EP1047280 - Communication systems [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.06.2011 Database last updated on 27.07.2024 | Most recent event Tooltip | 17.05.2013 | Lapse of the patent in a contracting state New state(s): LU | published on 19.06.2013 [2013/25] | Applicant(s) | For all designated states Ericsson AB Torshamnsgatan 23 164 80 Stockholm / SE | [2010/19] |
Former [2007/02] | For all designated states Ericsson AB Torshamnsgaten 23 Stockholm / SE | ||
Former [2006/36] | For all designated states Ericsson AB Torshamnsgaten 23 164 83 Stockholm / SE | ||
Former [2006/34] | For all designated states M(DGP1) LTD New Century Park PO Box 53 Coventry CV3 1HJ / GB | ||
Former [2003/34] | For all designated states Marconi UK Intellectual Property Ltd New Century Park P.O. Box 53 Coventry, CV3 1HJ / GB | ||
Former [2000/43] | For all designated states Marconi Communications Limited New Century Park, P.O. Box 53 Coventry, CV3 1HJ / GB | Inventor(s) | 01 /
Proctor, Richard John 28 Diprose Road, Corfe Mullen Wimborne, Dorset BH21 3QY / GB | [2000/43] | Representative(s) | Stasiewski, Piotr Grzegorz, et al Ericsson Limited Patent Unit UK Unit 4 Midleton Gate Guildford Business Park Guildford, Surrey GU2 8SG / GB | [N/P] |
Former [2006/52] | Stasiewski, Piotr Grzegorz, et al Ericsson Limited Intellectual Property Group Maplewood Chineham Business Park Basingstoke Hampshire RG24 8YB / GB | ||
Former [2005/23] | Stasiewski, Piotr Grzegorz Marconi Intellectual Property New Century Park Post Point 51 Coventry, West Midlands CV3 1HJ / GB | ||
Former [2000/43] | Hoste, Colin Francis Marconi Intellectual Property Waterhouse Lane Chelmsford Essex CM1 2QX / GB | Application number, filing date | 00302489.0 | 27.03.2000 | [2000/43] | Priority number, date | GB19990008848 | 19.04.1999 Original published format: GB 9908848 | [2000/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP1047280 | Date: | 25.10.2000 | Language: | EN | [2000/43] | Type: | A3 Search report | No.: | EP1047280 | Date: | 27.08.2003 | [2003/35] | Type: | B1 Patent specification | No.: | EP1047280 | Date: | 28.07.2010 | Language: | EN | [2010/30] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 14.07.2003 | Classification | IPC: | H04Q11/04 | [2000/43] | CPC: |
H04Q11/0478 (EP,US);
H04L2012/5613 (EP,US);
H04L2012/5656 (EP,US)
| Designated contracting states | AT, BE, CH, CY, DE, DK, ES, FI, FR, GB, GR, IE, IT, LI, LU, MC, NL, PT, SE [2000/43] | Title | German: | Kommunikationssystemen | [2000/43] | English: | Communication systems | [2000/43] | French: | Systèmes de communication | [2000/43] | Examination procedure | 26.02.2004 | Examination requested [2004/18] | 14.12.2004 | Despatch of a communication from the examining division (Time limit: M04) | 06.04.2005 | Reply to a communication from the examining division | 30.03.2010 | Communication of intention to grant the patent | 09.06.2010 | Fee for grant paid | 09.06.2010 | Fee for publishing/printing paid | Opposition(s) | 29.04.2011 | No opposition filed within time limit [2011/27] | Fees paid | Renewal fee | 15.03.2002 | Renewal fee patent year 03 | 20.03.2003 | Renewal fee patent year 04 | 29.03.2004 | Renewal fee patent year 05 | 31.03.2005 | Renewal fee patent year 06 | 31.03.2006 | Renewal fee patent year 07 | 08.05.2007 | Renewal fee patent year 08 | 27.03.2008 | Renewal fee patent year 09 | 31.03.2008 | Renewal fee patent year 10 | 25.03.2010 | Renewal fee patent year 11 | Penalty fee | Additional fee for renewal fee | 31.03.2007 | 08   M06   Fee paid on   08.05.2007 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 28.07.2010 | BE | 28.07.2010 | CY | 28.07.2010 | DK | 28.07.2010 | FI | 28.07.2010 | IT | 28.07.2010 | NL | 28.07.2010 | SE | 28.07.2010 | GR | 29.10.2010 | ES | 08.11.2010 | PT | 29.11.2010 | IE | 27.03.2011 | LU | 27.03.2011 | CH | 31.03.2011 | LI | 31.03.2011 | MC | 31.03.2011 | [2013/25] |
Former [2012/08] | AT | 28.07.2010 | |
BE | 28.07.2010 | ||
CY | 28.07.2010 | ||
DK | 28.07.2010 | ||
FI | 28.07.2010 | ||
IT | 28.07.2010 | ||
NL | 28.07.2010 | ||
SE | 28.07.2010 | ||
GR | 29.10.2010 | ||
ES | 08.11.2010 | ||
PT | 29.11.2010 | ||
IE | 27.03.2011 | ||
CH | 31.03.2011 | ||
LI | 31.03.2011 | ||
MC | 31.03.2011 | ||
Former [2012/07] | AT | 28.07.2010 | |
BE | 28.07.2010 | ||
CY | 28.07.2010 | ||
DK | 28.07.2010 | ||
FI | 28.07.2010 | ||
IT | 28.07.2010 | ||
NL | 28.07.2010 | ||
SE | 28.07.2010 | ||
GR | 29.10.2010 | ||
ES | 08.11.2010 | ||
PT | 29.11.2010 | ||
CH | 31.03.2011 | ||
LI | 31.03.2011 | ||
MC | 31.03.2011 | ||
Former [2011/49] | AT | 28.07.2010 | |
BE | 28.07.2010 | ||
CY | 28.07.2010 | ||
DK | 28.07.2010 | ||
FI | 28.07.2010 | ||
IT | 28.07.2010 | ||
NL | 28.07.2010 | ||
SE | 28.07.2010 | ||
GR | 29.10.2010 | ||
ES | 08.11.2010 | ||
PT | 29.11.2010 | ||
MC | 31.03.2011 | ||
Former [2011/31] | AT | 28.07.2010 | |
BE | 28.07.2010 | ||
CY | 28.07.2010 | ||
DK | 28.07.2010 | ||
FI | 28.07.2010 | ||
IT | 28.07.2010 | ||
NL | 28.07.2010 | ||
SE | 28.07.2010 | ||
GR | 29.10.2010 | ||
ES | 08.11.2010 | ||
PT | 29.11.2010 | ||
Former [2011/19] | AT | 28.07.2010 | |
BE | 28.07.2010 | ||
CY | 28.07.2010 | ||
DK | 28.07.2010 | ||
FI | 28.07.2010 | ||
NL | 28.07.2010 | ||
SE | 28.07.2010 | ||
GR | 29.10.2010 | ||
PT | 29.11.2010 | ||
Former [2011/16] | AT | 28.07.2010 | |
BE | 28.07.2010 | ||
CY | 28.07.2010 | ||
FI | 28.07.2010 | ||
NL | 28.07.2010 | ||
SE | 28.07.2010 | ||
GR | 29.10.2010 | ||
PT | 29.11.2010 | ||
Former [2011/15] | AT | 28.07.2010 | |
CY | 28.07.2010 | ||
FI | 28.07.2010 | ||
NL | 28.07.2010 | ||
SE | 28.07.2010 | ||
GR | 29.10.2010 | ||
PT | 29.11.2010 | ||
Former [2011/13] | AT | 28.07.2010 | |
CY | 28.07.2010 | ||
FI | 28.07.2010 | ||
NL | 28.07.2010 | ||
PT | 29.11.2010 | ||
Former [2011/10] | AT | 28.07.2010 | |
FI | 28.07.2010 | ||
NL | 28.07.2010 | ||
PT | 29.11.2010 | ||
Former [2011/08] | AT | 28.07.2010 | |
NL | 28.07.2010 | Documents cited: | Search | [A]US5418786 (LOYER BRUCE A [US], et al) [A] 1-34 * the whole document * * figure 1 *; | [A]US5485456 (SHTAYER RONEN [IL], et al) [A] 1-34 * the whole document * * figures 1-17 *; | [A]US5619499 (NAKABAYASHI TAKEO [JP]) [A] 1-34 * the whole document * * figures 24,28,35,38 *; | [A]WO9836541 (ITALTEL SPA [IT]) [A] 1-34 * the whole document * * figures 1,3-5 *; | [PA] - ATM FORUM TECHNICAL COMMITTEE, "UTOPIA Level 4", ATM FORUM, (200003), pages 1 - 30, URL: www.atmforum.com, (20030701), XP002246012 [PA] 1-34 * the whole document * |