; R2-1702753 - CONTROLLING OF DUPLICATION IN CASE OF CA, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRAN, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20170403), XP051244741 [A] 1-15 * pages 1-3 * |