blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1151335

EP1151335 - OPTO-MECHANICAL VALVE AND VALVE ARRAY FOR FIBER-OPTIC COMMUNICATION [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  28.01.2005
Database last updated on 29.07.2024
Most recent event   Tooltip28.01.2005Application deemed to be withdrawnpublished on 16.03.2005  [2005/11]
Applicant(s)For all designated states
Memlink Ltd.
6 Galgalei Haplada Street
Herzlia Pituach 46733 / IL
[2001/45]
Inventor(s)01 / CHERTKOW, Roberto, Igal
Hermon Street 6B/8
77709 Ashdod / IL
 [2001/45]
Representative(s)Becker Kurig & Partner Patentanwälte mbB
Bavariastraße 7
80336 München / DE
[N/P]
Former [2001/45]Becker Kurig Straus
Patentanwälte Bavariastrasse 7
80336 München / DE
Application number, filing date00907240.610.02.2000
[2001/45]
WO2000US03354
Priority number, dateUS19990119625P11.02.1999         Original published format: US 119625 P
US19990123865P11.03.1999         Original published format: US 123865 P
[2001/45]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO0052835
Date:08.09.2000
Language:EN
[2000/36]
Type: A2 Application without search report 
No.:EP1151335
Date:07.11.2001
Language:EN
The application published by WIPO in one of the EPO official languages on 08.09.2000 takes the place of the publication of the European patent application.
[2001/45]
Search report(s)International search report - published on:US21.12.2000
ClassificationIPC:G02B6/26
[2001/45]
CPC:
G02B6/3518 (EP); G02B6/3514 (EP); G02B6/3556 (EP);
G02B6/357 (EP); G02B6/3584 (EP)
Designated contracting statesAT,   BE,   CH,   CY,   DE,   DK,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE [2001/45]
Extension statesALNot yet paid
LTNot yet paid
LVNot yet paid
MKNot yet paid
RONot yet paid
SINot yet paid
TitleGerman:OPTOMECHANISCHES VENTIL UND VENTILBATTERIE FÜR FASEROPTISCHE ÜBERTRAGUNG[2001/45]
English:OPTO-MECHANICAL VALVE AND VALVE ARRAY FOR FIBER-OPTIC COMMUNICATION[2001/45]
French:VALVE OPTOMECANIQUE ET RESEAU DE VALVES POUR COMMUNICATION PAR FIBRE OPTIQUE[2001/45]
Entry into regional phase06.06.2001National basic fee paid 
06.06.2001Search fee paid 
06.06.2001Designation fee(s) paid 
06.06.2001Examination fee paid 
Examination procedure18.07.2000Request for preliminary examination filed
International Preliminary Examining Authority: US
06.06.2001Examination requested  [2001/45]
01.09.2004Application deemed to be withdrawn, date of legal effect  [2005/11]
07.10.2004Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2005/11]
Fees paidRenewal fee
26.02.2002Renewal fee patent year 03
28.02.2003Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
29.02.200405   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[A]US6031946  (BERGMANN ERNEST EISENHARDT [US], et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.