blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1090826

EP1090826 - Friction wedge for a railroad car truck having a replaceable wear member [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  18.02.2011
Database last updated on 11.09.2024
Most recent event   Tooltip18.02.2011Application deemed to be withdrawnpublished on 23.03.2011  [2011/12]
Applicant(s)For all designated states
English Welsh & Scottish Railway Holdings Limited
Lakeside Business Park Carolina Way Doncaster
South Yorkshire DN4 5PN / GB
[2009/22]
Former [2005/34]For all designated states
English Welsh & Scottish Railway Holdings Limited
McBeath House 310 Goswell Road London
WC1V 7LW / GB
Former [2003/46]For all designated states
Powell Duffryn Rail Limited
Cambrian House, Charnwood Court
Parc Nantgarw, Cardiff CF15 7QZ / GB
Former [2002/50]For all designated states
Meridian Rail Information Systems Corporation
335 Eisenhower Lane South
Lombard, Illinois 60148 / US
Former [2001/15]For all designated states
Naco Incorporated
335 Eisenhower Lane South
Lombard, Illinois 60148 / US
Inventor(s)01 / Duncan, Scott R.
86 East Harbor Drive
Lake Zurich, Illinois 60047 / US
02 / Irving, Robert M.
746 Bluff Street, 204
Carol Stream, IL 60188 / US
03 / Skawinski, Valerian S.
440 E. Butterfield Road
Elmhurst, Illinois 60126 / US
 [2007/32]
Former [2001/18]01 / Duncan, Scott R.
86 East Harbor Drive
Lake Zurich, Illinois 60047 / US
02 / Irving, Robert M.
746 Bluff Street,#204
Carol Stream, IL 60188 / US
03 / Skawinski, Valerian S.
440 E. Butterfield Road
Elmhurst, Illinois 60126 / US
Former [2001/15]01 / Duncan, Scott R.
86 East Harbor Drive
Lake Zurich, Illinois 60047 / US
02 / Irving, Robert M.
146 S. Berteau Avenue
Bartlett, Illinois 60103 / US
03 / Skawinski, Valerian S.
440 E. Butterfield Road
Elmhurst, Illinois 60126 / US
Representative(s)Lamb, Richard Andrew
Urquhart-Dykes & Lord LLP
Altius House
1 North Fourth Street
Milton Keynes, MK9 1NE / GB
[N/P]
Former [2005/34]Lamb, Richard Andrew
Urquhart-Dykes & Lord LLP New Priestgate House, 57 Priestgate Peterborough
Cambs. PE1 1JX / GB
Former [2003/26]Bailey, Richard Alan, et al
Marks & Clerk, 27 Imperial Square
Cheltenham, GL50 1RQ / GB
Former [2001/15]Goodenough, Nigel, et al
A.A. Thornton & Co. 235 High Holborn
London WC1V 7LE / GB
Application number, filing date00308739.204.10.2000
[2001/15]
Priority number, dateUS1999041436807.10.1999         Original published format: US 414368
[2001/15]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP1090826
Date:11.04.2001
Language:EN
[2001/15]
Search report(s)(Supplementary) European search report - dispatched on:EP31.01.2001
ClassificationIPC:B61F5/12
[2001/15]
CPC:
B61F5/122 (EP,US)
Designated contracting statesAT,   BE,   CH,   CY,   DE,   DK,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE [2001/15]
TitleGerman:Reibungskeil eines Eisenbahndrehgestells mit einem austauschbaren Verschleisselement[2001/15]
English:Friction wedge for a railroad car truck having a replaceable wear member[2001/15]
French:Coin de friction pour bogie ferroviaire ayant un élément d'usure remplaçable[2001/15]
Examination procedure04.10.2001Examination requested  [2001/49]
24.04.2007Despatch of a communication from the examining division (Time limit: M06)
25.02.2008Reply to a communication from the examining division
15.03.2010Despatch of a communication from the examining division (Time limit: M06)
27.09.2010Application deemed to be withdrawn, date of legal effect  [2011/12]
29.10.2010Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2011/12]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
25.02.2008Request for further processing filed
25.02.2008Full payment received (date of receipt of payment)
Request granted
10.03.2008Decision despatched
Fees paidRenewal fee
04.11.2002Renewal fee patent year 03
14.10.2003Renewal fee patent year 04
14.10.2004Renewal fee patent year 05
12.10.2005Renewal fee patent year 06
12.10.2006Renewal fee patent year 07
12.10.2007Renewal fee patent year 08
28.03.2008Renewal fee patent year 09
11.08.2009Renewal fee patent year 10
Penalty fee
Additional fee for renewal fee
31.10.200203   M06   Fee paid on   04.11.2002
31.10.201011   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[DAX]US2827987  (WILLIAMS RAY C) [DA] 1,18-20 * column 4, lines 66-74; figures 2-4 * [X] 21;
 [A]US3559589  (WILLIAMS RAY C) [A] 1,18-21 * the whole document *;
 [A]US3834320  (TACK C) [A] 1,18-21 * the whole document *;
 [A]US4986192  (WIEBE DONALD [US])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.