blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1181981

EP1181981 - Modular lining for grinding mill and method to assemble and install it [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  20.07.2007
Database last updated on 19.10.2024
Most recent event   Tooltip20.07.2007Application deemed to be withdrawnpublished on 22.08.2007  [2007/34]
Applicant(s)For all designated states
Industrie Bitossi S.p.A.
Via Pietramarina 53
50053 Sovigliana Vinci (Province of Firenze) / IT
[2002/09]
Inventor(s)01 / Bocini, Loriano
Via Botinaccio 15
50056 Montelupo Fiorentino / IT
02 / Boldrini, Manuelo
Via Calvi 44
50059 Vinci (Province of Firenze) / IT
 [2002/09]
Representative(s)Passini, Angelo
Notarbartolo & Gervasi S.p.A.
Corso di Porta Vittoria, 9
20122 Milano / IT
[N/P]
Former [2002/09]Passini, Angelo
NOTARBARTOLO & GERVASI S. R. L., Corso di Porta Vittoria, 9
20122 Milano / IT
Application number, filing date00117128.910.08.2000
[2002/09]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP1181981
Date:27.02.2002
Language:EN
[2002/09]
Search report(s)(Supplementary) European search report - dispatched on:EP16.01.2001
ClassificationIPC:B02C17/22
[2002/09]
CPC:
B02C17/22 (EP)
Designated contracting statesAT,   BE,   CH,   CY,   DE,   DK,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE [2002/09]
TitleGerman:Modulare Mühlenauskleidung und Verfahren zu deren Zusammenbau und Montage[2002/09]
English:Modular lining for grinding mill and method to assemble and install it[2002/09]
French:Revêtement modulaire pour broyeur et méthode de son assemblage et montage[2002/09]
Examination procedure22.08.2002Examination requested  [2002/43]
12.09.2006Amendment by applicant (claims and/or description)
13.10.2006Despatch of a communication from the examining division (Time limit: M04)
24.02.2007Application deemed to be withdrawn, date of legal effect  [2007/34]
03.04.2007Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2007/34]
Fees paidRenewal fee
29.07.2002Renewal fee patent year 03
30.07.2003Renewal fee patent year 04
22.07.2004Renewal fee patent year 05
28.07.2005Renewal fee patent year 06
20.09.2006Renewal fee patent year 07
Penalty fee
Additional fee for renewal fee
31.08.200607   M06   Fee paid on   20.09.2006
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[Y]US2611546  (EJNAR POSSELT) [Y] 2 * column 3, line 38 - column 4, line 45; figures 2,3 *;
 [Y]GB1105017  (TRELLEBORGS GUMMIFABRIKS AB) [Y] 2,12,13 * the whole document *;
 [XAY]US3462090  (LANDES BENJAMIN DANIEL, et al) [X] 1,11,14,16 * column 3, line 32 - column 4, line 64; figures 2,3 * [A] 3-9,15 [Y] 2,10,12,13;
 [A]FR2131454  (CONTINENTAL GUMMI WERKE AG) [A] 5,6,8,9,12,15* figure 1 *;
 [Y]US4289279  (BRANDT BERTIL) [Y] 10 * column 4, line 58 - line 62; figure 5 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.