blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1055637

EP1055637 - Synthesis gas production by steam reforming [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.09.2006
Database last updated on 14.06.2024
Most recent event   Tooltip05.12.2008Lapse of the patent in a contracting state
New state(s): CY
published on 07.01.2009  [2009/02]
Applicant(s)For all designated states
Haldor Topsøe A/S
Nymøllevej 55
2800 Kgs. Lyngby / DK
[N/P]
Former [2000/48]For all designated states
Haldor Topsoe A/S
Nymollevej 55
2800 Kgs. Lyngby / DK
Inventor(s)01 / Christensen, Peter Seier
Glasvej 7, 1.tv.
2400 Copenhagen NV / DK
02 / Hansen, Tommy
Hjaltesvej 6
3080 Tikob / DK
03 / Hansen, Viggo Lucassen
Botoftevej 12
2700 Bronshoj / DK
04 / Andersen, Lars Ejby
Dyresovej 11
3000 Helsingor / DK
[2000/48]
Representative(s)Zimmer, Franz-Josef, et al
Grünecker Kinkeldey
Stockmair & Schwanhäusser
Anwaltssozietät
Leopoldstrasse 4
80802 München / DE
[N/P]
Former [2005/36]Zimmer, Franz-Josef, et al
Grünecker, Kinkeldey, Stockmair & Schwanhäusser Anwaltssozietät Maximilianstrasse 58
80538 München / DE
Application number, filing date00108369.017.04.2000
[2000/48]
Priority number, dateUS19990136398P27.05.1999         Original published format: US 136398 P
[2000/48]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP1055637
Date:29.11.2000
Language:EN
[2000/48]
Type: B1 Patent specification 
No.:EP1055637
Date:02.11.2005
Language:EN
[2005/44]
Search report(s)(Supplementary) European search report - dispatched on:EP13.09.2000
ClassificationIPC:C01B3/38
[2000/48]
CPC:
B01J35/56 (EP,US); C01B3/26 (KR); B01J12/007 (EP,US);
B01J19/2415 (EP,US); B01J8/06 (EP,US); C01B3/38 (EP,US);
C01B3/384 (EP,US); B01J2208/0069 (EP,US); B01J2219/0236 (EP,US);
C01B2203/0233 (EP,US); C01B2203/0805 (EP,US); C01B2203/0811 (EP,US);
C01B2203/1029 (EP,US); C01B2203/1035 (EP,US); C01B2203/1082 (EP,US);
Y02P20/52 (EP,US) (-)
Designated contracting statesAT,   BE,   CH,   CY,   DE,   DK,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE [2000/48]
TitleGerman:Synthesegasherstellung durch Dampfreformierung[2000/48]
English:Synthesis gas production by steam reforming[2000/48]
French:Production de gaz de synthèse par réformage à la vapeur[2000/48]
Examination procedure29.05.2001Examination requested  [2001/30]
03.06.2002Despatch of a communication from the examining division (Time limit: M04)
02.10.2002Reply to a communication from the examining division
20.05.2005Communication of intention to grant the patent
24.08.2005Fee for grant paid
24.08.2005Fee for publishing/printing paid
Divisional application(s)EP05013703.3  / EP1584603
Opposition(s)03.08.2006No opposition filed within time limit [2006/41]
Fees paidRenewal fee
02.05.2002Renewal fee patent year 03
02.05.2003Renewal fee patent year 04
03.05.2004Renewal fee patent year 05
02.05.2005Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT02.11.2005
CH02.11.2005
CY02.11.2005
FI02.11.2005
LI02.11.2005
DK02.02.2006
GR02.02.2006
SE02.02.2006
PT03.04.2006
IE17.04.2006
LU17.04.2006
MC30.04.2006
[2009/02]
Former [2008/36]AT02.11.2005
CH02.11.2005
FI02.11.2005
LI02.11.2005
DK02.02.2006
GR02.02.2006
SE02.02.2006
PT03.04.2006
IE17.04.2006
LU17.04.2006
MC30.04.2006
Former [2007/45]AT02.11.2005
CH02.11.2005
FI02.11.2005
LI02.11.2005
DK02.02.2006
GR02.02.2006
SE02.02.2006
PT03.04.2006
IE17.04.2006
MC30.04.2006
Former [2007/35]AT02.11.2005
CH02.11.2005
FI02.11.2005
IT02.11.2005
LI02.11.2005
DK02.02.2006
GR02.02.2006
SE02.02.2006
PT03.04.2006
IE17.04.2006
MC30.04.2006
Former [2007/12]AT02.11.2005
CH02.11.2005
FI02.11.2005
LI02.11.2005
DK02.02.2006
GR02.02.2006
SE02.02.2006
PT03.04.2006
IE17.04.2006
MC30.04.2006
Former [2007/07]AT02.11.2005
CH02.11.2005
FI02.11.2005
LI02.11.2005
DK02.02.2006
GR02.02.2006
SE02.02.2006
PT03.04.2006
MC30.04.2006
Former [2006/48]AT02.11.2005
CH02.11.2005
FI02.11.2005
LI02.11.2005
DK02.02.2006
GR02.02.2006
SE02.02.2006
PT03.04.2006
Former [2006/38]AT02.11.2005
CH02.11.2005
FI02.11.2005
LI02.11.2005
DK02.02.2006
GR02.02.2006
SE02.02.2006
Former [2006/34]AT02.11.2005
CH02.11.2005
FI02.11.2005
LI02.11.2005
DK02.02.2006
SE02.02.2006
Former [2006/33]CH02.11.2005
FI02.11.2005
LI02.11.2005
SE02.02.2006
Former [2006/27]FI02.11.2005
SE02.02.2006
Former [2006/23]FI02.11.2005
Documents cited:Search[AD]JPS59205332  ;
 [A]FR2333571  (INST NAWOZOW SZTUCZNYCH [PL]) [A] 1 * claim 1 *;
 [A]US5521139  (BROECKER FRANZ J [DE], et al) [A] 1 * example 1 *;
 [A]DE19534433  (DAIMLER BENZ AG [DE]) [A] 1 * column 3, line 49 - column 4, line 41 *;
 [AD]EP0855366  (HALDOR TOPSOE AS [DK]) [AD] 1* claim 1 *
 [AD]  - PATENT ABSTRACTS OF JAPAN, (19850330), vol. 009, no. 071, Database accession no. (C - 272), & JP59205332 A 19841120 (MITSUBISHI JUKOGYO KK) [AD] 1 * abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.